KVA Linth - Siloanlagen FLUWA
Notice number: 00538785-2026
KEY INFORMATION
- Submission deadline
- • Sep 15, 2026
- Location
- 🇨🇭 Switzerland
- Contracting authority
- KVA Linth
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 4, 2026
TENDER DESCRIPTION
This tender, KVA Linth - Silo Systems FLUWA, encompasses the complete delivery and services for Siloanlagen FLUWA, specifically involving the replacement of the quicklime silo, the provision of fly ash silos, and the implementation of a pneumatic conveying system, along with extensive documentation and training across all project phases. Key technical requirements include an Automation Firewall, an Open System process control, unencrypted/uncoded application software, Ethernet, WeyTec-System, object-oriented programming, Bus-Systems for third-party communication, a PC-based redundant control system, and the use of BIM with IFC/NWD formats for 3D modeling. Financially, bidders must demonstrate an average annual turnover for the last five business years that is three times the offer price or higher. The project timeline commences with contract signing, targeting definitive planning approval by October 26, 2026, and planning document approval by November 30, 2026, with the realization phase culminating by August 16, 2030, spanning 459.8 weeks and incorporating critical milestones like silo delivery, assembly, and commissioning.
TENDER BRIEF
The contract timeline includes the following details:
- Contract Start Date: The contract begins with the "Unterzeichnung Werkvertrag" (Signing of the contract).
- Contract End Date: The "Realisierung" (Realization) phase, which appears to encompass the main project, is scheduled to end on Friday, August 16, 2030.
- Total Duration: The "Realisierung" phase has a total duration of 459.8 weeks.
- Key Milestones/Phases:
- Phases:
- Planungsphase (Planning Phase): This phase extends from the signing of the contract until the approval of the planning documents. Key milestones in this phase include "Definitive Planungsfreigabe" (Definitive planning approval) on Monday, October 26, 2026, and "Genehmigung Planungsunterlagen" (Approval of planning documents) on Monday, November 30, 2026.
- Realisierungsphase (Realization Phase): This phase starts after the approval of the planning documents.
- Integrationsphase (Integration Phase): This phase includes "Inbetriebnahme" (Commissioning).
- Betriebsphase (Operation Phase): This phase follows the realization and integration.
- Key Milestones (with specific dates where available):
- Unterzeichnung Werkvertrag (Signing of the contract)
- Meilenstein: Definitive Planungsfreigabe (Definitive Planning Approval): Monday, October 26, 2026.
- Meilenstein: Genehmigung Planungsunterlagen (Approval of Planning Documents): Monday, November 30, 2026.
- Fertigung, Beschaffung (Manufacturing, Procurement)
- Montagefreigabe Fremdaschesilos (Assembly Release for Foreign Ash Silos)
- Lieferung Fremdaschen-Silos (Delivery of Foreign Ash Silos): Friday, April 9, 2027.
- Freigabe Montage Fremdaschensilo (Approval for Assembly of Foreign Ash Silo): Friday, April 9, 2027.
- Montage Fremdaschensilo und pneum. Förderung (Assembly of Foreign Ash Silo and Pneumatic Conveyance): Monday, April 12, 2027, to Friday, April 23, 2027.
- Provisorische Lieferabnahme Fremdaschesilos (Provisional Delivery Acceptance for Foreign Ash Silos)
- Montagefreigabe Branntkalksilo (Assembly Release for Quicklime Silo)
- Rückbau altes Brandtlaksilo inkl. Stahlbau (Dismantling of Old Quicklime Silo including Steel Structure): Monday, October 18, 2027, to Monday, November 1, 2027.
- Montage Branntkalksilo inkl. Stahlbau (Assembly of Quicklime Silo including Steel Structure): Monday, November 1, 2027, to Monday, November 15, 2027.
- Provisorische Lieferabnahme Branntkalksilo (Provisional Delivery Acceptance for Quicklime Silo)
- Inbetriebnahme (Commissioning)
- Abschluss aller Montageendkontrollen (Completion of all final assembly checks)
- Abschluss Probebetrieb (Completion of Trial Operation)
- Provisorische Übernahme (Provisional Acceptance)
- Übergang von Eigentum und Gefahr an den Bauherrn (Transfer of Ownership and Risk to the Client)
- Abschluss bauliche & betriebliche Massnahmen (Completion of Constructional & Operational Measures)
- Definitive Übernahme (Definitive Acceptance)
- Beginn 10-jährige Verjährungsfrist für Ansprüche aus Vertrag (versteckte Mängel) (Start of 10-year limitation period for claims arising from the contract for hidden defects).
Sources
- 1DA02 Visualisierung Projektablauf Siloanlagen FLUWA.pdf — “Visualisierung Projektablauf Visualisierung Projektablauf Beilage zum Werkvertrag REALISIERUNGSPHASE § PLANUNGSPHASE Projektmeilensteine: Definitive Lastangaben Definitive R&I Definitive EMSRL-Listen etc. Absch…”
- 2Siloanlagen FLUWA_Teil A_Rechtliche Bestimmungen.pdf — “von wichtigen Dokumenten enthält. Der Terminplan ermöglicht im Weitern die erforderliche terminliche Abstimmung der Schnittstellen des AN mit anderen AN des AG (z. B. Bautechnik, EMSRL-T etc.). Der Terminplan wird vom AN…”
- 3DA03 Projektterminplan Siloanlagen FLUWA.pdf — “Confidential DA03 Projektterminplan Siloanlagen FLUWA Revision 01 Dokumentersteller Name Datum Erstellt F. Schittler 10.07.2026 Geprüft A. Lüchinger 29.07.2026 Gesamtleitung & Fachplanung VT DA03 Projektterminplan Siloan…”
The core scope of work for this tender involves the "Liefer- und Leistungsumfang" (delivery and scope of services) for Siloanlagen FLUWA. Key components of this scope include:
- Replacement of the quicklime silo (Branntkalksilo).
- Fly ash silos (Flugaschensilos).
- Pneumatic conveying system (Pneumatisches Fördersystem).
The statement of work summary includes various deliverables and documentation throughout the project phases:
- General and Schedule Documents: Project-related quality management description, organizational chart, responsibilities, key personnel, engineering quality plan, audit reports for sub-suppliers, document delivery plan, project risk analysis, and detailed schedules for all execution phases and components.
- Proof and Protocols: EMC protection proof, earthing measurement protocols, proof of potential equalization and earthing, lightning protection proof, pressure test, inspection, and test protocols.
- Quality Control and Assurance: Protocols for incoming deliveries, construction acceptance before assembly, quality plans for fabrication, manufacturing, construction, assembly, commissioning, and trial operation, along with corresponding audit and test reports.
- Reporting: Monthly progress reports detailing progress, schedule status, current activities, project risk analysis, and planned next steps.
- Final Inspections and Acceptance: Final assembly control protocols, functional control protocols (cold and warm commissioning), performance test protocols, and acceptance protocols and certificates.
- Certificates: Test certificates for acceptance-required components and material certificates for special materials.
- Technical Documentation: Equipment lists, terminal connection diagrams for all consumers and measuring instruments, MSR-sheets, device specifications with setting data and parameters, parameterization data for frequency converters, assembly disposition schemes (hook-ups), drafts for circuit diagrams on the PLS (part of the functional description), cable routing plans (for autonomous systems), electrical cabinet layouts (for autonomous systems), earthing and potential equalization concepts, and lightning protection concepts.
- Training: Training concepts and training plans, including data, duration, and target audience.
The tender also outlines the structure of the bidding documents, which includes sections for technical specifications (C1 Delivery and Scope of Services, C2 Technical Data, C3 Technical Guarantees, C4 Execution Regulations) and integrated contract appendices.The core scope of work for this tender includes the delivery and services related to Siloanlagen FLUWA, specifically encompassing the replacement of the quicklime silo, the provision of fly ash silos, and the implementation of a pneumatic conveying system.
The statement of work summary involves numerous deliverables and documentation requirements across different project stages:
- Planning and Management Documentation: This includes a description of project-specific quality management, an organizational chart, detailing responsibilities and key personnel, an engineering quality plan, audit reports from sub-suppliers, a document delivery schedule, a project risk analysis, and comprehensive detailed schedules outlining the start, intermediate, and final dates for all execution phases and individual components.
- Compliance and Testing: Documentation proving EMC protection, earthing measurement protocols, proof of potential equalization and earthing for delivered system components, lightning protection proof for the system, and protocols for pressure tests, inspections, and functional tests.
- Quality Assurance: Protocols for the control of incoming deliveries, construction acceptance before assembly begins, and quality plans for fabrication, manufacturing, construction, assembly, commissioning, and trial operation, complete with associated audit and test reports.
- Reporting: Monthly progress reports are required, which must include information on the current progress, adherence to the schedule, ongoing activities, updates to the project risk analysis, and planned next steps.
- Final Project Stages: Protocols for final assembly controls and acceptances, functional controls during cold and warm commissioning, performance tests, and official acceptance protocols and certificates.
- Certifications: Test certificates for components requiring acceptance and material certificates for specialized materials.
- Technical Designs and Schematics: Deliverables such as equipment lists, terminal connection diagrams for all consumers and measuring instruments, MSR-sheets, device specifications including setting data, limit values, and control parameters, parameterization data for frequency converters, assembly disposition schemes (hook-ups), draft circuit diagrams for visualization on the PLS (as part of the functional description), cable routing plans for autonomous systems, and layouts for electrical cabinets showing dimensions and arrangements.
- Safety Concepts: Concepts for earthing and potential equalization, and lightning protection.
- Training: Comprehensive training concepts and detailed training plans, specifying dates, durations, and target personnel.
The tender documents are structured into several parts, including "Teil C1 Liefer- und Leistungsumfang" (Part C1 Scope of Delivery and Services), "Teil C2 Technische Daten" (Part C2 Technical Data), "Teil C3 Technische Garantien" (Part C3 Technical Guarantees), and "Teil C4 Ausführungsvorschriften" (Part C4 Execution Regulations), all of which contribute to defining the overall scope.
Sources
- 1Siloanlagen FLUWA_Teil C1_Lieferumfang.pdf — “Confidential Teil C1 Liefer- und Leistungsumfang Siloanlagen FLUWA Revision 01 Dokumentersteller Name Datum Erstellt S. Ringmann 30.06.2026 Geprüft W. Furgler 07.07.2026 Gesamtleitung + Projektleitung VT SILOANLAGEN FLUW…”
- 2DB01 Dokumentenliste.pdf — “nein nein ja Liefertermin für definitives Dokument Index Genehmigung durch Auftraggeber erforderlich Kenntnisnahme durch Auftraggeber erforderlich Bestandteil der Enddokumentation Dokument Zeilennummer Legende: X = zu li…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 70 FILES
- L25-00-101-00028-05-AV01 Anlagentechnik.pdf2.3 MBPDF
- Siloanlagen FLUWA_Teil C3_Garantien.pdf360 KBPDF
- L25-00-101-00214-00-Beilage1 zu AV48 RiLi Harmonisierung Kabeltypen.pdf659 KBPDF
and 63 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.