Mission d’élaboration d’un schéma directeur énergie eau pour l’ensemble du patrimoine bâti de Sorbonne Université
Notice number: 00516461-2026
KEY INFORMATION
- Submission deadline
- • Oct 9, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Sorbonne Université
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Jul 27, 2026
TENDER DESCRIPTION
This tender seeks a qualified contractor to develop and implement a comprehensive Energy-Water Master Plan (SDEE) for the entire built heritage of Sorbonne University, requiring a strong demonstration of environmental commitment and eco-responsible practices. The project is structured with a firm tranche encompassing five phases, including scoping, initial diagnosis, scenario elaboration, SDEE drafting, and implementation support, totaling 24 months, followed by an optional 24-month tranche for implementation monitoring, potentially extending the contract to 48 months from an indicative December 2026 start. Key technical requirements mandate the use of recognized software and methodologies for energy and environmental modeling, integrated analysis tools, and specific certifications such as OPQIBI or RGE "Études" for energy audit reports. Submissions must adhere to specified electronic formats and language requirements (French), with the technical memorandum limited to 20 A4 pages. Furthermore, candidates must demonstrate sufficient global and field-specific turnover over the last three financial years, along with adequate professional and financial guarantees for contract…
TENDER BRIEF
The contract timeline is structured into a firm tranche and an optional tranche. The provisional start date for the execution of services is estimated to be December 2026, though this date is indicative and not contractually binding.
The key milestones and phases are as follows:
- Firm Tranche (Phases 1 to 5): The total duration for this tranche is 24 months.
- Phase 1-TF: Cadrage de la prestation (Framing of the service): 1 month.
- Phase 2 - TF: Diagnostic initial (Initial diagnosis): 5 to 6 months.
- Phase 3-TF: Elaboration des scenarios et du plan d'action (Elaboration of scenarios and action plan): 3 months.
- Phase 4- TF: Schéma directeur énergie eau (SDEE): rédaction du document (Energy and water master plan: document drafting): 2 months.
- Phase 5-TF: Accompagnement à la mise en œuvre du SDEE (Support for the implementation of the SDEE): 12 months.
- Optional Tranche (Phase 6): This tranche has a provisional duration of 24 months.
- Phase 6T01: Suivi de la mise en œuvre du SDEE (Monitoring the implementation of the SDEE).
The decision to firm up (affermir) the optional tranche must be made 6 months before the end of the firm tranche.
The total potential duration of the contract, if the optional tranche is affirmed, would be 48 months (24 months for the firm tranche + 24 months for the optional tranche). An explicit contract end date is not stated, but the durations of the tranches and phases are provided.
Sources
- 101. RC - SU_2026_AMO_SDEE_NB_AG.pdf — “de la consultation 2.1- Étendue de la consultation La présente consultation et le marché sont soumis aux dispositions du Code la commande publique. La consultation est passée selon la procédure d'appel d'offres ouvert en…”
The core scope of work for this tender involves the development and implementation of an Energy-Water Master Plan (Schéma directeur énergie eau - SDEE). The overall mission requires the successful candidate to demonstrate their environmental commitment and policy, including formalized documents and alignment with recognized standards.
The project is structured into the following key phases:
- Phase 1-TF: Scoping of the service, with a provisional duration of 1 month.
- Phase 2 - TF: Initial diagnosis, with a provisional duration of 5 to 6 months.
- Phase 3-TF: Elaboration of scenarios and an action plan, with a provisional duration of 3 months.
- Phase 4-TF: Drafting of the Energy-Water Master Plan (SDEE) document, with a provisional duration of 2 months.
- Phase 5-TF: Support for the implementation of the SDEE. The firm tranche, encompassing Phases 1 to 5, has a total duration of 24 months.
- Phase 6T01 (Optional Tranche): Monitoring the implementation of the SDEE, with a provisional duration of 24 months.
Core deliverables are associated with each key stage of the mission. The candidate is expected to present a detailed methodology to achieve the mission's objectives, ensuring consistency of services, meetings, and deliverables, while also demonstrating an understanding of the project's needs, challenges, and constraints. The integration of eco-responsible practices and training for the project team on sustainable development issues are also required.
Sources
- 101. RC - SU_2026_AMO_SDEE_NB_AG.pdf — “la mission, y compris la cohérence des prestations: réunions, livrables Réalisations concrètes de projets similaires, dans un contexte équivalent à celui de la mission, avec indication d'objectifs et/ou résultats quantif…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 1 FILE
- 01. RC - SU_2026_AMO_SDEE_NB_AG.pdf834 KBPDF
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.