Published
Missions de maitrise d'oeuvre (moe) pour le projet d'alimentation electrique des navires « porte conteneurs » a quai - bassins ouest - fos 2xl nord et sud
Notice number: 26-73821
KEY INFORMATION
- Submission deadline
- • Sep 30, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Grand port maritime de marseille
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Jul 23, 2026
TENDER DESCRIPTION
This tender seeks Project Management Missions (PM) for the Preliminary Design (Avant-Projet Sommaire - APS) of an electrical power supply system for container ships at the FOS 2XL SUD and 2XL NORD (+ Graveleau) terminals within the Western Basins of the Grand Port Maritime de Marseille (GPMM). The scope encompasses detailed energy design, including power balance calculations, HTA diagrams, functional analysis of conversion systems, a preliminary cable schedule, and technical-economic benchmarks, alongside geotechnical studies (G1 level), network planning, building implantation, and comprehensive project cost estimation and planning. Key technical requirements include adherence to numerous French standards (NF E, NF C series), regulatory texts, use of calculation software with file submission, and deliverables in DWG (AutoCAD 2018 compatible), .doc, and .xls formats, all in French. Proponents must conduct a mandatory site visit and affirm no Russian involvement, as per EU regulations. Neither specific financial standing requirements nor a contract timeline has been specified.
TENDER BRIEF
null
The core scope of work for this tender involves the execution of a Preliminary Design (Avant-Projet Sommaire - APS) mission for a project aimed at establishing electrical power supply to container ships at the quays of the FOS 2XL SUD and 2XL NORD (+ Graveleau) terminals. The study area covers the container terminals of Fos (Fos Graveleau, Fos 2XL Sud, Fos 2XL Nord, Fos 3XL) within the Western Basins of the Grand Port Maritime de Marseille (GPMM) in FOS.
The high-level summary of the Statement of Work and core deliverables includes:
- Preliminary Work: This involves a site visit to the study/work zone, creation of a photographic dossier, development of a simplified diagram, and conducting various surveys (dimensional, materials, etc.).
- Preliminary Design Studies (APS): These studies encompass several key areas:
- Energy Design: Detailed power balance calculations (including losses), an assumptions and synthesis note for the power balance, HTA synoptic and single-line diagrams, functional analysis of the conversion system requirements, a modeling assumptions note focused on optimizing conversion cascades, a preliminary cable schedule, and a technical and economic benchmark.
- Buildings and Soils: This includes preparing geotechnical reconnaissance specifications, conducting G1 level geotechnical studies per zone, providing plans of existing and projected concession networks, an electrical network cross-section plan, a building implantation dossier, and a typical structure dimensioning plan.
- Costs and Planning: This involves an APS financial estimation, developing a project plan that integrates all design phases up to commissioning, and a planning risk analysis note.
- Deliverables per Solution: Each proposed solution will be presented in an independent file detailing the provisional cost of works, the work execution schedule, and any proposed adaptations to the program.
- Complementary Studies: The mission also requires proposing additional structural, geotechnical, and/or physico-chemical reconnaissance, inspections, or auscultations deemed necessary for project development.
The perimeter of the APS specifically integrates Delivery Points B and C (PDL B and C), the electrical distribution systems from these PDLs to the quaysides, voltage and/or frequency transformers, shore connection boxes (borne or pit), and Cable Management Systems (CMS).
Sources
- 1P2602427_Mission APS MOE - CCTP.pdf — “F CCTP-Lot 2 Marseille Fost CAHIER DES CLAUSES TECHNIQUES PARTICULIERES MARCHE PUBLIC DE MAITRISE D'OEUVRE MISSIONS DE MAITRISE D'OEUVRE (MOE) POUR LE PROJET D'ALIMENTATION ELECTRIQUE DES NA- VIRES << PORTE CONTENEURS A…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 10 FILES
- MPI1854221_AAPC.pdf12 KBPDF
- P2602427_Mission APS MOE - CCTP_CENAQ_FOS_Programme_Technique_Détaillé.pdf4.2 MBPDF
- Russie_attestation_titulaire.pdf120 KBPDF
and 3 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.