Novelacija projektne dokumentacije za rekonstrukciju i dogradnju sustava vodoopskrbe i odvodnje na području aglomeracije Popovača i Voloder
Notice number: 94158
KEY INFORMATION
- Submission deadline
- • Sep 15, 2026
- Location
- 🇭🇷 Croatia
- Contracting authority
- MOSLAVINA d.o.o.
- Accepted Languages
- Croatian
- Tender type
- Services
- Contract Value
- Published date
- Aug 17, 2026
TENDER DESCRIPTION
This tender seeks comprehensive services for the amendment of existing project documentation concerning the reconstruction and expansion of the water supply and drainage system within the Popovača and Voloder agglomeration, driven by the expiration of location and building permits. The scope of work for this single lot includes the development of a Conceptual Design, Partial Expropriation Elaborate, Techno-economic Analysis, Main Designs, and Cost Estimates, covering approximately 61,275.50 m of new gravity collectors, 17,014.25 m of pressure pipelines, 32 pumping stations, and 4 storm overflows for the drainage system, alongside 5,624.98 m of main pipeline reconstruction and 4,584.71 m of street water supply pipelines with 2 pumping stations. Technical specifications mandate the use of hydraulic calibrated mathematical models for drainage system dimensioning, digital documentation in .doc, .docx, and .pdf formats, and active Croatian language knowledge for key personnel. The contract duration is 360 days from signing, with staggered deadlines for deliverables, and economic operators must not have outstanding tax or social security contribution liabilities exceeding €1,000.00 to…
TENDER BRIEF
The contract has a total duration of 360 days. The contract starts from the date of mutual signing by both parties.
Key milestones for the preparation of project documentation are as follows:
- Idejni projekt (Conceptual Design): 60 days or 90 days from the date of mutual signing of the contract.
- Elaborat nepotpunog izvlaštenja (Partial Expropriation Study): 80 days or 120 days from the date of mutual signing of the contract.
For Main Projects (Glavni projekti), the deadlines from the date of mutual signing of the contract are:
- Izgradnja sustava odvodnje – faza 1 - Centar (Construction of drainage system – phase 1 - Center): 60 days or 120 days
- Izgradnja sustava odvodnje – faza 2 - Istok (Construction of drainage system – phase 2 - East): 120 days or 120 days
- Izgradnja sustava odvodnje – faza 3 - Donja Vlahnička (Construction of drainage system – phase 3 - Donja Vlahnička): 180 days
- Izgradnja sustava odvodnje – faza 4- Sjever (Construction of drainage system – phase 4 - North): 180 days
- Izgradnja sustava odvodnje – faza 5 Potok (Construction of drainage system – phase 5 Potok): 240 days
- Izgradnja sustava odvodnje – faza 6 - Osekovo (Construction of drainage system – phase 6 - Osekovo): 240 days
- Izgradnja sustava odvodnje – faza 7 - Donja Gračenica (Construction of drainage system – phase 7 - Donja Gračenica): 240 days
- Izgradnja sustava odvodnje – faza 8 - Voloder (Construction of drainage system – phase 8 - Voloder): 240 days
- Izgradnja sustava odvodnje – faza 9 - Gornja Gračenica (Construction of drainage system – phase 9 - Gornja Gračenica): 240 days
- Izgradnja sustava odvodnje – faza 10 - Stružec (Construction of drainage system – phase 10 - Stružec): 300 days
- Izgradnja magistralnog vodovoda od Velikog Brda do Donje Vlahičke (Construction of main water supply pipeline from Veliko Brdo to Donja Vlahička): 120 days
- Izgradnja vodovoda na Mramor Brdu (Construction of water supply pipeline on Mramor Brdo): 180 days
There are also alternative deadlines for main projects and other documents mentioned in a different source:
- Izgradnja sustava odvodnje - faza 1 - Centar: 180 days
- Izgradnja sustava odvodnje - faza 2 - Istok: 180 days
- Izgradnja sustava odvodnje - faza 3 - Donja Vlahička: 240 days
- Izgradnja sustava odvodnje - faza 4- Sjever: 240 days
- Izgradnja sustava odvodnje - faza 5 Potok: 300 days
- Izgradnja sustava odvodnje - faza 6 - Osekovo: 300 days
- Izgradnja sustava odvodnje - faza 7 - Donja Gračenica: 300 days
- Izgradnja sustava odvodnje - faza 8 - Voloder: 300 days
- Izgradnja sustava odvodnje - faza 9 - Gornja Gračenica: 300 days
- Izgradnja sustava odvodnje - faza 10 - Stružec: 360 days
- Izgradnja magistralnog vodovoda od Velikog Brda do Donje Vlahičke: 180 days
- Izgradnja vodovoda na Mramor Brdu: 200 days
- Tehno-ekonomska analiza (Techno-economic analysis): 120 days
These intermediate deadlines include obtaining location and building permits, approvals, and confirmations from public authorities and other interested parties.
