Marché de maîtrise d'œuvre pour la rénovation énergétique et écologique des établissements scolaires communaux
Notice number: 26-74277
KEY INFORMATION
- Submission deadline
- • Sep 21, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Commune de Charleville-Mézières
- Accepted Languages
- FRA
- Tender type
- Services
- Contract Value
- Published date
- Jul 26, 2026
TENDER DESCRIPTION
This project management contract encompasses the energy and ecological renovation of municipal school buildings, beginning with a firm tranche for the Hanot Mozart school complex and extending to optional tranches upon confirmation. The comprehensive scope of work involves detailed study phases (Esquisse, Avant-Projet Sommaire, Avant-Projet Détaillé, Etude de Projet) to define project conception, materials, energy performance, and cost estimates, alongside compiling necessary administrative authorizations. Key technical requirements include dynamic thermal simulation, online invoicing, a methodology for working in occupied sites, and a strong emphasis on using reused or renewable materials to limit the project's carbon footprint. The contract mandates a total duration of 48 months, with studies capped at 6 months, an estimated works phase of 12 months per building, and a 12-month perfect completion guarantee period. Bidders must demonstrate general annual turnover over the past three years as a financial standing requirement.
TENDER BRIEF
The total duration of the contract is 48 months, starting from its notification to the successful bidder.
The firm tranche, concerning the Hanot Mozart school complex, begins on the date the notification is acknowledged as received. Any optional tranches will commence upon the date of notification of their confirmation order.
For each tranche, the project management services conclude at the end of the perfect completion guarantee period, or later if any reservations noted during reception are not fully addressed by that time.
Key phases and their durations include:
- Studies phase: This phase has a maximum duration of 6 months, which includes the time required for the client to validate the project management elements.
- Works phase: The estimated duration for the works on each building is 12 consecutive months, or it may be spread over two school years.
- Perfect completion guarantee period: This period for all works under the project management contract is 12 months.
Sources
- 126S12 CCAP.pdf — “scolaires. Période de garantie de parfait achèvement Le délai de garantie de parfait achèvement de l'ensemble des travaux du contrat de maîtrise d'œuvre est de 12 mois. Article 7 - Durée du marché La durée du marché corr…”
- 226S12 G LC-CCTP MOE multilots.pdf — “mission comporte en outre la constitution de tous dossiers nécessaires au bon déroulement de l'opération et notamment les dossiers et les consultations relevant de la compétence de la maîtrise d'œuvre et nécessaires à to…”
The core scope of work for this tender involves a comprehensive mission spanning several study phases: Esquisse (ESQ), Avant-Projet Sommaire (APS), Avant-Projet Détaillé (APD), and Etude de Projet (PRO).
A high-level summary of the Statement of Work and core deliverables includes:
- Esquisse (ESQ): Analysis of the program and site, exploration and proposal of various solutions, preliminary energy assessment, presentation of technical principles, surface tables, evaluation of urban planning regulations and financial compatibility, and establishment of a provisional general calendar.
- Avant-Projet Sommaire (APS): Definition of the general composition in plan and volume, ensuring compatibility with existing structures and regulations, assessment of interior/exterior aspects, examination of network connections, justification of technical solutions (especially energy performance), specification of a realization calendar, and a provisional cost estimate for works.
- Avant-Projet Détaillé (APD): Determination of detailed surfaces, finalization of plans, sections, and elevations, specification of materials and their characteristics, establishment of a definitive cost estimate for works, and updating the overall project schedule.
- Etude de Projet (PRO): Defining the general conception of the work, detailing the forms of construction elements, material nature and characteristics, implementation conditions, and determining implantation.
The mission also entails compiling all necessary documentation for administrative authorizations, such as building permits, and ensuring compliance with applicable general administrative clauses for public works contracts and technical execution modalities for public clients. Across all phases, the work involves regular compilation of meeting reports with the client and continuous monitoring and updating of the general provisional project calendar. The client is responsible for defining the operation's program, including sustainable development objectives, and the provisional financial envelope.
Sources
- 126S12 G LC-CCTP MOE multilots.pdf — “de dévolution et de consultation des entrepreneurs Note justificative des éventuels écarts avec la phase antérieure (identification et classification des écarts selon CCAP) Approche en coût global et estimation du retour…”
- 226S12 CCAP.pdf — “des études d'exécution et de synthèse (VISA) Direction de l'exécution des travaux (DET) | Assistance apportée au maître de l'ouvrage lors des opérations de réception (AOR) | Eléments des missions complémentaires | Ordonn…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 16 FILES
- 0-Programme.pdf393 KBPDF
- 26S12 Programme.pdf393 KBPDF
- 3.1-AE DPGF - TF Mat Hanot.doc64 KBDOC
and 9 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.