    Maitrise d'oeuvre relative à la rénovation énergétique, la restructuration du bâtiment, et l'acces pour TOUS au centre culturel de Pauillac

    Notice number: 26-73804

    🇫🇷 FranceMairie de PauillacServices

    KEY INFORMATION

    Submission deadline
    Sep 15, 2026
    Location
    🇫🇷 France
    Contracting authority
    Mairie de Pauillac
    Accepted Languages
    French
    Tender type
    Services
    Contract Value
    Published date
    Jul 23, 2026

    TENDER DESCRIPTION

    This tender seeks a project manager for the comprehensive energy renovation, building restructuring, and accessibility improvements for all users at the Pauillac cultural center. The scope includes ensuring structural, electrical, and fire safety, full accessibility for people with reduced mobility (PMR) both internally and externally, and strict compliance with environmental regulations, notably energy sobriety as per the "décret tertiaire". Key technical requirements involve adherence to specific accessibility standards for ramps, sanitary facilities, door widths, visual signaling on glass, reception desks, and stair features, with deliverables required in both paper and electronic formats, and all offers submitted in French or with a certified translation. The project will progress through defined phases including diagnostics, preliminary and detailed design, urban planning and ERP work authorizations, project studies, assistance with contractor tendering and contract award, works execution supervision, and reception operations, though specific phase durations are not yet detailed. Financial standing requirements mandate a declaration of global turnover and turnover relevant…

    TENDER BRIEF

    Question: What is the contract timeline?

    Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.

    The documents indicate that the overall provisional duration of the contract is estimated in months, with the starting point to be fixed in the Special Administrative Clauses (CCP). However, the specific number of months for this estimated duration is not explicitly stated.

    Key milestones and phases, along with their contractual execution times, are listed, though the exact duration for each is not provided:

    • Diagnostic (DIAG): Months
    • Avant-Projet Sommaire (APS): Months
    • Avant-Projet Définitif (APD): Months
    • Autorisations d'urbanisme et de travaux ERP: Months
    • Etudes de projet (PRO): Months
    • Assistance à la passation des contrats de travaux (ACT), which includes:
    • Dossier de Consultation des Entreprises (DCE): Weeks
    • Cahier des charges missions connexes et diagnostics: Weeks
    • Analyse des offres: Weeks
    • Visa des études d'exécution (VISA): Months
    • Direction de l'exécution des travaux (DET): According to the duration of the works
    • Assistance aux opérations de réception (AOR), including the deadline for submitting the DOE (Dossier des Ouvrages Exécutés): Months.

    The mission is considered completed upon the client's acceptance of the DOE. The project manager may need to intervene during the perfect completion guarantee period of the works contract holder.

    The contracting authority has the option to terminate the contract by notifying the holder at least three months before the end of its validity; otherwise, the contract may be renewed.

    Specific contract start and end dates or a definitive total duration (e.g., a precise number of months) are not explicitly stated in the provided documents.

    Sources

    • 13. AE.doc — “ma trise d uvre. Le ma tre d ouvrage envisage, conform ment au programme ci-annex , une op ration ayant pour objet la r alisation de l ouvrage : Description sommaire de l ration novation nerg tique, restructuration du b…

    The core scope of work for this tender involves the energetic renovation, restructuring, and accessibility improvements for people with reduced mobility (PMR) of the cultural center in Pauillac. This includes ensuring the safety of goods and people (structurally, electrically, and fire safety), internal and external accessibility for individuals with disabilities, and compliance with environmental regulations, including energy sobriety according to the "décret tertiaire".

    The Statement of Work (SOW) outlines a mission for the project manager (maître d'œuvre) with several distinct phases and deliverables:

    • DIAG: Diagnostics, including establishing specifications for mandatory diagnostics and complementary reports.
    • APS (Avant-Projet Sommaire): Preliminary design summary.
    • APD (Avant-Projet Définitif): Detailed preliminary design.
    • Dépôt autorisation urbanisme: Submission of urban planning authorizations.
    • PRO (Études de Projet): Project studies.
    • DCE (Dossier de Consultation des Entreprises): Preparation of tender documents for companies, which includes Avis d'Appel à la Concurrence (AAC), Règlement de Consultation (RC), Acte d'engagement (AE), Cahier des Clauses Administratives Particulières (CCAP), Cahier des Clauses Techniques Particulières (CCTP), Décomposition du Prix Global et Forfaitaire (D.P.G.F.) or Bordereau de prix unitaire (BPU), Détail quantitatif-estimatif (D.Q.E.), and Plans.
    • ACT (Assistance pour la passation des Contrats de Travaux): Assistance with contract award for works, specifically the Offer Analysis Report.
    • DET (Direction de l'Exécution des Travaux): Supervision of works execution.
    • AOR (Assistance aux Opérations de Réception): Assistance with acceptance operations, including constituting the Dossier des Ouvrages Exécutés (DOE) after control and reception of elements from the works contractor(s).
    • OPC (Ordonnancement, Pilotage, Coordination): Scheduling, steering, and coordination.

    Additional core deliverables and responsibilities include:

    • Establishing a provisional estimate of the anticipated cost of works and associated diagnostics.
    • Estimating the overall project completion time and establishing a general work schedule (preparation and execution).
    • Redacting the specifications necessary for consulting providers for related missions and mandatory regulatory diagnostics.
    • Assisting the contracting authority in researching and preparing grant applications.
    • Organizing a public meeting to present the project.
    • Establishing and submitting work authorizations for Public Access Buildings (ERP).

    All deliverables for each mission phase are to be submitted in one paper copy and on digital support.

    Sources

    • 1Programme 24062026 renov energetique restructuration & Acces PMR centre culturel Pauillac.pdf — “de maitrise d'œuvre du mandataire et ses co-traitants Établir une estimation provisoire du cout prévisionnel des travaux et diagnostics associés Estimer le délai global de réalisation des opérations Établir un planning g…
    • 24. CCP.pdf — “marché(s) travaux. Ce DOE sera ensuite transmis au maître d'ouvrage en version papier et sur support informatique. La maitrise d'œuvre dans sa proposition fera son affaire de tous les éléments dont elle aurait besoins po…
    • 33. AE.doc — “ma trise d uvre. Le ma tre d ouvrage envisage, conform ment au programme ci-annex , une op ration ayant pour objet la r alisation de l ouvrage : Description sommaire de l ration novation nerg tique, restructuration du b…
    • 42. RC.pdf — “attirée sur le fait qu'en cas de prestations effectuées par un prestataire tiers, la sous- traitance est déclarée obligatoirement et les dispositions de la loi n°75-1334 du 31 décembre 1975 consolidée au 1 avril 2019 son…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 18 FILES

    • Centre Culturel -Les Tourelles_Plan d'intérieur - R2.pdf
    • Centre Culturel -Les Tourelles_Plan d'intérieur - RDC.pdf
    • Centre Culturel -Les Tourelles_Plan Topographique 200.pdf

    and 11 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders