    Neubau Feuerwehrhaus Westendorf (Ostallgäu) - Leistungen der Tragwerksplanung gem. §§ 49 ff HOAI 2021, LPH 1-6, bei stufenweiser Beauftragung.

    Notice number: 00577464-2026

    🇩🇪 GermanyGemeinde WestendorfServices

    KEY INFORMATION

    Submission deadline
    Sep 8, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Gemeinde Westendorf
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 20, 2026

    TENDER DESCRIPTION

    This tender invites proposals for structural engineering services ("Tragwerksplanung") for the construction of a new fire station in Westendorf (Ostallgäu), designed to accommodate approximately 80 active members with a vehicle hall (approx. 15.80 × 14.00 m), an integrated wash bay (approx. 6.00 × 11.00 m), storage, workshop, training, administration, and ancillary facilities, totaling approximately 950 m² of usable floor area. The scope of work adheres to §§ 49 et seq. HOAI 2021, covering performance phases 1 through 6, with phased commissioning and the potential for additional special services up to phase 8. Project development allows for flexibility in construction methods, including timber, modular, or conventional solid construction, with a mandate for designs that are durable, environmentally friendly, resource-efficient, and cost-effective, while all project communication must be in German. The contract award is slated for November/December 2026, with construction commencing in Q2 2027 and anticipated completion by Q3 2028. Applicants are required to demonstrate a minimum average annual turnover of 360,000 EUR brutto in structural engineering over the last three financial…

    TENDER BRIEF

    The contract timeline is as follows:

    • Start of Construction (Baubeginn): 02/2027
    • Completion Date (Fertigstellungstermin): Q3/2028
    • Start of Use (Nutzungsbeginn): 31.09.2028

    Key milestones and phases include:

    • Stage 1: Basic Evaluation (Grundlagenermittlung) and Preliminary Planning (Vorplanung)
    • Stage 2: Draft Planning (Entwurfsplanung) and Approval Planning (Genehmigungsplanung)

    These service stages are to be commissioned in writing by the client after the completion of the preceding stage. The contractor is obligated to provide further services in subsequent stages if no more than 6 months have passed since the completion of the last transferred service, and the client has announced the transfer at least four weeks in advance.

    Sources

    • 100_Westendorf_FWH_TWP_Vertrag.pdf — “Vertrauen des Auftraggebers hat. Der Auftraggeber kann darüber hinaus eine Ergänzung des Personals durch geeignete Fachleute verlangen, wenn die eingesetzten Mitarbeiter nicht in ausreichendem Maße eine rechtzeitige Plan…

    The core scope of work for this tender involves structural engineering planning ("Tragwerksplanung") for the new fire station with a washing bay in Westendorf (Ostallgäu).

    A high-level summary of the Statement of Work and core deliverables includes the following service phases:

    • Service Phase 1 (Basic Appraisal): Summarizing, explaining, and documenting results to provide a comprehensive overview of the project fundamentals.
    • Service Phase 2 (Preliminary Design): Contributing to the development of a planning concept, estimating overall costs, analyzing and coordinating fundamentals, providing static-constructive advice, assisting in the development of the structural concept, and participating in preliminary discussions for approval. This phase also includes summarizing, explaining, and documenting results with a written explanatory report.
    • Service Phase 3 (Detailed Design): Developing an approval-ready, constructively and economically sound structural solution. Key activities include developing the structural solution with drawings, performing approximate static calculations and dimensioning, defining fundamental constructive details, estimating quantities of materials (e.g., concrete reinforcement, steel, wood), contributing to the object description regarding structural aspects and cost impacts, participating in negotiations with authorities, assisting with cost calculation and scheduling, assisting with cost control, and summarizing/explaining/documenting results.
    • Service Phase 4 (Approval Planning): Preparing verifiable static calculations for the structure, considering building physics requirements, and creating position plans for the structure.
    • Service Phase 6 (Preparation for Award): Contributing to the object planner's performance specification and program.
    • Service Phase 7 (Assistance in Awarding): Assisting in the review and evaluation of offers based on the object planner's performance specifications.
    • Service Phase 8 (Site Supervision): Providing engineering technical control of the structural execution to ensure conformity with the approved static documents.

    The project also has specific planning and monitoring goals concerning:

    • Quantities: Implementation according to the approved room program, planning of unmentioned areas (e.g., corridors, technical rooms) to an economical and usable size, and adherence to existing studies, expert opinions, and client decisions.
    • Qualities: The building must be durable, environmentally friendly, resource-efficient, and cost-effective, with all qualities to be sampled and coordinated with the client.
    • Design, Functional, and Technical Goals: These are to be developed in close coordination with the client.

    Sources

    • 100_Westendorf_FWH_TWP_Vertrag.pdf — “Tragwerksplanung für die Baumaßnahme: Genaue Bezeichnung der Baumaßnahme: Neubau Feuerwehrhaus mit Waschhalle in Westendorf (Ostallgäu) 1.2 Der Auftrag umfasst Leistungen bei der Tragwerksplanung für folgende Gebäude: Ne…
    • 202_Westendorf_FWH_TWP_HAV-KOM_ZVB-Trag_2024.pdf — “Zusammenfassen und Erläutern und Dokumentieren der Ergebnisse 1.4.1 Zusammenfassen der Ergebnisse aus der Leistungsphase 1 und Übergeben in übersichtlicher geordneter schriftlicher Form. Die Zusammenfassung soll dem Auft…
    • 304_Westendorf_FWH_TWP_Formblatt-zum-Honorarangebot.xlsx — “5: Rohbauzeichnungen im Stahlbetonbau (Gründung etc.), die auf der Baustelle nicht der Ergänzung durch die Pläne des Objektplaners bedürfen.",,,,,, ,,,,,,,, ,,,,,,,psch, ,,,,,,,, ,,"in LPH 6: Beitrag zur Leistungsbeschre…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 16 FILES

    • VgV_Westendorf_FWH_TWP_V1-Matrix_Eignungskriterien.pdf
    • 01_Westendorf_FWH_TWP_HAV-KOM_AVB-Arch-ING_2021.pdf
    • VgV_Westendorf_FWH_TWP_V2-Matrix-Zuschlagskriterien.pdf

    and 9 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders