TENDER DESCRIPTION
This tender seeks professional services for the planning of outdoor facilities as part of the general renovation of the inclusive and therapeutic daycare center "Kita Helen-Keller-Str. 10", aiming to develop a modern, barrier-free, inclusive, and sustainable outdoor area with high recreational and play quality. The scope of work is structured into HOAI service phases, with Leistungsphasen 1-4 (Basic Evaluation, Preliminary Planning, Design Planning, and Approval Planning) firmly commissioned for completion by May 31, 2027, followed by optional phases 5-9 extending through construction completion by August 30, 2028, and object support. Key technical requirements mandate adherence to DIN-Normen, DIN 18040 for accessibility, ENEV 2016, and other safety guidelines, with all communications and submissions exclusively via the Vergabemarktplatz des Landes NRW in German, including cost estimations per DIN 276 and digital deliverable formats. Bidders must demonstrate sound financial standing, including not being in insolvency or liquidation, fulfilling tax and social security obligations, and declaring relevant turnover for the last three years. Specific deadlines include the submission…
TENDER BRIEF
The contract timeline is structured in phases with specific deadlines:
- Key Milestones/Phases:
- Leistungsphase 1-2 (Basic Evaluation and Preliminary Planning): until January 31, 2027.
- Leistungsphase 3 (Draft Planning): until April 30, 2027.
- Leistungsphase 4 (Approval Planning): until May 31, 2027.
- Leistungsphase 5 (Execution Planning) (optional): until September 15, 2027.
- Leistungsphase 6-7 (Preparation / Assistance with Award) (optional): until September 30, 2027.
- Leistungsphase 8 (optional): until August 30, 2028, for the completion of the construction measure.
- Leistungsphase 9 (Object Supervision) (optional).
- Contract Structure and Staging:
- The contract is intended to be awarded in stages (HOAI-Stufenvertrag).
- Stage 1 includes Leistungsphasen 1-4, which are firmly commissioned.
- Stage 2 covers Leistungsphasen 5-8, which are optional.
- Stage 3 involves Leistungsphase 9, also optional.
- A decision on the optional commissioning of Leistungsphasen 5-9 will be made by the City of Essen promptly after the completion of Leistungsphase 4.
- There is no automatic right for the contractor to be commissioned for further stages from Leistungsphase 5 onwards.
- Specific Deadlines:
- Documents required for the approval of the open space planning must be submitted by the end of October 2026.
The contract start date and total duration are not explicitly stated as single items, but the timeline begins with the provision of approval documents by the end of October 2026 and extends to the completion of the construction measure by August 30, 2028, for optionally commissioned phases.
Sources
- 1Entwurf Vertrag Helen-Keller-Straße I.pdf — “Leistung, einschließlich notwendiger Begehungen 5.10.1.2.Objektbegehung zur Mängelfeststellung vor Ablauf der Verjährungsfristen für Mängelansprüche gegenüber den ausführenden Unternehmen 5.10.1.3.Mitwirken bei der Freig…”
- 2Aufgabenbeschreibung LA_ Helen-Keller-Straße 1_.pdf — “Auftraggeber zu übergeben. Sonstige Unterlagen wie Kostenschätzungen, Kostenberechnungen etc. in PDF- Format. KOSTEN Nach aktuellem Stand liegen die Kosten für die KG500 bei brutto 400.000 €. Seite 9 von 11 BEAUFTRAGUNG…”
The core scope of work for this tender involves the general renovation of the inclusive and therapeutic daycare center "Kita Helen-Keller-Str. 10" for four groups, specifically focusing on the planning of its outdoor facilities. The objective is to develop a modern, barrier-free, inclusive, and sustainable outdoor area with high recreational and play quality for children of various ages and needs. Adherence to guidelines from LVR, Unfallkasse NRW, and DIN 18040 (accessibility), as well as energy-related implementation according to ENEV 2016 (or current version), is mandatory.
The Statement of Work (SOW) is structured according to HOAI (Honorarordnung für Architekten und Ingenieure) service phases, with commissioning planned in stages:
Stage 1: Firmly commissioned services (Leistungsphasen 1-4) include:
- LPH 1 - Grundlagenermittlung (Basic evaluation): Clarifying the task, site inspection, advising on necessary services, and documenting initial findings.
- LPH 2 - Vorplanung (Preliminary planning): Analyzing existing conditions, coordinating objectives, evaluating ecosystem interactions, developing a planning concept (considering topography, ecological and environmental factors, design, and functional requirements), presenting preliminary designs, providing a cost estimate, and documenting results.
- LPH 3 - Entwurfsplanung (Design planning): Elaborating the design based on preliminary planning (including functional, economic, and environmental aspects), coordinating with authorities, detailing the design with specifications for planting, materials, equipment, and legal measures, preparing an object description with compensation measures, and providing a cost calculation and comparison. A special service includes two additional information exchange meetings with the Kita management.
- LPH 4 - Genehmigungsplanung (Approval planning): Preparing and compiling documents for public-law approvals, submitting applications, and adapting planning documents as required.
Stage 2: Optional services (Leistungsphasen 5-8) include:
- LPH 5 - Ausführungsplanung (Implementation planning): Developing the detailed design for execution, creating plans and descriptions (e.g., for surface materials, vegetation, and installations), and updating timelines during execution.
- LPH 6 - Vorbereitung der Vergabe (Preparation for procurement): Creating performance specifications and bills of quantities, determining quantities, coordinating specifications, preparing a schedule, estimating costs based on priced bills, conducting cost control, and compiling tender documents.
- LPH 7 - Mitwirkung bei der Vergabe (Assistance in procurement): Obtaining, reviewing, and evaluating offers, conducting bidder discussions, preparing award proposals, documenting the process, compiling contract documents, performing cost control, and assisting in contract award.
- LPH 8 - Objektüberwachung (Site supervision and documentation): Supervising construction for compliance with approvals and contracts, checking deliveries, coordinating with involved parties, monitoring schedules, documenting construction progress, assisting in measurements and invoice reviews, organizing acceptance of services, monitoring defect remediation, and providing final documentation and cost determination.
Stage 3: Optional services (Leistungsphase 9) include:
- LPH 9 - Objektbetreuung (Object support): Technical evaluation of defects within warranty periods, conducting site inspections for defect detection, and assisting in the release of security deposits.
Key deliverables throughout the project include providing all planning documents in both written and digital formats (.pdf, .dwg, .dxf), submitting cost estimates and calculations in PDF, compiling plan directories, and delivering bills of quantities in GAEB XML formats. The contractor must also provide comprehensive advice, information, cost control, and timely communication regarding project progress and potential delays.
Sources
- 1Entwurf Vertrag Helen-Keller-Straße I.pdf — “unter Berücksichtigung zum Beispiel: der Topographie und der weiteren standörtlichen und ökologischen Rahmenbedingungen, der Umweltbelange einschließlich der natur- und artenschutzrechtlichen Anforderungen und vegetation…”
- 2Aufgabenbeschreibung LA_ Helen-Keller-Straße 1_.pdf — “STADT ESSEN GENERALSANIERUNG KITA HELEN-KELLER-STR. 10 AUFGABENBESCHREIBUNG ZUR FREIANLAGENPLANUNG IN 45141 ESSEN - NORDVIERTEL HELEN-KELLER-STR. 10 Karnap Altenessen Nord •Vogelheim •Katernberg Dellwig Bergeborbeck Gers…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 13 FILES
- FB 67_ZVB_UVgO.pdf756 KBPDF
- FB 67 - Eigenerklärung_124.pdf496 KBPDF
- Entwurf Vertrag Helen-Keller-Straße I.pdf1.4 MBPDF
and 6 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.