TENDER DESCRIPTION
This tender seeks a contractor for the "TRAFFIC FLUIDIZATION THROUGH SUSTAINABLE URBAN MOBILITY MEASURES - CONSTRUCTION OF AN ARTERY WITH A GREEN MOBILITY CORRIDOR ROLE ON THE SOUTH-WEST SIDE OF ALBA IULIA MUNICIPALITY." The core scope involves the execution of works for a 2.3 km Category II road, featuring four traffic lanes, dedicated public transport lanes, sidewalks, bicycle paths, green spaces, six bus stops, two overpasses, and comprehensive road infrastructure including signaling, stormwater systems, public lighting with remote management, and video surveillance. Additionally, the contract mandates the design and execution of coexistence works for existing 0.4 kV and 20 kV electrical networks, including protection, diversion, relocation, and modernization, requiring on-site verification, technical design, approvals from Distribuție Energie Electrică România S.A. – Alba Branch, and commissioning by ANRE-certified operators. The contract has an execution duration of 24 months, a minimum warranty period of 36 months, and is part of a larger project aiming for completion by December 31, 2029. Bidders must demonstrate sound financial standing, free from insolvency or…
TENDER BRIEF
Question: What is the contract timeline?
Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.
The contract timeline includes a contract execution duration of 24 months. Additionally, there is a minimum warranty period of 36 months. The validity of the contract extends until the conventional or legal exhaustion of any effects it produces. The overall project, which this contract is part of, has a finalization deadline of December 31, 2029, under its financing program. The offeror is required to present a general execution schedule that includes the contract finalization term and intermediate terms, and the technical proposal should be structured by contract realization phases and stages. However, specific contract start dates or defined key milestones/phases within the document are not explicitly stated.
Sources
- 1Instructiuni_ofertanti_FisaDate_DF1278630.pdf — “vigoare. Indiferent de momentul inițierii procedurii de atribuire, autoritatea contractanta va verifica, înainte de încheierea contractului, respectarea dispoziţiilor referitoare la angajarea cheltuielilor din bugetele c…”
The core scope of work and statement of work summary for this tender, titled "TRAFFIC FLUIDIZATION THROUGH SUSTAINABLE URBAN MOBILITY MEASURES - CONSTRUCTION OF AN ARTERY WITH A GREEN MOBILITY CORRIDOR ROLE ON THE SOUTH-WEST SIDE OF ALBA IULIA MUNICIPALITY," involves two main components.
A. Execution of works related to the mobility corridor:
This primarily entails the construction of a 2.3 km long, Category II road designed for speeds of 50-60 km/h, aiming to divert traffic and complete the city's ring road. Key deliverables include:
- Realization of four traffic lanes (two per direction).
- Construction of dedicated public transport lanes.
- Building two overpasses over Brândușei and Orlea streets.
- Development of sidewalks and bicycle paths.
- Creation of six bus stops.
- Arrangement of intersections and a roundabout.
- Implementation of stormwater collection and evacuation systems.
- Construction and modernization of utility networks.
- Installation of vertical and horizontal road signaling.
- Realization of public lighting equipped with a remote management system.
- Installation of a video surveillance system.
- Landscaping and installation of urban furniture.
- All necessary related works for the objective's full functionality.
B. Design and execution of works resulting from a coexistence study:
This component addresses existing electrical networks (0.4 kV and 20 kV) managed by Distribuție Energie Electrică România S.A. - Alba Branch, which are impacted by the mobility corridor project. The contractor's responsibilities include:
- On-site verification of the actual network situation.
- Elaboration of technical designs and execution details.
- Ensuring documentation correlation with the road and passage technical projects.
- Verification of documentation by authorized specialists.
- Submission of documentation to DEER - Alba Branch for analysis and approval.
- Obtaining all required permits and approvals.
- Execution of the approved works, which may involve protecting, diverting, relocating, modifying, or decommissioning affected electrical installations.
- Specific works include building approximately 1,331m of 0.4 kV underground electrical network, installing 11 distribution boxes, four measurement and protection blocks, and four poles, restoring consumer connections, creating grounding installations, and decommissioning existing overhead networks (including 26 poles).
- For medium voltage, the scope covers replacing an overhead transformer station with a concrete-enclosed one, equipped with a 250 kVA transformer, 20 kV and 0.4 kV installations, protection equipment, control, and SCADA integration, along with creating 20 kV LES circuits, relocating the medium voltage network, installing new poles, decommissioning existing facilities, and restoring affected areas.
- Performing tests, verifications, and commissioning of the affected installations.
- Preparation and submission of final and as-built documentation.
Sources
- 1Instructiuni_ofertanti_FisaDate_DF1278630.pdf — “la: 1.4) Tipul autoritatii contractante Autoritatea regională sau locală 1.5) Activitate principala Servicii publice generale Sectiunea II Obiectul contractului II.1 Obiectul achizitiei II.1.1 Titlu: Lucrari de executie…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 28 FILES
- Instructiuni_ofertanti_FisaDate_DF1278630.pdf286 KBPDF
- 02. Amenajare peisagistica.zip.p7s13.9 MBP7S
- 01. Infrastructura rutiera.zip.p7s39.5 MBP7S
and 21 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.