    TENDER DESCRIPTION

    This tender seeks comprehensive supervision services for the construction of the Novo Pobrežje residential neighborhood, Maribor – Phase 1, encompassing six multi-apartment buildings, a shared garage, and associated utility infrastructure. The scope includes qualitative, technical, and financial oversight of all civil, craft, and installation (GOI) works, along with integrated BIM supervision throughout the design and construction phases for the development of PZI, PID, and FM BIM models, with the lead BIM supervisor acting as the client's BIM Manager. Proposers must demonstrate proficiency with specific technologies such as BIM 360, Navisworks (2024+), Solibri Office (24.12+), and Bexel Manager (25.0.2+), adhering to standards like ISO 19650 and a minimum LOD350 for 3D PZI BIM models. Financial standing requirements include an average annual turnover of at least EUR 200,000.00 over the last three business years (2023-2025) and a minimum SB6 credit rating. The contract initiates with activities immediately post-signing, with construction commencing provisionally in August/September 2026, culminating after occupancy permits (21-22 months post-start) and a combined 10-year warranty…

    TENDER BRIEF

    The contract timeline is outlined with several key phases and milestones. The anticipated start date for works is immediately after the contract signing, provisionally in August 2026 for Sklop 2 and September 2026 for Sklop 1. The contract remains valid until all obligations, including general and construction solidity warranty periods, are completed.

    Key milestones and their durations include:

    • Activities before construction: immediately after the contract becomes valid.
    • Construction of objects: immediately after the GOI contractor is introduced to work.
    • Occupancy permits for objects: 22 months after the start of construction (Sklop 2). For Sklop 1, it's 21 months from introduction to work for technical inspection, followed by 30 days for obtaining the occupancy permit.
    • Handover of objects: 60 days after obtaining the occupancy permit.
    • Final settlement according to the construction contract: 30 days after the completed handover.
    • General warranty period for objects: 5 years after the completed handover.
    • Warranty period for construction solidity: 5 years after the end of the general warranty period.

    Specific services for Sklop 2 also have defined timelines:

    • BEP creation: 15 days.
    • PZI BIM model review: 15 days.
    • PZI BIM model completion: 21 days.
    • PZI BIM model confirmation: 7 days.
    • 3D PID BIM model review: starts 21 months from introduction to work, lasting 15 days.
    • 3D PID BIM model completion: 7 days.
    • 3D PID BIM model confirmation: 7 days (total 30 days for review, completion, and confirmation).
    • Upgrade 3D PID BIM model to FM BIM model: starts after 3D PID BIM model confirmation, lasts 30 days, and concludes simultaneously with object handover.

    The timeline allows for a possible extension of the construction period by an additional two months, which would proportionally adjust the completion deadline and financial plan. The total duration is not stated as a single fixed period, but is defined by the completion of all these phases, including the combined 10-year warranty periods following the handover.

    Sources

    • 16. Vzorec pogodbe_Sklop 2.docx — “| % | | IV. Roki 8. člen Predviden pričetek del je takoj po podpisu pogodbe ob upoštevanju izpolnitve odložnega pogoja iz 23. člena pogodbe, to je predvidoma v avgustu 2026. Rok za izvedbo GOI del od uvedbe v delo do upo…
    • 26. Vzorec pogodbe_Sklop 1.docx — “izstavitvi na transakcijski račun izvajalca, ob pogoju, da je s strani izvajalca prejel zahtevano dokumentacijo iz 17. člena te pogodbe, na naslednji način : do 75% celotne pogodbene cene v mesečnih obrokih na osnovi izs…

    The core scope of work for this tender, titled "Nadzor nad GOI deli in izvedbo komunalne opreme ter BIM nadzor za gradnjo stanovanjske soseske Novo Pobrežje, Maribor - Faza 1," involves two main lots. The project concerns the construction of six multi-apartment buildings with a shared garage in Maribor, along with related traffic, external arrangements, auxiliary facilities, utility lines, and connections to infrastructure within the construction area. An integral building permit for this construction was obtained on April 15, 2026, and became legally binding on May 26, 2026.

    The tender is divided into:

    SKLOP 1: Supervision of construction and communal infrastructure for the Novo Pobrežje residential complex, Maribor - Phase 1.

    • Statement of Work Summary: This involves performing qualitative, technical, and financial supervision over the execution of all civil, craft, and installation (GOI) works. It also includes project management and coordination, technical consulting, and other engineering services related to the construction of the residential complex and its communal infrastructure.

    SKLOP 2: BIM supervision for the construction of the Novo Pobrežje residential complex, Maribor - Phase 1.

    • Statement of Work Summary: This entails BIM supervision during the design and construction phases to ensure quality in the development of PZI BIM (detailed design), PID BIM (as-built), and FM BIM (Facility Management) models for maintenance and operational management.
    • Core Deliverables/Activities:
    • Review of BIM Execution Plan documents.
    • Review of the PZI BIM model.
    • Review of the PID BIM model.
    • Linking documents and the PID BIM model into the FM BIM model.
    • Providing ongoing reports for the project.
    • The BIM supervisor is responsible for leading and coordinating with all project participants (client, designer, reviewer, construction supervision, construction contractor) and performing overall quality control of the BIM project. The lead BIM supervisor will function as the BIM Manager on behalf of the client.
    • Key BIM Execution Plan Timelines (up to PZI phase):
    • Preparation of the BIM execution plan: within 8 days of project commencement.
    • Review of submitted IDP 3D BIM models and report preparation: within 14 days of model submission.
    • Coordination of IDP 3D BIM model upgrade to PZI 3D BIM model: within 170 days after the final review of IDP 3D BIM models.
    • Review of intermediate PZI 3D BIM model submission and intermediate report preparation: within 10 days during the project.
    • Coordination of PZI 3D BIM model completion: within 14 days after the intermediate review of the PZI 3D BIM model submission.
    • Review of final PZI 3D BIM model submission and final report preparation: within 8 days after the last submission of the PZI 3D BIM model.

    Sources

    • 11. Navodila ponudnikom JN 22 2026.pdf — “Navodila ponudnikom NAVODILA PONUDNIKOM STANOVANJSKI SKLAD BHEPUBLIKE SLOVENUE JAVIH SKLAD 1. PODATKI O NAROČNIKU IN POSTOPKU Naročnik | Stanovanjski sklad Republike Slovenije, javni sklad Poljanska cesta 31 1000 Ljublja…
    • 21. Navodila ponudnikom JN 22 2026.docx — “NAVODILA PONUDNIKOM PODATKI O NAROČNIKU IN POSTOPKU Naročnik | Stanovanjski sklad Republike Slovenije, javni sklad Poljanska cesta 31 1000 Ljubljana Oznaka javnega naročila | JN 22/2026 Naziv javnega naročila | Nadzor na…
    • 36. Vzorec pogodbe_Sklop 2.docx — “776/29, 776/30, 776/31, 776/32, 776/33, 776/34, 776/35, 776/36, 776/38, 776/39, 776/40, 783/4, 783/5, 784/1, 784/2, 786/17, 786/18, 786/19, vse k.o. 681 Pobrežje, v skupni velikosti 43.671,00 m2, skupna velikost območja…
    • 4specifikacija naročila_BIM nadzor.docx — “BIM NADZOR Stanovanjska soseska Novo Pobrežje, Maribor – Faza 1 Specifikacija naročila INVESTITOR: Stanovanjski sklad Republike Slovenije, javni sklad Poljanska cesta 31 1000 Ljubljana marec 2026 UVOD Predmet tega javneg…
    • 5NPMB_ODE_XXX_XX-XX_BIM_XX_BEP-Nacrt za izvedbo BIM pristopa.pdf — “pobrežje Maribor SPLOŠNE INFORMACIJE O PROJEKTU Naročnik projekta: Stanovanjski sklad republike Slovenije Poljanska cesta 31, 1000 Ljubljana Ime projekta: Stanovanjska soseska Novo Pobrežje Maribor Lokacija projekta: Lok…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 272 FILES

    • 190501_NPMB - DGD čist. dec.25 - 1 obrazci.xlsm
    • 2. ESPD JN 22 2026.xml
    • TP.82 Tloris 1. nadstropja C1.pdf

    and 265 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders