Published
Errichtung eines Trafo- und Batteriegebäudes
Notice number: ocds-mnwr74-3bed1917-b1f2-4553-88db-5c0721dc0d8c
KEY INFORMATION
- Submission deadline
- • Oct 27, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Wissenschaftsstadt Darmstadt vertr. durch Darmstädter Stadtentwicklungs GmbH & Co.KG (DSE)
- Accepted Languages
- DEU
- Tender type
- Works
- Contract Value
- Published date
- Sep 24, 2026
TENDER DESCRIPTION
This tender requires a contractor for the comprehensive planning, installation, and commissioning of a central power supply facility, comprising a 1 MW medium-voltage transformer substation and a battery building, for a new main fire station. The scope includes detailed engineering, the delivery and installation of 20kV/0.4kV, 1000 KVA transformers compliant with ecological design standards, medium and low-voltage switchgear, a redundant power supply system, earthing, and extensive electrical and fiber optic communication infrastructure, all adhering to specified IT and cybersecurity requirements for an energy and condition monitoring system. The project execution is scheduled between October 5, 2027, and November 26, 2027, with on-site work to be completed within 25 working days after a client call-off, following preparatory activities. Tenderers must submit self-declarations regarding turnover for comparable services over the last three financial years, provide auditor confirmations or audited financial statements, and declare compliance with tax and social security obligations.
TENDER BRIEF
The contract is expected to start on October 5, 2027. The work is to be completed, ready for acceptance, by November 26, 2027. The total duration for the construction period is expected to be between October 5 and November 26, 2027, with the work to be completed within 25 working days.
Key milestones and phases include:
- The call for performance will occur between September and October 2027, with a 14-day lead time.
- After the order is placed, preparatory activities such as workshop and assembly planning, coordination with the network operator, and coordination of delivery dates and delivery are to commence.
- The actual execution date is contingent on the construction progress of construction phase 2 of the civil engineering measure and will be announced two to three weeks in advance.
- The contractor is expected to begin performance within 12 working days after receiving the client's request, which is anticipated by October 5, 2027.
Sources
- 11790069955188.pdf — “Wochen vorher angekündigt. Abrufauftrag, bei der eine Aufforderung durch den AG erfolgt, dass innerhalb von 12 Werktagen mit den Arbeiten vor Ort zu beginnen ist (§5 Abs. 2 Satz 2 VOB/B). Die Arbeiten sind dann innerhalb…”
- 2214_Besondere Vertragsbedingungen.docx — “| | Vergabenummer | BFN-4-02-00-XTR Maßnahme | Neubau Berufsfeuerwehr Nord - Errichtung einer Trafostation Leistung | Errichtung einer Trafostation BESONDERE VERTRAGSBEDINGUNGEN 1 | Ausführungsfristen (§ 5 VOB/B) 1.1 | F…”
- 3211_Aufforderung zur Abgabe eines Angebots.docx — “Dienstgebäude: Wilhelminenstraße 1-3; Fristenbriefkasten: Luisenplatz 2 10 | Zusätzliche Angaben | 10.1. Wir bitten Sie die Urkalkulation schon bei Angebotsabgabe als verschlüsselte ZIP-Datei hochzuladen. Diese ist mit e…”
The core scope of work and statement of work summary for this tender involves comprehensive planning, installation, and commissioning services for an electrical substation and associated infrastructure. Key areas include:
- Planning and Documentation: Detailed engineering and assembly planning (Werk- und Montageplanung) covering network topology, distribution cabinets, connection boxes, cable routes, and connection details. This includes creating assembly drawings, labeling plans, terminal plans, material lists, and parts lists. Coordination with electrical planners and other trades, incorporation of changes, and creation of revision documents are also required. All documentation must be delivered in verifiable form and digital formats (DWG, PDF).
- Electrical and Communication Infrastructure: Installation and connection of data and supply lines, including fiber optic (LWL) connections with patching. This involves the configuration and commissioning of network components, such as IP addressing, VLAN setup, and port assignments, along with functional testing of data connections. The work also covers the provision, bundling, laying, and connection of MS cables (e.g., NA2XS(F)2Y 1X70RM/16) including connection sleeves and accessories.
- Site Management and Project Coordination: Establishment and clearing of the construction site, provision of cable pulling equipment, and overall project management including material and personnel coordination, participation in construction meetings, defining preliminary services, monitoring and coordinating assembly teams, reviewing connection conditions, establishing schedules, and clarifying interfaces.
- Monitoring and Control Systems: Creation and parameterization of web-based overview displays for the electrical network within an energy and condition monitoring system. This includes a general overview of the electrical network structure, transformer station, low-voltage main distribution (NSHV Trafostation), energy flows, switching and operational states, measurement values, and alerts. Additionally, an energy, measurement value, and status dashboard must be created and parameterized.
- Transformer Installation: Delivery and installation of 20kV/0.4kV transformers, specifically 1000 KVA units, which must adhere to specific ecological design standards (e.g., EN 50588-1:2014-07 Stage 2).
- Earthing System: Installation of the earthing system for the station building, including deep electrodes.
- Pre-Acceptance Operation: Operation of the contractual facility or parts thereof prior to formal acceptance, including operation, monitoring, and necessary maintenance to ensure operational readiness and functionality, as well as troubleshooting.
Sources
- 1260916_BFN_FT4_LV_Stationsgebäude blankett.pdf — “Die Werk- und Montageplanung umfasst ausschließlich die pla- nerische Ausarbeitung der nachfolgend beschriebenen Inhalte im Rahmen der vertraglich vorgegebenen System- und Ausfüh- rungsrandbedingungen: | | | Darstellung…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 25 FILES
- 216_Verzeichnis der im Vergabeverfahren vorzulegenden Unterlagen.docx26 KBDOCX
- Weitere besondere Vertragsbestimmungen I.-III.docx34 KBDOCX
- 235_Verzeichnis der Leistungen_Kapazitäten anderer Unternehmen.docx21 KBDOCX
and 18 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.