Published
Missions de maitrise d'oeuvre pour les ouvrages d'infrastructures
Notice number: 26-78088
KEY INFORMATION
- Submission deadline
- • Sep 28, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Mairie charenton le pont
- Accepted Languages
- FRA
- Tender type
- Services
- Contract Value
- Published date
- Aug 6, 2026
TENDER DESCRIPTION
This tender seeks a contractor for comprehensive Project Management Missions for Infrastructure Works, specifically for public space developments in Charenton-le-Pont (94220). The scope encompasses detailed studies, including preliminary, diagnostic, and project phases, alongside works supervision such as assistance for contract award, execution visa, direction of works, assistance for acceptance, and overall project coordination. Furthermore, the role includes concessionaire network management and provision of ad-hoc intellectual services, with a contractual duration of 24 months, renewable once for an additional 24 months, totaling a maximum of 48 months. Bidders must submit offers electronically in French, utilizing specified forms (Dc1, Dc2, or Dume) and electronic signatures, adhering to strict compatibility requirements for deliverables with standard office software (Word, Excel, PowerPoint), AutoCAD (DWG), and archiving formats (vector/PDF/A), with potential requirements for GIS/QGIS or BIM. Financial standing requires a declaration of global annual turnover and contract-related turnover for the last three fiscal years.
TENDER BRIEF
The contract timeline is as follows:
The contract starts from the date of notification of the contract. The initial period of the framework agreement is 24 months. There is one express renewal period, also for 24 months. This means the maximum duration of the contract, including all periods, is 48 months. The contracting authority must make a decision regarding the renewal at least 5 months before the end of the current validity period of the framework agreement. If no decision is made within this timeframe, the renewal is considered refused.
Specific execution or delivery times for services are determined by each purchase order, in accordance with the terms of the framework agreement. The deadlines for deliverables are set as follows: the first deliverable's deadline begins on the date of the purchase order; subsequent deliverables' deadlines begin on the date the project manager is notified of the decision to accept the previous deliverable; and the deadline for the "Dossier des ouvrages exécutés (DOE)" is the date of acceptance of the works. The dates for the commencement of execution are only indicative.
Sources
- 1CCAP.pdf — “droit privé. 5 - Durée et délais d'exécution 5.1 Durée du contrat L'accord-cadre est conclu pour une période initiale de 24 mois. L'accord-cadre est conclu à compter de la date de notification du contrat. Consultation n:…”
- 2MPI1858760_AAPC.pdf — “(24 mois) : mini : 15 000 euros/HT maxi : 400 000 euros/HT Les dates de conditions d'ouverture des offres et de commencement d'exécution ne sont qu'indicatives. Marché périodique : Non Fonds Le marché s'inscrit dans un p…”
The core scope of work for this tender primarily involves "MISSIONS DE MAITRISE D'ŒUVRE POUR LES OUVRAGES D'INFRASTRUCTURES" (Project Management for Infrastructure Works) within the framework of public space developments in Charenton-le-Pont (94220).
The Statement of Work summary includes the following key missions and deliverables:
- Studies: This encompasses the conception phase.
- Preliminary studies (PRE): Developing various road layout sketches, providing a technical explanatory note, and a summary financial estimate.
- Diagnostic studies (DIAG): For reuse or rehabilitation projects, assessing the current state of the infrastructure and the feasibility of the operation through an inventory and technical analysis of structural resistance.
- Preliminary Project studies (AVP): Preparing documents and compiling files, including adherence to regulations concerning network damage prevention.
- Project studies (PRO): Developing precise and contractually effective documents and drawings, ensuring consistency between written and graphic elements, incorporating client feedback, and providing design specifications, quantity surveys, cost estimates, and a provisional project schedule.
- Works Supervision: This applies as needed.
- Assistance for the award of works contracts (ACT): Supporting the process of awarding construction contracts, including document preparation and file compilation.
- Visa on execution and synthesis studies (EXE/VISA): Reviewing and validating execution and synthesis studies.
- Direction of works execution (DET): Managing and overseeing the execution of the works.
- Assistance for acceptance operations and perfect completion guarantee (AOR): Aiding in the acceptance of works and the guarantee of perfect completion.
- Order, Piloting, and Coordination (OPC): Managing the overall order, piloting, and coordination of the project.
Additionally, the tender includes specific services related to networks and intellectual prestations:
- Concessionaire Network Management: Collecting plans and data from network concessionaires, establishing synthesis plans, and digitalizing information. This also includes the reporting of networks on plans.
- Ad-hoc Intellectual Services: Providing specialized intellectual services on demand, which can involve personnel such as technical directors, project managers, engineers, landscapers, technicians, designers, and administrative staff. These services also cover attendance at public meetings.
Sources
- 1Reglementdelaconsultation.pdf — “contact.............................................................9 9.2 - Procédures de recours ........................................................................................................9 1- Objet et éten…”
- 2MPI1858760_AAPC.pdf — “l’espace public : - En matière d’études : conception et le cas échéant : - En matière de suivi des travaux. Le maître d’œuvre aura en charge les éléments de mission de base: PRE (Etudes préliminaires), DIAG (Diagnostic),…”
- 3CCTP MO 2026.pdf — “public 2026 4 Les études préliminaires vont conduire à réaliser et proposer différentes esquisses d’aménagement de voirie. Cela nécessitera au moins une réunion avec les services techniques afin d’analyser les besoins et…”
- 4BPU 2026.xlsx — “réglementation anti-endommagements des réseaux tels que définis au CCTP.", 2-1,Pour une opération dont le montant des travaux est inférieur à 80 000 € HT, 2-2,Pour une opération dont le montant des travaux est compris en…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 11 FILES
- DC2.doc573 KBDOC
- MPI1858760_AAPC.pdf20 KBPDF
- Acted_engagement.docx62 KBDOCX
and 4 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.