Published

    NL-Petten: Technical design services by a Computer Aided Design (CAD)

    Notice number: 00625790-2026

    🇳🇱 NetherlandsEuropean Commission, DG JRC - Joint Research CentreServices

    KEY INFORMATION

    Submission deadline
    • Oct 23, 2026
    Location
    🇳🇱 Netherlands
    Contracting authority
    European Commission, DG JRC - Joint Research Centre
    Accepted Languages
    Bulgarian, Czech, Danish, German, Greek, English, Spanish, Estonian, Finnish, French, Irish, Croatian, Hungarian, Italian, Lithuanian, Latvian, Maltese, Dutch, Polish, Portuguese, Romanian, Slovak, Slovenian, Swedish
    Tender type
    Services
    Contract Value
    Published date
    Sep 10, 2026

    TENDER DESCRIPTION

    This tender seeks a qualified provider for comprehensive technical design services, including CAD drafting, 3D model generation, rendering, and scanning, alongside extensive Building Information Modelling (BIM) services for the JRC Petten site. The core scope encompasses updating existing AutoCAD drawings, creating new 2D and 3D models from various survey data, maintaining a digital drawing archive, and ensuring BIM model coordination, standardization, and compliance, supported by technologies such as AutoCAD (v16 or later) and basic GIS services. The successful contractor must demonstrate an average yearly turnover exceeding EUR 100,000 over the last two financial years and possess strong command of both Dutch (B2) and English (B1). The framework contract has a maximum duration of 48 months, with services typically provided by one senior draftsperson two days per week (one on-site, one off-site) and initiated via Purchase Orders.

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract Start Date: The Framework Contract (FWC) comes into force on the date the last party signs it.
    • Total Duration: The maximum duration of the FWC is 48 months from its entry into force.
    • Key Milestones/Phases:
    • The initial Purchase Order (PO) is aimed to be issued within one month of the framework contract's signature.
    • Ongoing services are structured with support provided two days per week, comprising one day on-site in Petten and one day off-site at the contractor's location.
    • At the beginning of each contractual year, a minimum of one consultation meeting will be held to initiate activities.
    • Year-end meetings can be requested by either the Petten JRC or the contractor to review progress, report on activities, and plan for the next contractual year.

    Sources

    • 12. Draft service FWC_V1.pdf — “hundred thousand Euro). 3. Entry into force and duration This FWC enters into force on the date on which the last party signs it. The maximum duration of this FWC is 48 months from the date this FWC enters into force. 4.…”
    • 24. Annex I - Part 1 - Administrative annex_V1.pdf — “Council of 23 September 2024 on the financial rules applicable to the general budget of the Union (recast) (OJ L, 2024/2509, 26.09.2024, ELI: https://eur-lex.europa.eu/eli/reg/2024/2509/oj/eng) 5 1.8. Duration of the con…”
    • 35. Annex I - Part 2 - Technical Specifications _V1.pdf — “the contractor. Services will be formally initiated via a Purchase Order (PO), as outlined in Article 4 of these specifications. The aim is to issue the first PO within one month of the framework contract's signature, wi…”

    The core scope of work for this tender, titled "NL-Petten: Technical design services by a Computer Aided Design (CAD)", primarily involves providing technical drafting and Building Information Modelling (BIM) services.

    A high-level summary of the Statement of Work and core deliverables includes:

    • Technical Drafting Services: This encompasses CAD drafting, creation of new drawings and models, 3D rendering, and 3D scanning and maintenance.
    • CAD Drafting: Updating existing AutoCAD drawings (electrotechnical, mechanical, and architectural/structural) using StabiCAD and other 'as-built' data for JRC Petten site buildings.
    • 3D Model Generation: Generating real 3D models using drone photography, laser scanning, and photogrammetry.
    • New Drawing and Model Creation: Developing project-specific 2D drawings and 3D models based on on-site surveys (drone, laser, photogrammetric data) and 'as-built' documentation from third parties for new projects.
    • 3D Rendering: Producing high-quality 3D visualizations for design validation, stakeholder presentations, and technical reviews.
    • 3D Scanning and Maintenance: Constructing and maintaining models of buildings/installations not yet modeled by 3D scanning and processing point clouds, adjusting MEP (mechanical, electrical, plumbing) and architectural/structural (ARCH) elements to reflect changes, and verifying incoming models from other contractors for accuracy and compliance.
    • Further Optimization Assignment:
    • Model Standardization: Cleaning models for uniformity across existing families.
    • Handbook Updates: Updating the site's 2D and 3D handbook as needed.
    • Data Enhancement: Setting up data for generating hydraulic and aerodynamic diagrams.
    • System Integration (BIM Services):
    • Model Coordination: Managing interdisciplinary BIM models (architecture, structure, MEP) and performing clash detection to resolve discrepancies.
    • Standards and Compliance: Enforcing BIM standards and protocols.
    • Training and Support: Providing BIM training and technical guidance to project teams.
    • Facility Management and Lifecycle Integration: Supporting data integration for facility management and lifecycle analysis.
    • Digital Drawing Archive Maintenance: Maintaining and updating the digital JRC drawing archive, including digitizing and archiving 'as-built' graphical documentation (separate quotation if required), ensuring the archive remains organized and accessible, and generating PDF/A copies of drawings upon request.
    • Off-site Drawing Services Coordination: Task delegation, quality assurance, and timely delivery of outputs to JRC specifications for off-site drawing services.

