Published
Kindergartenzweckverband Gemmerich - Erweiterung Kita Gemmerich, Los 3: Tragwerksplanungsleistungen
Notice number: ocds-mnwr74-b7b7958b-6528-4ac3-bf4a-70fd21fa1932
KEY INFORMATION
- Submission deadline
- • Sep 18, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Kindergartenzweckverband Gemmerich
- Accepted Languages
- DEU
- Tender type
- Services
- Contract Value
- Published date
- Aug 20, 2026
TENDER DESCRIPTION
This tender seeks structural engineering services (Tragwerksplanungsleistungen) for the extension of Kita Gemmerich, involving the design and planning for a new single-story annex to include a dining hall, fresh-cooking kitchen, additional group room, associated WC facilities, ancillary rooms, and technical spaces, alongside the comprehensive renewal of the heating system for both the existing and expanded facilities, all to be executed during ongoing operations. The core scope covers performance phases 1-6 in accordance with HOAI Annex 14, with Leistungsphase 4 being optional, and requires specified Special Services, the application of "Ingenieurtechnische Kontrolle" methodology, and submission of deliverables in various digital formats including DOCX, XLSX, DWG/DXF, IFC, GAEB XML 3.1, and PDF. The contract is structured into Leistungsstufe 1 (Phases 1-4) and Leistungsstufe 2 (Phases 5-6), requiring detailed schedule submissions within three weeks of contract effect or activation, with Leistungsstufe 2 requiring commissioning within 12 months after the completion of prior services. Bidders must demonstrate financial solvency, an absence of insolvency or liquidation proceedings,…
TENDER BRIEF
The contract timeline is structured in performance stages and phases. Initially, the contract includes "Leistungsstufe 1," which covers Leistungsphase 1 (Basic Evaluation), Leistungsphase 2 (Preliminary Planning), Leistungsphase 3 (Draft Planning), and Leistungsphase 4 (Approval Planning). The commissioning of Leistungsphase 4 is optional. "Leistungsstufe 2" includes Leistungsphase 5 (Implementation Planning) and Leistungsphase 6 (Preparation for Awarding).
A detailed schedule for the services in "Leistungsstufe 1" must be prepared by the contractor and submitted to the client for approval within 3 weeks after the contract comes into effect. For "Leistungsstufe 2," a separate detailed schedule must be submitted within 3 weeks of its activation. The deadlines for additional services will be mutually agreed upon when those services are commissioned. The contractor is released from the obligation to provide further services if "Leistungsstufe 2" is not commissioned within 12 months after the completion of the last commissioned services.
Specific contract start or end dates, or a total fixed duration, are not explicitly stated in the provided documents.
Sources
- 1Ingenieurvertrag - Kita Gemmerich - Los 3 - ENTWURF.pdf — “und vereinbaren hierzu Folgendes: Vertragsmuster erstellt durch: www.Ingenieurvertrag-online.de Webeler Rechtsanwälte, RA Gerald Webeler Vergabeberatungsstelle Klaeser GmbH, Dipl.-Ing. (FH) Jürgen Klaeser Ver. 13.0/01-20…”
The core scope of work for this tender involves structural engineering services (Tragwerksplanungsleistungen) for the extension of the Kita Gemmerich project.
The project entails the expansion of the existing kindergarten with a single-story annex that will include a canteen, a fresh cooking kitchen, an additional group room, associated WC facilities, ancillary rooms, and technical rooms. This new annex will be connected to the existing building via a connecting tract. Furthermore, the heating system in both the existing building and the new annex will be renewed. The construction work is planned to occur during ongoing operation of the kindergarten.
The services to be rendered by the contractor encompass all structural engineering services necessary for the completion of the project, based on Annex 14 of the HOAI.
Specifically, the commissioned service phases (Leistungsphasen) include:
- Leistungsphase 2 (Preliminary Design)
- Leistungsphase 3 (Design Draft)
- Leistungsphase 4 (Approval Planning), which is optional and will be commissioned only to the extent required for building approval.
- Leistungsphase 5 (Implementation Planning)
- Leistungsphase 6 (Preparation for Awarding)
Additionally, Special Services (Besondere Leistungen) as detailed in Annex 2 of the contract are to be provided in conjunction with the respective commissioned service phases.
Core deliverables include:
- Documentation of the completion and results of each commissioned service phase, detailing each basic service according to HOAI annexes, particularly Annex 14 for structural engineering.
- Provision of all relevant documents in both digital and analog formats (colored plots) in a timely manner.
- Digital formats for deliverables include Microsoft Word (*.docx) for texts, Microsoft Excel (*.xlsx) for spreadsheets, DWG or DXF for drawings, IFC for three-dimensional representations, and GAEB XML Version 3.1 for bills of quantities, volume, and cost estimations. All documents must also be provided in PDF format.
- All delivered services and documentation are subject to approval by the client (AG), and work on subsequent phases can only commence after the preceding phase has been approved in text form.
- Upon completion of the construction, the contractor must hand over any outstanding documents relevant for construction documentation, billing, and potential warranty claims in digital format.
The client's responsibilities include setting project goals, approving service phases, commissioning special experts if their services are not part of the contract, and fulfilling project-related representation duties. If a digital project room is provided by the client, the contractor is obligated to use it for data exchange.
Sources
- 1Ingenieurvertrag - Kita Gemmerich - Los 3 - ENTWURF.pdf — “Fälligkeit und Abrechnung | 9 8. | Mängelhaftung / Haftpflichtversicherung | 9 Vertragsmuster erstellt durch: www.Ingenieurvertrag-online.de Webeler Rechtsanwälte, RA Gerald Webeler Vergabeberatungsstelle Klaeser GmbH, D…”
- 2Anlage 1 - AVB - Kita Gemmerich - Los 3.pdf — “ist verpflichtet, dem AG jederzeit und kurzfristig Auskunft über die von ihm zu erbringenden und bereits erbrachten Leistungen zu erteilen und Einsicht in alle Unterlagen zu gewähren. Diese Verpflichtung des AN besteht b…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 8 FILES
- Kostenrahmen_Kostenschätzung _06.11.2025.pdf124 KBPDF
- Aufforderung - Kita Gemmerich - Los 3 - ENTWURF.pdf157 KBPDF
- Anlage 4 - Siemon_Tragwerksplanung - Kita Gemmerich - Los 3.pdf53 KBPDF
and 1 other document
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.