Published
Konzeption, Entwicklung, Implementierung, Integration und betriebsfertige Übergabe eines sicheren webbasierten Kundenportals für die Pro Arbeit – Kreis Offenbach – (AöR) – Kommunales Jobcenter
Notice number: 00714363-2026
KEY INFORMATION
- Submission deadline
- • Nov 13, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Pro Arbeit – Kreis Offenbach – (AöR) Kommunales Jobcenter
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Oct 15, 2026
TENDER DESCRIPTION
This tender seeks a general contractor for the design, development, implementation, integration, and operational handover of a secure, web-based customer portal for Pro Arbeit – Kreis Offenbach – (AöR), serving as a digital access channel for SGB II customers. The required solution is a modular, scalable, and extensible overall system, comprising a web frontend and backend, to be deployed exclusively on-premises within the client's existing IT infrastructure. Key technical requirements include robust security mechanisms, adherence to BITV 2.0 / WCAG 2.1 AA accessibility standards, responsive design, and seamless integration with existing systems such as comp.ASS and 2Charta ECM. The project follows an iterative approach, with an anticipated start of execution on April 6, 2027, targeting productive commissioning of the first expansion stage by December 1, 2027, and includes a basic 24-month term for maintenance and support services, extendable up to a maximum of 48 months. Tenderers must provide sales figures for comparable services over the past three years, hold comprehensive liability insurance with specified minimum coverages, and confirm financial solvency and compliance with…
TENDER BRIEF
The contract timeline includes an anticipated start of execution on April 6, 2027. The anticipated productive commissioning (Go-Live) of the first expansion stage of the customer portal is scheduled until December 1, 2027.
Key milestones and phases include:
- Anticipated Award: April 5, 2027.
- Anticipated Start of Execution: April 6, 2027.
- Anticipated Productive Commissioning (Go-Live) of the first expansion stage: December 1, 2027.
The project involves several phases:
- Concept and Fine Specification Phase.
- Implementation and Integration Phase, which includes at least five sprints.
- Test and Acceptance Phase.
- Handover to Regular Operation (Go-Live for all users) after overall acceptance.
- An optional initial Setup and Architecture Phase ("Sprint 0") can be conducted before the iterative implementation.
Maintenance, care, and serviceleistungen (system services) commence on the day of successful overall acceptance. These services have a basic term of 24 months. The client has the option to extend the term twice, each by 12 months, resulting in a maximum total duration for these services of 48 months.
Sources
- 1Anlage 2 - Bewerbungsbedingungen.pdf — “letztverbindliche Angebote: | 09.03.2027 Vorabinformation nach § 134 Abs. 1 GWB: | 25.03.2027 Voraussichtlicher Zuschlag: | 05.04.2027 Bindefrist für letztverbindliche Angebote: | 05.04.2027 Voraussichtlicher Ausführungs…”
- 2Anlage 3 - Leistungsbeschreibung.pdf — “Leistungen für Arbeitgeber nach dem SGB II (z. B. Lohnkostenzuschüsse / Eingliederungszuschüsse, Förderung von Probebeschäftigungen) sowie ggf. weitere förderrelevante Informationen. KP 11 Meldung von Beschäftigungsangeb…”
- 3Anlage 4 - EVB-IT-Systemvertrag.pdf — “die für den neuen Programmstand geltenden Nutzungsrechtsregelungen ersetzt, wobei die in Nummer 4.3.3 bzw. 4.4.3 getroffenen Vereinbarungen auch für diese gelten. Diese neuen Nutzungsrechtsregelungen gelten aber nur unte…”
The core scope of work for this tender involves the development, provision, and commissioning of a web-based overall system. This system is comprised of a web frontend and a backend, initially as Expansion Stage 1.
The project follows an iterative approach, with key phases including:
- A Concept and Detailed Specification Phase for detailing technical and functional requirements through fine concepts and backlog entries.
- An Implementation and Integration Phase where the solution is iteratively developed, integrated, and tested in functional increments.
- A Test and Acceptance Phase that includes functional testing and a pilot operation with a limited user group after the declaration of operational readiness. During this pilot phase, the contractor is responsible for system support and defect resolution.
- Handover to Regular Operation (Go-Live for all users), which includes final documentation and knowledge transfer.
- An optional Initial Setup and Architecture Phase ("Sprint 0") can be conducted before iterative implementation to prepare infrastructure, fundamental architectural decisions, and technical interfaces.
The contractor acts as the responsible general contractor for creating the overall system, including liability for subcontractors' services. The services explicitly include the migration or transfer of existing digital application processes.
Core deliverables and services encompass:
- The web-based overall system itself, including its conception, development, migration, interfaces, documentation, and acceptance.
- Ongoing Serviceleistungen such as maintenance, care, support, and adherence to Service Level Agreements (SLAs).
- Optional Expansion to a second stage (Expansion Stage 2).
- Support Services and the handling of Change Requests, both compensated on a daily rate basis.
- Project and schedule plans, risk and communication plans.
- Provision of an emergency and restart concept before Go-Live.
- The contractor is responsible for the proper installation, configuration, and functionality of the application within the client's IT infrastructure, which includes server operating systems (Microsoft Windows Server 2025 Datacenter Desktop/Core or Ubuntu Server 24.04) and client operating systems (Windows 11 Enterprise).
Sources
- 1Anlage 5 - Preisblatt.xlsx — “,,,,,,,,,, ,Anlage 5 - Preisblatt,,,,,,,,, ,,,,,,,,,, ,,,,,,,,,, ,Pos.,Positionstext,Menge,Einheit,Einheitspreis,Gesamtpreis,,,, ,1,"Entwicklung, Bereitstellung und Inbetriebnahme eines webbasierten Gesamtsystems, besteh…”
- 2Anlage 3 - Leistungsbeschreibung.pdf — “von Projekt- und Terminplan, Risiko- und Kommunikationsplan. Konzept- und Feinspezifikationsphase, in der die in Kapitel 3 und den Anlagen beschriebenen Anforderungen fachlich und technisch detailliert und in Form von Fe…”
- 3Anlage 4 - EVB-IT-Systemvertrag.pdf — “nach erfolgreicher Gesamtabnahme der ersten Ausbaustufe weitere Ausbaustufen (insbesondere arbeitgeberspezifische Services) abzurufen. Die Leistung umfasst ausdrücklich auch die Migration bzw. Überführung bestehender dig…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 21 FILES
- Anlage 10 - Verpflichtungserklärung für Nachunternehmer.docx30 KBDOCX
- Anlage 3 - Anhang D - SLA.pdf395 KBPDF
- Anlage 4.2 - Besondere Vertragsbedingungen.pdf184 KBPDF
and 14 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.