    The services will be provided by one senior draftsperson, with a proposed schedule of two days per week (one day on-site in Petten and one day off-site at the contractor's location), though this frequency may be adjusted. The services will be initiated via Purchase Orders.The core scope of work for this tender, titled "NL-Petten: Technical design services by a Computer Aided Design (CAD)", involves providing technical drafting and Building Information Modelling (BIM) services.

    The high-level summary of the Statement of Work and core deliverables includes:

    • Technical Drafting Services: This covers CAD drafting, creating new drawings and models, 3D rendering, and 3D scanning and maintenance.
    • CAD Drafting: Updating existing AutoCAD drawings (electrotechnical, mechanical, architectural/structural) using StabiCAD and 'as-built' data for JRC Petten site buildings.
    • 3D Model Generation: Generating real 3D models through drone photography, laser scanning, and photogrammetry.
    • New Drawing and Model Creation: Developing project-specific 2D drawings and 3D models based on on-site surveys (drone, laser, photogrammetric data) and 'as-built' documentation from third parties for new projects.
    • 3D Rendering: Producing high-quality 3D visualizations for design validation, stakeholder presentations, and technical reviews.
    • 3D Scanning and Maintenance: Constructing models of unmodeled buildings/installations by 3D scanning and processing point clouds, adjusting MEP and architectural/structural elements to reflect modifications, and verifying the accuracy and compliance of incoming models from other contractors.
    • Further Optimization Assignment:
    • Model Standardization: Cleaning models to ensure uniformity across existing families.
    • Handbook Updates: Updating the site's 2D and 3D handbook when necessary.
    • Data Enhancement: Setting up data for generating hydraulic and aerodynamic diagrams.
    • System Integration (BIM Services):
    • Model Coordination: Managing interdisciplinary BIM models (architecture, structure, MEP) and performing clash detection to resolve discrepancies.
    • Standards and Compliance: Enforcing BIM standards and protocols.
    • Training and Support: Providing BIM training and technical guidance to project teams.
    • Facility Management and Lifecycle Integration: Supporting data integration for facility management and lifecycle analysis.
    • Digital Drawing Archive Maintenance: Maintaining and updating the digital JRC drawing archive, including digitizing and archiving 'as-built' graphical documentation (which may require a separate quotation), ensuring the archive remains organized and accessible, and generating PDF/A copies of drawings upon request.
    • Off-site Drawing Services Coordination: This involves task delegation, quality assurance, and timely delivery of outputs according to JRC specifications.

    The services will be carried out by one senior draftsperson, with a typical schedule of two days per week (one day on-site at Petten and one day off-site at the contractor's location), subject to adjustment based on evolving requirements. Services will be formally initiated via Purchase Orders.

    Sources

    • 12. Draft service FWC_V1.pdf — “order services by sending the contractor a specific contract which the contractor must either send back duly signed and dated within 30 days, or instead, send an explanation of why it cannot accept the order. 1.5. Prices…”
    • 25. Annex I - Part 2 - Technical Specifications _V1.pdf — “the contractor. Services will be formally initiated via a Purchase Order (PO), as outlined in Article 4 of these specifications. The aim is to issue the first PO within one month of the framework contract's signature, wi…”

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 11 FILES

    • 4. Annex I - Part 1 - Administrative annex_V1.pdf
    • 2. Draft service FWC_V1.pdf
    • 9. Annex III - Safety regulations for third parties_V1.pdf

    and 4 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders