Published

    Multi Party Framework Agreement (2026-2030) for the Design and Execution of works in connection with the installation of Playgrounds for Dublin City Council

    Notice number: 00579923-2026

    🇮🇪 IrelandDublin City CouncilWorks

    KEY INFORMATION

    Submission deadline
    Sep 23, 2026
    Location
    🇮🇪 Ireland
    Contracting authority
    Dublin City Council
    Accepted Languages
    English
    Tender type
    Works
    Contract Value
    Published date
    Aug 21, 2026

    TENDER DESCRIPTION

    This tender seeks to establish a Multi-Party Framework Agreement (2026-2030) for Dublin City Council, encompassing the comprehensive design and execution of works for playground installations, including site preparation, civil works, soft landscaping, safety surfacing, and the supply and installation of playground, gym, teen zone, MUGA, skate, BMX, and pumptrack equipment. Bidders must meet technical requirements for electronic submission, invoicing, ordering, and payment, alongside providing methodologies for health and safety dissemination and construction safety management. Financial standing mandates an average annual turnover of at least €500,000 over the past three financial years, specifically for playground design and installations, requiring submission of financial statements and a recent banker's letter. The contract award decision is slated for Q3 2026, with a one-year Defects Period following Substantial Completion.

    TENDER BRIEF

    The contract timeline includes the following milestones and definitions:

    • Decision on Contract Award: Q3 2026.
    • Contract Date: The date the Employer issued the Letter of Acceptance.
    • Starting Date: To be set by the Contractor, with at least 15 working days' notice to the Employer's Representative. This date should be no more than 20 working days after the Contract Date, unless specified otherwise in the Works Requirements.
    • Date for Substantial Completion: This is the last day of the period starting on the Contract Date or a specific date, unless the Contractor is to complete it in part 2 of the schedule.
    • Defects Period: The initial Defects Period is one year from the date of Substantial Completion of the Works.

    Sources

    • 130_PW-CF2_Contract_v2.8_25-11-2025.pdf — “they relate. (16) References to the Agreement and Schedule are to the attached agreement and completed schedule. (17) References to the Works Requirements, Works Proposals and the Pricing Document are to the Works Requir…
    • 213_Vol B Form of Tender and Schedule MPFA Playgrounds.docx — “| | | | | Note 1: Novated Specialists are those whose contract with the Employer is to be novated to the Contractor. Note 2: The Specialist Contract Sum shall be entered here, where known. Where the sum is not known the…

    The core scope of work and statement of work for this tender involves a Multi-Party Framework Agreement (2026-2030) for the Design and Execution of Works related to the Installation of Playgrounds for Dublin City Council.

    The summary of the Statement of Work and core deliverables includes:

    • Playground Design: This encompasses the design itself, provision of drawings for assessment and construction, potential revisions to design drawings based on a ‘Design Risk Assessment’ report, and an allowance for additional design development from client/stakeholder feedback post-tender submission.
    • Site Preparation: This involves the removal of existing topsoil and regrading of subsoil (either off-site or within the park), regrading of topsoil within the park for seeding or landscape areas, and regrading and contouring of subsoil and soil within the play area to enhance play value, improve access, and create sound or visual buffers.
    • Civil Works: All associated civil works are included, such as path sub-base and surface, hardcore sub-base for critical fall areas, drainage pipes, sumps, outfalls, and kerbing.
    • Drainage Installation: This is included if required.
    • Soft Landscape Elements: This covers mounding and grass sod installation, requiring detailed plans including planting plans, tree quantity, size, species, and planting schedules/specifications.
    • Safety Surface: The supply and installation of safety surfacing to specified depths and areas, as per design proposals and construction drawings.
    • Testing and Certification: This is required for the playground.
    • Meetings: The tenderer is required to attend a minimum of 5 meetings related to site preparation, with any additional meetings being inclusive in the quoted price.
    • Overall Scope: The project involves the supply and installation of playground equipment, landscaping works (including safety surfacing and ancillary works), and the provision of labour, plant, and materials.

    Sources

    • 12_ITT MPFA Playgrounds.docx — “the award process for which these Instructions is issued these documents | these Instructions and the invitation letter and other documents issued with it and any additional information issued by the Contracting Authorit…
    • 215_Vol C Pricing Document.docx — “required | Linear m | | | | | 1.2.5 | Soft Landscape elements, including mounding and grass sod installation. Detailed plan required, including planting plans, no, size and species of tree, planting schedules/specificati…
    • 314_Vol C Pricing Document.pdf — “and Area Services (CCLAS) Dublin City Council 1.2.4 | Drainage Installation if required | Linear m 1.2.5 | Soft Landscape elements, including mounding and grass sod installation. Detailed plan required, including plantin…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 43 FILES

    • 4_QW2_Part_1_MPFA Playgrounds.docx
    • 16_SAQ_Appendix_A_Applicants_Self-Declaration__Regulation_57.pdf
    • 40_Additional Information for eTenders Notice.pdf

    and 36 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders