Published
Linie 19 - Planungsbegleitende Vermessungsarbeiten
Notice number: 00569932-2026
KEY INFORMATION
- Submission deadline
- • Sep 17, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Stadtwerke Hürth AöR
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 18, 2026
TENDER DESCRIPTION
The subject of the contract award is planning accompanying surveying works for the extension of the light rail line 19 from Hürth-Hermülheim station to Hürth-Zentrum (ZOB). A route approximately 1.4 km long, continuously double-tracked, with two stops as well as the necessary bridge, noise protection and retaining structures and adjustments of existing level crossings is planned. The subject of the contract award is planning accompanying surveying works for the extension of the light rail line 19 from Hürth-Hermülheim station to Hürth-Zentrum (ZOB). A route approximately 1.4 km long, continuously double-tracked, with two stops as well as the necessary bridge, noise protection and retaining structures and adjustments of existing level crossings is planned.
TENDER BRIEF
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 3 FILES
- Submission PortalLINK
- non-restricted-documentLINK
- TED PortalLINK
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.