Sources
- 1Opći podaci o postupku nabave.html — “id="313-troškovnik">3.1.3. Troškovnik Detaljan troškovnik se nalazi u zasebnom prilogu – Troškovnik. 3.1.4. Mjesto izvršenja Glavno mjesto izvršenja: Mjesto pružanja usluge je sjedište Ponuditelja. 3.1.5. Trajanje ugovor…”
- 2rokovi i plaćanje.docx — “ROK TRAJANJA UGOVORA / PRUŽANJA USLUGE Projektant se projektnu dokumentaciju obvezuje izraditi u ukupnom roku od 360 dana od dana obostranog potpisa Ugovora. Međurokovi za izradu projektne dokumentacije su slijedeći: R.b…”
- 3ugovor AG Popovača.pdf — “biti izrađene u otvorenom Office programskom paketu, a grafički prilozi (nacrti, situacije) u otvorenom .dwg formatu. Ako situacija sadrži rasterske podloge koje su uključene u crtež, potrebno ih je također priložiti. Čl…”
- 4PZ-Aglomeracija Popovača_odvodnja_vodoopskrba.pdf — “surađivati s izrađivačima sve prethodno navedene do sada izrađene tehničke dokumentacije, a koja je relevantna za izradu predmetne dokumentacije iz ovog Projektnog zadatka te sudjelovati na radnim sastancima sukladno tra…”
The core scope of work for this tender involves the revision of project documentation for the reconstruction and upgrade of the water supply and drainage system within the Popovača and Voloder agglomeration area.
The high-level summary of the Statement of Work and core deliverables includes:
- Conceptual Design (Idejni projekt)
- Partial Expropriation Elaborate (Elaborat nepotpunog izvlaštenja)
- Techno-economic Analysis (Tehno-ekonomska analiza) for both the drainage and water supply systems.
- Main Designs (Glavni projekti)
- Cost Estimates (Troškovnici)
The scope entails a revised division of the project area from 8 to 12 functional technical units and the creation of a single conceptual design to obtain a unified location permit. This permit will then guide the development of ten phases for future main drainage projects and two water infrastructure projects.
Specific design components include:
- Drainage System Construction (Izgradnja sustava odvodnje) across various phases and locations, such as Centar, Istok, Donja Vlahinička, Sjever, Potok, Osekovo, Donja Gračenica, Voloder, Gornja Gračenica, Stružec, and segments through Popovača, Voloder, Ravnik, Podbrđe, and Gornja Jelenska. This involves approximately 61,275.50 m of new gravitational collectors, 1,308.22 m of reconstructed gravitational collectors, around 17,014.25 m of pressure pipelines, 32 pumping stations, and 4 rain overflows.
- Construction of Main Water Pipeline (Izgradnja magistralnog vodovoda) from Veliko Brdo to Donja Vlahinička.
- Construction of Water Supply on Mramor Brdo (Izgradnja vodovoda na Mramor Brdu), including two pumping stations. The water supply system design includes approximately 5,624.98 m of main pipeline reconstruction and 4,584.71 m of street water supply pipeline with 2 pumping stations.
All services must align with Croatian regulations, professional standards, the Project Task, and the Bill of Quantities. Cost estimates must also adhere to the "Guidelines for determining acceptable project prices for investments in water utility projects for the financial period 2021-2027" issued by Hrvatske vode.
Sources
- 1Kriteriji za kvalitativni odabir gospodarskog subjekta.html — “10.821-1.5.846-3.476 1.179-5.37 1.179z"> Kriteriji kvalitativnog odabira gospodarskog subjekta s uputama 8/26 - Novelacija projektne dokumentacije za rekonstrukciju i dogradnju sustava vodoopskrbe i odvodnje na području…”
- 2Troškovnik.xlsx — “,,,,, ,,,,, ,"PONUDBENI OBRAZAC ZA IZRADU PROJEKTNE DOKUMENTACIJE ZA PROJEKT NOVELACIJA ""POBOLJŠANJE VODNO-KOMUNALNE INFRASTRUKTURE AGLOMERACIJE POPOVAČA I VOLODER""",,,, ,,,,, ,,,,, R.br.,Opis stavke,Jedinica mjere,Kol…”
- 3ugovor AG Popovača.pdf — “dokumentacije za rekonstrukciju i dogradnju sustava vodoopskrbe i sustava odvodnje na području aglomeracije Popovača i Voloder (dalje u tekstu: projektna dokumentacija). Usluge pružene temeljem Ugovora moraju biti u skla…”
- 4Troškovnik AGP_objava.xlsx — “ANALIZA,,,,,0 1.,Tehno-ekonomska analiza za sustav odvodnje,kpl,1,,0 2.,Tehno-ekonomska analiza za sustav vodoopskrbe,kpl,1,,0 D. GLAVNI PROJEKTI ,,,,,0 1.,"Izgradnja sustava odvodnje - Popovača, centar",kpl,1,,0 2.,"Izg…”
- 5Opći podaci o postupku nabave.html — “ponuditelja INFRATERRA d.o.o. Husain, SAFEGE d.o.o. Zagreb, VIA FACTUM d.o.o. Zadar, H5 d.o.o. Sesvete. – dostupna na uvid u prostorijama Moslavine d.o.o., Školska 4, 44320 Kutina. Ovom novelacijom projektne dokumentacij…”
- 6PZ-Aglomeracija Popovača_odvodnja_vodoopskrba.pdf — “fazu i za svaku cjelinu za koju će se ishoditi građevinska dozvola ili buduća uporabna dozvola. Troškovnik s rekapitulacijom treba sadržavati sve podatke (opis troškovničkih stavki, oznake jedinične mjere, količinu i sl.…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 20 FILES
- Prilog br.7. - MZOE Rješenje 2017.g..pdf2.0 MBPDF
- ugovor AG Popovača.pdf182 KBPDF
- Prilog br.10. - PZ tehno-ekonomska analiza KT.docx149 KBDOCX
and 13 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.