    Mobility Hub Jüchen Los 4 Tragwerksplanung

    Notice number: ocds-mnwr74-fbc87008-9288-4239-98d1-f3da0385b3b3

    🇩🇪 GermanyZweckverband LANDFOLGE GarzweilerServices

    KEY INFORMATION

    Submission deadline
    • Nov 19, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Zweckverband LANDFOLGE Garzweiler
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Oct 11, 2026

    TENDER DESCRIPTION

    This tender, issued by Zweckverband LANDFOLGE Garzweiler, seeks structural engineering services (Tragwerksplanung) for the new, multifunctional Mobility Hub in Jüchen, envisioned as a showcase for sustainable and resource-efficient construction. The comprehensive scope covers HOAI Leistungsphasen 1-3 as directly commissioned services, with LPH 4-9 being optionally callable, and requires full structural design, mandatory BIM integration, and adherence to a strict sustainability target catalog and preliminary cost ceilings within a total project cap of EUR 7,000,000 gross (KG 300-500). Technical requirements necessitate proven expertise in load-bearing timber and timber module constructions, supported by specific references and submission of concepts on professional suitability for timber/module construction, sustainability, and constructive wood protection. Bidders must possess a minimum annual turnover of EUR 400,000 gross and maintain professional liability insurance of EUR 5,000,000 gross for personal injury and EUR 2,000,000 gross for property/financial losses, with all offers, prepared in German, due electronically by November 19, 2026, for a contract commencing December 10,…

    TENDER BRIEF

    The contract timeline is as follows:

    Contract start date: The expected award and contract conclusion is 10.12.2026. The contract comes into force with the signing by both parties, and the performance of services is to begin immediately after contract conclusion.

    Contract end date: The project completion is set for 27.04.2029.

    Total duration: From December 10, 2026, to April 27, 2029, which is approximately 2 years, 4 months, and 17 days.

    Key milestones and phases:

    • Expected award and contract conclusion: 10.12.2026
    • Commissioning: 10.12.2026
    • Completion of Leistungsphase (LPH) 2: 29.01.2027
    • Completion of LPH 3 and 4: 25.06.2027
    • Start of construction: 22.11.2027
    • Completion of LPH 5, 6 and 7: 28.07.2028 (this completion must be ensured)
    • Completion: 27.04.2029

    The contract also outlines a staged commissioning approach: Stage 1 covers LPH 1-3 (directly commissioned), Stage 2 covers LPH 4 (optional), and Stage 3 covers LPH 5-9 (optional). Stage 1 is commissioned upon contract award, and there is no entitlement to the commissioning of further stages, as these are to be called off individually as needed and are dependent on the granting of subsidies for construction.

    Sources

    • 1Mustervertrag.pdf — “seines Honorars ableiten. Bei Abruf einer weiteren Stufe gelten die Bestimmungen dieses Vertrages. § 3 Vertragslaufzeit und Termine (1) Der Vertrag hat eine Laufzeit bis zum xx.XX.XXXX. (2) Die Leistungen der Leistungsph…”
    • 2Anlage 9 Vergabeunterlagen.pdf — “im Zweifel vom Bieter nachzuweisen ist, auf dem Vergabemarktplatz. Bis zum Ablauf der Angebotsfrist können Angebote über den Vergabemarktplatz zurückgezogen werden. Bieter und deren Bevollmächtigte sind zur Angebotsöffnu…”

    The core scope of work for this tender involves structural engineering services for the new construction of the Mobility Hub at the edge of the open-pit mine in Jüchen. The project is designed to be a showcase for sustainable and resource-efficient construction.

    The Statement of Work (SOW) is structured into several stages and service phases (Leistungsphasen or LPH) according to HOAI (Fee Schedule for Architects and Engineers):

    • Stage 1 (Directly Commissioned): This stage covers LPH 1-3, focusing on the elaboration of fundamentals and the conceptual planning.
    • Stage 2 (Optional): This stage involves LPH 4.
    • Stage 3 (Optional): This stage encompasses LPH 5-9.

    Core deliverables and requirements include:

    • Structural Engineering Design: Providing all necessary engineering services for the structural design.
    • BIM Implementation: Mandatory use of Building Information Modeling (BIM) for planning, requiring the contractor to integrate their planning into a common BIM model and "feed" it with structural information without additional honorarium.
    • Cost Management: Adherence to a total cost cap of EUR 7,000,000 gross (Cost Groups 300-500) and preliminary cost ceilings (e.g., EUR 3,600,000 gross for Cost Group 300, EUR 1,900,000 gross for Cost Group 400). The contractor is obligated to perform planning-accompanying cost tracking, sub-dividing costs by quantity and associated expenses, and proposing alternatives if cost limits are exceeded.
    • Sustainability Focus: Planning must align with principles of sustainable, resource-efficient, and economical architectural solutions, applying the "Zielwertkatalog" (target value catalog).
    • Specific Special Services (Besondere Leistungen): These are integral to the planning and include tasks such as:
    • Developing comparative calculations for multiple solution possibilities (e.g., 3 variants) during LPH 2.
    • Performing preliminary verifiable calculations for foundations during LPH 2.
    • Providing earthquake security proofs during LPH 3.
    • Conducting proofs for structural fire protection (including hot design if necessary) during LPH 4.
    • Performing static proofs for non-structural constructions (e.g., facades) during LPH 4.
    • Developing constructions and proofs of connections during LPH 5.
    • Project Management: Immediate commencement of services after contract signing, adherence to agreed timelines, and prompt communication with short reaction times (e.g., responses to emails/calls within three working days, appointments within three working days, emergency appointments within 24 hours).

    Sources

    • 1Mustervertrag.pdf — “zwischen dem Vertrag - Neubau Mobility Hub am Tagebaurand in Jüchen - Tragwerksplanung Muster Werkvertrag Neubau des Mobility Hubs am Tagebaurand in Jüchen Tragwerksplanung Zweckverband LANDFOLGE Garzweiler Kuckumer Dorf…”
    • 2Anlage 9 Vergabeunterlagen.pdf — “sind. Sie sollen als Vorzeigeprojekte für nachhaltiges und ressourcenschonendes Bauen dienen und Impulse für die weitere städtebauliche Entwicklung an den Standorten geben. Einer dieser Impulsbauten ist der Mobility Hub…”
    • 3Anlage 1 Angebotsformular.pdf — “5 - Ausführungsplanung | 40% | LPH 6- Vorbereiten der Vergabe | 2% | LANDFOLGE GARZWEILER ZWECKVERBAND Anlage 1 | Vergabe Tragwerksplanung Mobility Hub Jüchen-Zweckverband Landfolge Garzweller Seite 10 Summe Grundleistun…”

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 15 FILES

    • Erläuterungsbericht.pdf
    • Anlage 2 Nachunternehmererklärung.pdf
    • Aufforderung_zur_Angebotsabgabe.pdf

    and 8 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders