Neubau 4-zgige Grundschule als Komplettleistung Karlsruher Straße / Mannheimer Straße 35, Funktionalausschreibung
Notice number: 00493376-2026
KEY INFORMATION
- Submission deadline
- • Sep 10, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- LESG Gesellschaft der Stadt Leipzig zur Erschließung, Entwicklung und Sanierung von Baugebieten mbH
- Accepted Languages
- German
- Tender type
- Works
- Contract Value
- Published date
- Jul 16, 2026
TENDER DESCRIPTION
This tender seeks a complete service for the new construction of an accessible 4-track primary school, including after-school care and an optional 2-field sports hall, at Karlsruher Straße / Mannheimer Straße 35 in Leipzig. The comprehensive scope encompasses all planning services (LPH 5-9) for the building, structural engineering, and electrical execution, alongside the full spectrum of construction works, from site preparation, earthworks, masonry, concrete, and roofing to interior finishes, windows, doors, and all associated ancillary services. Key technical requirements include extensive IT infrastructure such as Mobile-Device-Management solutions, centralized data networks with server cabinets, advanced audio-visual systems for classrooms (e.g., interactive displays, wireless transmission, projectors), specialized laboratory equipment, and adherence to specific lighting, HVAC, and safety standards. Proposers must submit their company's turnover for the last three completed business years relevant to construction and comparable services, while adhering to a project timeline from November 2, 2026, with completion (ready for acceptance) by January 31, 2029, and requiring an…
TENDER BRIEF
The contract timeline is as follows:
- Contract Start Date: November 2, 2026
- Contract End Date: January 31, 2029
- Total Duration: Approximately 2 years and 91 days.
- Key Milestones/Phases:
- Project Start: November 2, 2026
- Submission of Integrated Baseline Schedule: Within 30 calendar days after contract conclusion, the contractor must submit an integrated baseline schedule and agree on it with the client. This schedule needs to be updated at least monthly and as needed, incorporating plan execution plans (LPH 5-9) for each discipline, award/procurement dates for key trades, the construction schedule including the critical path, dates for sampling/sample areas, commissioning, functional and integration tests, necessary expert and authority approvals, partial acceptances, final acceptance, documentation submission, and handover.
- Completion (ready for acceptance): January 31, 2029
Sources
- 1VHB_214_Besondere_Vertragsbedingungen.pdf — “integrierten Basisterminplans; Projektbeginn: 02.11.2026 2 Vertragsstrafen (§ 11 VOB/B) 2.1 Der Auftragnehmer hat bei Überschreitung der unter 1. als Vertragsfrist vereinbarten Einzelfristen oder der Frist für die Vollen…”
- 2092.31_GSK_Funktionale_Leistungsbeschreibung_V0.pdf — “ist der Auftragnehmer zur Fortsetzung der vertraglich vereinbarten Leistungen verpflichtet, sofern ihm dies zumutbar ist und keine stichhaltigen Gründe im Sinne der VOB/B dem entgegenstehen. Kontroverse Punkte sind im Na…”
The core scope of work for this tender involves the "092_31 Neubau einer 4-zügigen Grundschule" (New construction of a 4-stream elementary school). The work must be executed as a fully functional and acceptable project in accordance with the FLB (Functional Leistungsbeschreibung - Functional Specification) and planning documents, supplemented by VOB/B and relevant ATV of VOB/C.
The Statement of Work (SOW) includes all ancillary services as a lump sum, which are:
- Measurement (Aufmaß)
- Execution/Workshop/Assembly Planning (Ausführungs-/Werk-/Montageplanung)
- Delivery/Assembly (Lieferung/Montage)
- Connection and Ancillary Works (Anschluss- und Nebenarbeiten)
- Interface Coordination (Schnittstellenkoordination)
- Inspections/Tests (Prüfungen)
- Commissioning (Inbetriebnahme)
- Instruction/Training (Einweisung)
- Documentation (Dokumentation)
Key deliverables and work areas explicitly stated are:
- Construction site facilities and security.
- Scaffolding works.
- Earthworks, including excavation, backfilling/re-backfilling, subgrade preparation, disposal, and potentially shoring/bracing.
- Water management works, including planning/operation, measurement/control, discharge permits, and dismantling.
- Masonry works, including all constructions, connections, openings/slots, and ancillary works.
- Concrete works, encompassing formwork/reinforcement, concreting/post-treatment, built-in parts, joint/recess works, and quality proofs.
- Steel construction works, covering manufacturing/assembly, corrosion protection, connections, assembly aids, and auditable workshop documents.
- Carpentry and timber construction works, including timber framework/substructures, wood protection, connections, and required proofs.
- Natural stone and precast concrete works, such as steps/landings/windowsills, cutting, anchorages, and connections.
- Building waterproofing for earth-contacting components, including protection/drainage layers, connections, and leak tightness proofs.
- Roof waterproofing works, including waterproofing systems (e.g., flat roof/green roof), insulation, details at penetrations/attics, and leak tightness proofs.
- Roofing works, including roof covering, substructure/underlay membranes, connections, and penetrations.
- Plumbing/Sheet metal works, including roof drainage/coverings/sheet metal work, penetrations, and fastenings.
- Plastering and stucco works, and ETICS (External Thermal Insulation Composite Systems), including interior/exterior plasters, reinforcements, connections, and surface qualities based on samples.
- Windows and exterior doors.
- Painting/Varnishing works, including substrate preparation, paints/varnishes, protective measures, and sampling.
- Flooring works, including substrate preparation, coverings with plinths/transitions, gluing, and protective measures until acceptance.
- Wallpapering works, including substrate preparation, wall coverings, connections, and protective measures.
- Lightweight partition walls/Suspended ceilings, potentially including fire protection and acoustic requirements, spackling qualities, and connections.
The tender also requires specific planning services from LPH 5 to LPH 9 (phases of service according to HOAI):
- Object Planning for Buildings (Objektplanung Gebäude) for the school building, sports hall, and underground garage, covering complete execution and detailed planning. This includes full planning, delivery, assembly, commissioning, functional testing, and documentation of user-specific services, along with all necessary interfaces to construction, technical building equipment (TGA), electrical engineering (ELT), IT network, and fire protection.
- Structural Engineering Planning (Tragwerksplanung), including workshop and detailed planning, formwork and reinforcement plans, and construction and assembly documents.
- Electrical Execution Planning (Ausführungsplanung ELT), covering power supply, distribution/sub-distribution planning, routing and cabling, lighting (including sports hall), safety/emergency lighting, earthing/potential equalization, lightning protection, IT/network interfaces, and full integration of security technology.
Sources
- 1092.31_GSK_FLB_Kostenzusammenstellung_Blankett_V0.PDF — “Aufmaß, Ausführungs-/Werk-/Montageplanung, Lieferung/Montage, Anschluss- und Nebenarbeiten, Schnittstellenkoordination, Prüfungen, Inbetriebnahme, Einweisung und Dokumentation. Inklusive Aushub, Verfüllung/Wiederverfüllu…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 365 FILES
- 231110_Standard_Teil F_Sporthallen.pdf2.0 MBPDF
- 66076_TA_240508_BER_Licht-AUR_G.2.11.pdf455 KBPDF
- Strom.pdf5.4 MBPDF
and 358 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.