Published
LPI Suhl, Neubau Wärmeversorgung 2025 IEE 000, Fachplanung TA ELT
Notice number: 00708789-2026
KEY INFORMATION
- Submission deadline
- • Nov 17, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Thüringer Landesamt für Bau und Verkehr (TLBV)
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Oct 14, 2026
TENDER DESCRIPTION
This tender seeks specialized planning services for technical equipment, specifically electrical planning (TA ELT), for the construction of a new water treatment plant in Suhl. The scope encompasses service levels 1 to 4, including preliminary and approval planning, detailed execution planning, assistance in contract awarding, and comprehensive object supervision and documentation through to June 2029. Key technical requirements necessitate adherence to current VDE, DIN, AMEV, and VdS standards, as well as the integration of pellet/gas boiler systems, building automation, and fire/security technology, with all documentation required in digital format. Financially, applicants must demonstrate a minimum total turnover of €270,000 gross over the last three financial years and possess professional indemnity insurance with coverage of at least €1,500,000 for personal injury and €500,000 for other damages, with a double annual payout maximum. A time and schedule plan will be established post-contract, with a contribution to HU-Bau/BBN/Bauunterlage due 20 weeks from the contract date.
TENDER BRIEF
Question: What is the contract timeline?
Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.
The contract timeline includes a completion date (Fertigstellungstermin) of June 2029. The start of construction (Baubeginn) is to be determined by a separate agreement.
Key milestones and phases mentioned are:
- A contribution to the HU-Bau/BBN/Bauunterlage, which is due 20 weeks from the contract date.
- Immediately after contract conclusion, a time and schedule plan (Zeit- und Ablaufplan) for planning, awarding, and execution will be developed in coordination with the client. This plan will be regularly reviewed and updated as project circumstances change.
The specific contract start date and the total duration are not explicitly stated as fixed values in the provided documents.
Sources
- 11322-26 Vertragsentwurf.pdf — “der Muster 16 bis 18 RLBau kann der Auftragnehmer in Abstimmung mit dem Auftraggeber gleichwertige Formulare oder Kostenkontrollinstrumente einsetzen. 5.3.4 Die Kostenobergrenze ist in jeder Leistungsstufe einzuhalten. D…”
The core scope of work for this tender involves specialized planning for technical equipment (Fachplanung - Technische Ausrüstung) for the electrical planning of a new water treatment plant (Neubau WVA Elektroplanung) in Suhl.
The Statement of Work (SOW) is structured into several service levels, or phases:
1. Leistungsstufe 1 (Preliminary Planning, Draft Planning, and Approval Planning): This phase includes analyzing foundational documents, coordinating with other planning participants, developing a planning concept with system pre-dimensioning and alternative solution analyses, preparing graphical representations, creating functional diagrams, clarifying interdisciplinary processes and interfaces, assisting with preliminary negotiations with authorities, and preparing cost estimates according to DIN 276 (second level). It also encompasses compiling submissions and evidence for public-law approvals.
2. Leistungsstufe 2 (Execution Planning): This level covers all necessary services for creating the detailed execution plans.
3. Leistungsstufe 3 (Preparation and Assistance in Awarding Contracts): This involves services related to the procurement process, including comparing tender results with planner-priced specifications or cost calculations.
4. Leistungsstufe 4 (Object Supervision and Documentation): This phase focuses on supervising construction to ensure defect-free and contract-compliant execution, particularly for sensitive and subsequently inaccessible works, and reviewing incoming invoices.
Key deliverables and responsibilities explicitly stated include:
- Developing a planning concept with pre-dimensioning and examination of alternative solutions, considering project goals and sustainability.
- Producing graphical representations for integration into object planning and functional diagrams/schematics for each system.
- Clarifying and explaining essential interdisciplinary processes, boundary conditions, and interfaces, and assisting with the integration of technical systems.
- Coordinating and integrating contributions from specialist participants across all service levels.
- Preparing cost estimates (DIN 276, second level) and cost calculations (DIN 276, third level) along with scheduling.
- Summarizing, explaining, and documenting results using specified templates.
- Submitting drawings, descriptions (including specifications), and calculations in reproducible and digital formats.
- Providing plans such as floor plans, sections, and schematics.
- Developing system descriptions (Anlagenbeschreibungen) with usage conditions.
- Ensuring the execution planning adheres to the cost ceiling.
- Supervising construction activities to ensure quality and compliance, with a focus on critical construction phases.
- Reviewing invoices for verifiability and technical/arithmetical correctness.
The planning services specifically cover electrical planning within cost groups (KGr) 440 and 450.
- KGr 440 includes power supply for the heating plant or functional building (determining connection capacity, load balances, dimensioning and planning of feeders, planning new sub-distribution, low-voltage systems, indoor, outdoor, and safety lighting, and cable routes).
- KGr 450 covers building automation/MSR (measurement, control, and regulation), coordination of HVAC interfaces, expansion of existing control systems, fire alarm, and security technology, as well as weak current/communication systems.
Sources
- 11322-26 Anlage 3 zum Vertrag_spezLeistungspflichten.pdf — “Anlage zu § 6 spezifische Leistungspflichten zum Vertrag Fachplanung - Technische Ausrüstung Vertragsmuster, VM3/2 1322/26-V-EV-81 LPI Suhl Neubau WVA Elektroplanung Anlagengruppe(n): 1.1.1/ 1.1.2/ 1.1.3/ 1.1.4/ 1.1.5/ 1…”
- 21322-26 Vertragsentwurf.pdf — “den Projektzielen nicht vereinbar ist. 5.8.2 Die vom Auftragnehmer vorzulegenden Zeichnungen, Beschreibungen einschließlich der Leistungsverzeichnisse und der Berechnungen sind dem Auftraggeber in kopierfähiger Ausführun…”
- 31322-26 Bewerbungsbogen.pdf — “beinhalten. Definitionen für die erbrachten vergleichbaren Leistungen": Definition 1 Die Fachplanung der technischen Ausrüstung für die Leistungen Vorplanung, Entwurfsplanung, Ausführungsplanung, Vorbereitung der Vergabe…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 14 FILES
- 1322-26 Fbl 712 - Bewerbungsbedingungen.pdf40 KBPDF
- 1322-26 Erstangebot.pdf107 KBPDF
- 1322-26 Fbl 737 - Info zum Datenschutz.pdf693 KBPDF
and 7 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.