Published
Leistungen der Gebäudeplanung nach Teil 3 Abschnitt 1 HOAI und Leistungen der Technischen Ausrüstung Teil 4, Abschnitt 2 HOAI
Notice number: 00547739-2026
KEY INFORMATION
- Submission deadline
- • Sep 8, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Vermögen und Bau Baden-Württemberg, Amt Ulm
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 7, 2026
TENDER DESCRIPTION
This tender invites proposals for comprehensive planning services for the "Ersatzforum" project at the University of Ulm's N24 building, involving significant renovation, elevator door renewal, and general building maintenance, with an estimated total construction cost of €2,270,000 gross. The core scope includes extensive Building Planning, such as demolition, floor plan reorganization to create continuous forum and event zones, and upgrades, alongside the design of Technical Building Equipment for Heating/Ventilation/Sanitary/Air Conditioning (HLSK) and Electrical (ELT) systems. These services, targeting completion by Q4/2027, aim to enhance functionality, aesthetics, and create new learning and communication spaces within the facility. The planning phases include Leistungsphase 1 (Basic Evaluation), Leistungsphase 2 (Preliminary Planning), and Leistungsphase 3 (Draft Planning), requiring adherence to binding contract dates and compliance with technical standards such as GAEB DA XML (latest), STLB-Bau (newest), DWG-format, PlanTeam-SPACE (PTS), VDI 6026, and VHB. Bidders must also provide professional indemnity insurance with a minimum coverage of €2 million for personal injury…
TENDER BRIEF
The contract timeline includes several key phases of service: Leistungsphase 1: Grundlagenermittlung (Basic Evaluation), Leistungsphase 2: Vorplanung (Preliminary Planning), and Leistungsphase 3: Entwurfsplanung (Draft Planning). The contractor is required to adhere to binding contract dates for the services, and additional contract dates will be agreed upon with further commissioning. If no specific contract dates are agreed upon, the contractor must perform services in a timely manner to avoid delays in the planning and construction process. The creation of a schedule outlining the main planning and construction processes is also mentioned.
However, the contract start date, end date, and total duration are not explicitly stated in the provided documents. Therefore, these details cannot be provided.
Sources
- 1M215_Anl1_Technik KG440 u 450.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…”
- 2M215_Anl1_Technik KG410 420 430.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…”
- 3M210_Anl1_Gebäude.docx — “Vertragsnummer.: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung auf Grundlage der Vorgaben oder der Bedarfsplanung des Auftraggebers | Ortsbe…”
- 426-92018 TGA Vertrag MUSTER.docx — “der Vertragsziele oder des Leistungsablaufs sowie zusätzliche Leistungen anzuordnen. | 5.2 | Die Auftragnehmerin oder der Auftragnehmer ist verpflichtet, solche Leistungsänderungen, Leistungserweiterungen oder Zusatzleis…”
- 526-92018 Gebäude Vertrag MUSTER.docx — “colspan=2/> | Bodenmechanik, Erd- und Grundbau | | | | Brandschutz | | | | Sicherheits- und Gesundheitsschutzkoordination | | | | Inbetriebnahmemanagement und Technisches Monitoring | | | | Koordination Bewertungssystem…”
The core scope of work for this tender involves planning services for the "Ersatzforum" at the University of Ulm, specifically for the N24 building, which includes the renovation of R384, renewal of elevator doors, and general building maintenance.
The project's overarching goals are to improve the quality of stay, orientation, and functionality, create additional learning and communication spaces, and reorganize/optimize flanking functional rooms such as the study secretariat and an interim info point/main entrance. The timely completion of these measures is expected by Q4/2027.
The planning services encompass:
- Building Planning (Hochbau): This includes the demolition of interior walls, ceiling linings, and old technical installations (including hazardous material handling). It also involves opening existing areas to the inner courtyard, reorganizing floor plans to create continuous forum and event zones and a new interim main entrance, upgrading existing building components (stairwells, railings, doors), and planning for windbreak widening and new entrance areas. Further measures include installing mobile glass partitions for flexible learning boxes, implementing structural improvements for visual enhancement (flooring, wall surfaces, acoustics, lighting), establishing a new info point, event offices, and supplementary functional areas. The scope also covers developing a design concept for learning, lounge, and foyer zones, ensuring barrier-free access, and adhering to assembly place ordinance requirements for 800 people.
- Technical Building Equipment (TGA):
- Heating/Ventilation/Sanitary/Air Conditioning (HLSK): This involves technical installation aligned with the overall architectural and interior design concept, reviewing and adjusting existing ventilation system capacities, verifying CO2 guideline values and air exchange rates, adapting heating installations for improved comfort, developing a thermal and indoor climate concept for multifunctional event use, and repairing existing installations.
- Electrical (ELT): This covers the renewal of lighting for energy efficiency and light quality (including dimming) while integrating new suspended ceilings, adjusting safety power supply and emergency lighting, adapting fire alarm and alerting systems to a new fire protection and security concept, providing cabling, basic IT infrastructure, digital signage/info points, and general electrical installation according to the room and event concept.
The services are to be carried out in stages, including planning phases such as basic evaluation (Leistungsphase 1), preliminary planning (Leistungsphase 2), and design planning (Leistungsphase 3) as detailed in the contract annexes for various technical groups and building planning. The estimated total construction cost is 2,270,000 Euro gross.
Sources
- 1M215_Anl1_Technik KG440 u 450.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…”
- 2M215_Anl1_Technik KG410 420 430.docx — “Vertragsnummer: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung aufgrund der Vorgaben oder der Bedarfsplanung des Auftraggebers im Benehmen mi…”
- 3M107_2_Verzeichnis_Unterauftraege_26-92018.docx — “| Bewerberin oder Bewerber/Bieterin oder Bieter | Vergabenummer | Datum | 26-92018 | Baumaßnahme | Ulm, Universität, N24, Sanierung R384 und Erneuerung Aufzugstüren + Bauunterhalt, 89081 Ulm, Albert-Einstein-Allee 11 Lei…”
- 4Muster_Angebotsschreiben_26-92018.docx — “| Bieterin/Bieter: | | | | Vermögen und Bau Baden-Württemberg Amt Ulm Wilhelm-Runge-Straße 11 89081 Ulm Vergabenummer | : | 26-92018 Projekt | : | Ulm, Universität, N24, Sanierung R384 und Erneuerung Aufzugstüren + Bauun…”
- 5M210_Anl1_Gebäude.docx — “Vertragsnummer.: | 26-92018 Objekt: | Universität Ulm Planung Ersatzforum Leistungsphase 1: Grundlagenermittlung | Klären der Aufgabenstellung auf Grundlage der Vorgaben oder der Bedarfsplanung des Auftraggebers | Ortsbe…”
- 6Muster_Aufforderung_Angebotsabgabe_26-92018.docx — “Vergabestelle | Vergabenummer: 26-92018 Vermögen und Bau Baden-Württemberg Amt Ulm Wilhelm-Runge-Straße 11 89081 Ulm | Datum | : | 04.08.2026 | Telefon | : | +49 731 505 8824 | Name | : | Peter Hubacsek | | | | | | | | |…”
- 726-92018_Aufgabenbeschreibung_M109.docx — “technischen Installationen und Anpassung auf das Architektur- u. Sicherheitskonzept. Verbesserung der Aufenthaltsqualität, der Orientierung und der Funktionsfähigkeit Schaffung zusätzlicher Lern- und Kommunikationsfläche…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 23 FILES
- M215_Anl1_Technik KG440 u 450.docx48 KBDOCX
- M210_Anl1_Gebäude.docx44 KBDOCX
- 26-92018_Aufgabenbeschreibung_M109.docx42 KBDOCX
and 16 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.