    Leistungen der Gebäudeplanung nach Teil 3 Abschnitt 1 HOAI und Leistungen der Technischen Ausrüstung Teil 4, Abschnitt 2 HOAI

    Notice number: ocds-mnwr74-0d380312-7b76-40c6-8806-f8c27c43f144

    🇩🇪 GermanyVermögen und Bau Baden-Württemberg, Amt UlmServices

    KEY INFORMATION

    Submission deadline
    Sep 8, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Vermögen und Bau Baden-Württemberg, Amt Ulm
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 5, 2026

    TENDER DESCRIPTION

    This tender invites proposals for comprehensive planning services related to the "Universität Ulm Planung Ersatzforum" and "Ulm, Universität, N24, Sanierung R384 und Erneuerung Aufzugstüren + Bauunterhalt," covering both building planning (Part 3 Section 1 HOAI) and technical equipment planning (Part 4 Section 2 HOAI). The core scope encompasses detailed services across phases including Basic Evaluation, Preliminary Planning, Draft Planning (incorporating system and integration planning, cost calculation per DIN 276 - 1: 2018-12), Approval Planning, and Execution Planning, alongside special services like detailed economic efficiency analysis and Technical Monitoring. While specific technical constraints or methodologies beyond the HOAI framework are not specified, bidders must possess professional liability insurance with a minimum coverage of 2 million Euros for personal injury and 2 million Euros for other damages, with an annual compensation maximum at least double the coverage amount. The contract outlines adherence to binding dates for specified services across initial phases, with further dates to be agreed upon, and acknowledges the client's right to adjust or modify…

    TENDER BRIEF

    The contract outlines several key phases, including Leistungsphase 1: Grundlagenermittlung (Basic Evaluation), Leistungsphase 2: Vorplanung (Preliminary Planning), and Leistungsphase 3: Entwurfsplanung (Draft Planning). While the contract states that the contractor must adhere to binding contract dates for the services specified in § 3 Number 3.2, and that further dates will be agreed upon with subsequent commissions, the specific start date, end date, or total duration are not explicitly provided in the document. The client reserves the right to adjust or modify these dates as needed, and the contractor is obligated to agree to such changes.

    Sources

    • 1M215_Anl1_Technik KG440 u 450.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…
    • 2M215_Anl1_Technik KG410 420 430.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…
    • 3M210_Anl1_Gebäude.docx — “Vertragsnummer.: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung auf Grundlage der Vorgaben oder der Bedarfsplanung des Auftraggebers | Ortsbe…
    • 426-92018 TGA Vertrag MUSTER.docx — “der Vertragsziele oder des Leistungsablaufs sowie zusätzliche Leistungen anzuordnen. | 5.2 | Die Auftragnehmerin oder der Auftragnehmer ist verpflichtet, solche Leistungsänderungen, Leistungserweiterungen oder Zusatzleis…
    • 526-92018 Gebäude Vertrag MUSTER.docx — “colspan=2/> | Bodenmechanik, Erd- und Grundbau | | | | Brandschutz | | | | Sicherheits- und Gesundheitsschutzkoordination | | | | Inbetriebnahmemanagement und Technisches Monitoring | | | | Koordination Bewertungssystem…

    The core scope of work for this tender involves planning services for the "Universität Ulm Planung Ersatzforum" and "Ulm, Universität, N24, Sanierung R384 und Erneuerung Aufzugstüren + Bauunterhalt". These services are categorized under building planning (Teil 3 Abschnitt 1 HOAI) and technical equipment planning (Teil 4, Abschnitt 2 HOAI).

    The Statement of Work (SOW) is structured into several phases with the following core deliverables:

    1. Grundlagenermittlung (Basic Evaluation):

    • Clarifying the task based on client specifications and demand planning.
    • Determining planning parameters and advising on service requirements and technical development.
    • Conducting site inspections.
    • Formulating decision aids for selecting other involved planning parties.
    • Summarizing, explaining, and documenting results.

    2. Vorplanung (Preliminary Planning):

    • Analyzing fundamentals and coordinating services with planning participants.
    • Developing a planning concept, including preliminary dimensioning of systems, investigating alternative solutions, and graphic representation for integration into object planning.
    • Creating functional or principle circuit diagrams for each system.
    • Clarifying cross-disciplinary processes, boundary conditions, and interfaces, and assisting with technical system integration.
    • Conducting preliminary negotiations with authorities regarding approval and infrastructure.
    • Performing cost estimation (DIN 276 - 1: 2018-12, 2nd level) and assisting with schedule planning.
    • Preparing a schedule for planning and construction.
    • Documenting results.

    3. Entwurfsplanung (Draft Planning / System and Integration Planning):

    • Developing a detailed planning concept considering all specialist and integrated technical requirements.
    • Defining all systems and plant components.
    • Calculating and dimensioning technical systems, estimating annual demand values (e.g., energy demand) and operating costs, and coordinating space requirements.
    • Updating and detailing functional and schematic diagrams.
    • Listing systems with technical data for energy balancing and providing system descriptions.
    • Negotiating with authorities regarding approval feasibility.
    • Conducting cost calculation (DIN 276 - 1: 2018-12, 3rd level) and cost control against the estimate.
    • Updating the schedule.
    • Documenting results.

    4. Genehmigungsplanung (Approval Planning):

    • Developing and compiling all necessary documents and proofs for public-law approvals, including applications for exceptions, and assisting in negotiations with authorities.
    • Completing and adapting planning documents, descriptions, and calculations.

    5. Ausführungsplanung (Execution Planning):

    • Developing the execution planning based on the results of phases 3 and 4.

    Special Services (Besondere Leistungen) include:

    • Detailed economic efficiency analysis.
    • Detailed calculation of consumption-dependent operating costs.
    • Compiling technical characteristic values for primary energy verification.
    • Technical Monitoring (TMon) services, such as handing over planning status, coordinating monitoring concept contents (e.g., test parameters, target values, data provision), and incorporating requirements into specialized planning.

    Sources

    • 1M215_Anl1_Technik KG440 u 450.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…
    • 2M215_Anl1_Technik KG410 420 430.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…
    • 3M210_Anl1_Gebäude.docx — “Vertragsnummer.: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung auf Grundlage der Vorgaben oder der Bedarfsplanung des Auftraggebers | Ortsbe…
    • 4M107_2_Verzeichnis_Unterauftraege_26-92018.docx — “| Bewerberin oder Bewerber/Bieterin oder Bieter | Vergabenummer | Datum | 26-92018 | Baumaßnahme | Ulm, Universität, N24, Sanierung R384 und Erneuerung Aufzugstüren + Bauunterhalt, 89081 Ulm, Albert-Einstein-Allee 11 Lei…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 23 FILES

    • M107_1_Erklaerung_Bieter_Arbeitsgemeinschaft_26-92018.docx
    • M215_Anl1_Technik KG410 420 430.docx
    • 2026_02_25_Auszug Machbarkeitsstudie Ersatzforum.pdf

    and 16 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders