Published

    Marché de maîtrise d'œuvre pour la rénovation énergétique et écologique des établissements scolaires communaux

    Notice number: 00518826-2026

    🇫🇷 FranceCommune de Charleville-MézièresServices

    KEY INFORMATION

    Submission deadline
    Sep 21, 2026
    Location
    🇫🇷 France
    Contracting authority
    Commune de Charleville-Mézières
    Accepted Languages
    French
    Tender type
    Services
    Contract Value
    Published date
    Jul 27, 2026

    TENDER DESCRIPTION

    This tender seeks a project management contract for the energy and ecological renovation of municipal school buildings, encompassing a comprehensive architectural and engineering mission from initial sketch studies (ESQ) through to assistance for awarding construction contracts (ACT). The scope includes detailed design, energy performance analysis, and the establishment of a provisional operational schedule, requiring expertise in energy and HVAC, with dynamic thermal simulation for comfort demonstration. The contract has a total duration of 48 months, featuring a maximum 6-month study phase and an estimated 12-month work phase per building, followed by a 12-month perfect completion guarantee period. Offers must be submitted electronically in French, with online invoicing, and bidders are required to provide general annual turnover over three years for financial capacity verification.

    TENDER BRIEF

    The contract has a total duration of 48 months, starting from its notification to the holder.

    Key phases and their durations are:

    • Firm tranche: Begins on the date of acknowledgment of receipt of the notification.
    • Optional tranches: Commence from the date of notification of the firming order for the duration specified in that document.
    • Study phase: Has a maximum duration of 6 months, which includes the client's validation periods for the project management mission elements.
    • Work phase: The estimated duration of works per building is 12 consecutive months, or it can be staggered over two school years.
    • Perfect completion guarantee period: This period for all works of the project management contract is 12 months. The project management services for each tranche conclude upon the expiration of this guarantee period, or later if any reservations noted during reception are not lifted by the end of this period.

    Sources

    • 126S12 CCAP.pdf — “de parfait achèvement Le délai de garantie de parfait achèvement de l'ensemble des travaux du contrat de maîtrise d'œuvre est de 12 mois. Article 7 - Durée du marché La durée du marché correspond au délai d'exécution de…
    • 226S12 G LC-CCTP MOE multilots.pdf — “n°26S12 Page 5 sur 21 Suivi d’exécution Assistance pour la passation des contrats de travaux (ACT) Visa des études d’exécution et de synthèse (VISA) Direction de l’exécution des travaux (DET) Assistance apportée au maîtr…

    The core scope of work for this tender involves a comprehensive architectural and engineering mission, broken down into several distinct study phases and associated management processes.

    Key deliverables and phases include:

    • Esquisse (ESQ) - Sketch Studies: This initial phase involves understanding and analyzing the program brief and documents, visiting the site, analyzing administrative, regulatory, technical, and financial data, exploring and proposing various solutions, verifying compatibility with the budget, and assessing the feasibility of the operation. Deliverables include a summary presentation note, graphical formalization of the proposed solution (mass plan, level plans, volumetric expression), an estimated energy balance, a note on technical principles, and surface tables. This phase also includes an administrative note on urban planning regulations, an economic note on budget compatibility, and a general provisional schedule.
    • Avant-Projet Sommaire (APS) - Preliminary Draft Studies: This phase aims to refine the general composition in plan and volume, ensure compatibility of interventions with existing structures, and detail various aspects. Deliverables include graphical formalization (site integration plan, plans, sections, elevations at 1/200 scale), a description of technical principles (construction methods, materials, finishes, fluid management, energy solutions), detailed surface tables, an estimated energy balance, a note on energy performance, and an initial assessment of passive summer comfort. Administratively, it includes a note on applicable urban planning regulations. Economically, it provides a provisional cost estimate for works and a note on estimated energy renovation savings. Management deliverables include meeting minutes and updates to the general provisional schedule.
    • Avant-Projet Définitif (APD) - Detailed Preliminary Draft Studies: Building on the APS, this phase determines detailed surfaces, finalizes dimensions and appearance in plans, sections, and facades, defines constructive, foundation, and structural principles, specifies materials, and justifies technical solutions, particularly regarding technical installations, connections, and achievable energy performance.
    • Etude de Projet (PRO) - Project Studies: These studies define the general conception of the work, specifying forms of construction elements, materials, their characteristics, and implementation conditions through detailed plans, sections, and elevations. They also determine implantation and other elements.
    • Assistance pour la Passation des Contrats de Travaux (ACT) - Assistance for Awarding Construction Contracts: This phase provides support to the project owner for the award of construction contracts.

    The mission also includes the establishment of a general provisional operational schedule, prepared in collaboration with the project owner, covering study and validation timelines, administrative deadlines for urban planning permits, public works contract awards, and provisional schedules for works execution and project reception. The estimated duration for the study phase is a maximum of 6 months, including validation times by the project owner, and the estimated duration for the construction works per building is 12 consecutive months or staggered over two school years. A perfect completion guarantee period of 12 months is also specified for the entire work contract.

    Sources

    • 126S12 G LC-CCTP MOE multilots.pdf — “de concertation sont organisées avec le maître d'ouvrage. 3.1.2 Documents à remettre au maître d’ouvrage 3.1.2.1 Processus projet Note de présentation sommaire exposant l'approche générale du projet, la justification du…
    • 226S12 CCAP.pdf — “existants, des héberges, des abords, des plantations et des réseaux divers d'alimentation et de rejet, etc.) Les servitudes publiques et privées (de sol, de sous-sol, aériennes ou radioélectriques, etc.) Les résultats et…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 16 FILES

    • 26S12 CCAP.pdf
    • 3.6-AE DPGF - TO GS J. Curie.doc
    • 3.2-AE DPGF - TF GS Mozart.doc

    and 9 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders