Modernizacja stacji elektroenergetycznej 110/15 kV Łososina tryb zaprojektuj i wybuduj
Notice number: 00715286-2026
KEY INFORMATION
- Submission deadline
- • Oct 27, 2026
- Location
- 🇵🇱 Poland
- Contracting authority
- TAURON Dystrybucja S. A. Oddział w Krakowie
- Accepted Languages
- Polish
- Tender type
- Works
- Contract Value
- Published date
- Oct 16, 2026
TENDER DESCRIPTION
This tender outlines the comprehensive design and build modernization of the 110/15 kV Łososina electrical substation, encompassing all design, construction, installation, and assembly works, alongside the provision of temporary operational systems to ensure continuous station operation. The extensive scope requires the full realization of the construction facility, including new HV/MV transformer stations, a 110kV HV overhead switchgear, external and internal cabling, security systems, utility infrastructure, and associated demolition works, with the contractor responsible for all documentation and permitting. Adherence to a wide array of technical standards, including PN-EN and PN-S series, OHS and fire safety regulations, and the use of approved construction products is mandatory, with 110 kV circuit breakers supplied by the investor. The project has a strict timeline of up to 28 months from contract conclusion, requiring a detailed financial and material schedule within 30 days and mandating a minimum 60-month warranty period from the final acceptance protocol.
TENDER BRIEF
The contract timeline is as follows:
- Total Duration: Up to 28 months from the date of contract conclusion.
- End Date: The date of signing the final acceptance protocol of the Subject of the Agreement, without reservations.
- Key Milestones/Phases:
- Within 30 days from the date of contract conclusion, the Contractor must submit a detailed financial and material schedule (Harmonogram) for approval.
- The Contracting Authority will approve or comment on the schedule within 5 working days of its submission.
- The schedule must allow for work stoppages initiated by the Contracting Authority, not exceeding 4 instances, each no longer than one 8-hour shift, which will not alter the contract completion date.
- Partial invoices will be issued until 90% of the Contractor's remuneration value is achieved.
- For the annual work and shutdown plan, especially for 110 kV equipment shutdowns longer than 3 days, demand must be reported no later than August 1st of the preceding year.
Sources
- 1Załącznik nr 12 do SWZ - Projekt umowy PZP - Modernizacja stacji Łososina.pdf — “po ustaleniu z Wykonawcą formy zawarcia Umowy. Nr postępowania: PZP/TD-OKR/07695/2026 str. 1 jeśli pewne elementy robót budowlanych, usług i dostaw nie zostały wyraźnie wyszczególnione w tych dokumentach lub wskazane w o…”
- 2Odpowiedź nr 1.pdf — “z pkt 2.4.7.1.3 i 4 PFU w oparciu o udostępnione łącza opisane w odpowiedzi na pytanie nr 77. Pytanie nr 79: Działając na podstawie Ustawy z dnia 11 września 2019 r. Prawo zamówień publicznych (dalej „PZP") zwracamy się…”
- 3SWZ - Łososina.pdf — “o dopuszczalności składania Ofert częściowych. 2.2.1 2.2.2 Zamawiający nie dopuszcza składania Ofert częściowych. Zamawiający nie zastrzega obowiązku osobistego wykonania przez Wykonawcę kluczowych części zamówienia. 2.3…”
The core scope of work for this tender is the "Modernization of the 110/15 kV Łososina power substation" under a "design and build" model.
The Statement of Work summary includes:
- Design and Execution: The project requires the contractor to design and execute all necessary construction works, including the realization of the construction object.
- Comprehensive Project Activities: This encompasses all design, temporary, and organizational works, as well as the supply of materials, services, and construction, installation, and assembly works. It also covers all activities required for defect removal under warranty and guarantee, and any other tasks necessary for the proper and safe completion and operation of the project, even if not explicitly detailed but implicitly required.
- Documentation and Permits: The contractor is responsible for providing complete design documentation (building and executive designs) and obtaining all necessary approvals, decisions, agreements, and permits on behalf of the client for the project's implementation.
- Key Construction and Installation Works:
- Building essential temporary operational systems for the Łososina SE to ensure continuous operation during new facility construction.
- Construction of the station building.
- Building two high-voltage/medium-voltage (HV/MV) transformer stations with transformers and cable bridges.
- Constructing two high line gates and the station fence.
- Building a 110kV HV overhead switchgear.
- Installation of external cable ducts, earthing, and lightning protection.
- Erection of external lighting for the station area.
- Construction and reconstruction of 15kV MV, 0.4kV LV cable lines, and control cables.
- Development of the technical security system (SZT), cable ducts, telecommunication, and fiber optic cables.
- Construction of water supply, sanitary sewage, external rainwater drainage, and a sealed rainwater retention tank.
- Creation of internal transport roads and communication routes.
- Installation of internal electrical, telecommunication, water and sewage, heating, ventilation, and air conditioning systems.
- Ground leveling, decommissioning of existing ground infrastructure, and construction of secondary circuit systems, energy measurement, and general station systems.
- Construction of the SSIN system.
- Demolition works.
- Operational Continuity: All works must guarantee the uninterrupted operation of the station. The project documentation must detail the sequence and method of necessary network shutdowns, proposed transitional arrangements, and OHS requirements to maintain continuous station operation.
- Timeline: The project is to be completed within 28 months from the contract date.
- Warranty: A minimum warranty and guarantee period of 60 months from the date of the final acceptance protocol without reservations is required.
Sources
- 1SWZ - Łososina.pdf — “zakresem Przedmiotowi Zamówienia: L.p. | Nazwa i adres Zamawiającego | Termin realizacji zamówienia Rozpoczęcie (rrrr-mm-dd) | Zakończenie (rrrr-mm-dd) | Charakter obiektu " | SZT/SSP tak/nie | SSWIN tak/nie | SDW tak/ni…”
- 2Załącznik nr 12 do SWZ - Projekt umowy PZP - Modernizacja stacji Łososina.pdf — “członka konsorcjum i wskazać lidera] W rezultacie wyboru Wykonawcy w przeprowadzonym postępowaniu nr PZP/TD-OKR/07695/2026 o udzielenie zamówienia publicznego na wykonanie zadania pn.: „Modernizacja stacji elektroenerget…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 15 FILES
- Dokumentacja Techniczna przyłącza wodociągowego .pdf7.2 MBPDF
- PFU.pdf24.1 MBPDF
- 2026-OJS201-00715286-pl-ts - zmiana terminu składania ofert.pdf172 KBPDF
and 8 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.