    Objektplanung Freianlagen

    Notice number: 00550218-2026

    🇩🇪 GermanyLandeshauptstadt München, BaureferatServices

    KEY INFORMATION

    Submission deadline
    Sep 9, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Landeshauptstadt München, Baureferat
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 7, 2026

    TENDER DESCRIPTION

    This tender seeks Object Planning for Outdoor Facilities, as per § 39 in conjunction with Anlage 11 of HOAI, for a replacement site for the Munich Volunteer Fire Department, Allach Division, at Eversbuschstraße 134, encompassing approximately 2,500 m2 of future open space. The scope includes services across Leistungsphasen 1 through 5 (Basic Evaluation, Preliminary Design, Draft Design, Approval Planning, and Execution Planning), with the potential for further services (Leistungsphasen 7-9) to be determined. The contract period runs from October 1, 2026, to October 31, 2034, with initial services concluding by March 31, 2027. Key technical requirements include adherence to DIN 18299 ff (VOB/C), GAEB XML DA 81 data exchange, STLK numbering, ISO 8859-15 character set, specific unit formatting (e.g., m2, m3), product-neutral tendering, and cost breakdown according to DIN 276-1:2008-12. Bidders must also provide proof of general and specific annual turnover, alongside professional indemnity insurance.

    TENDER BRIEF

    Question: What is the contract timeline?

    Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.

    Format: Answer with a plain text string. If not found, write "null".

    Contract start date: The beginning of the delivery or execution period is October 1, 2026. The commencement of initial services is also October 1, 2026.

    Contract end date: The end of the delivery or execution period is October 31, 2034. The completion of initial services is March 31, 2027.

    Total duration: The total duration for the delivery or execution period spans from October 1, 2026, to October 31, 2034, which is 8 years and 1 month.

    Key milestones or phases:

    • Initial Services (Leistungen nach 3.1): From October 1, 2026, to March 31, 2027. These initial services include Leistungsphase 1 (Grundlagenermittlung) and Leistungsphase 2 (Vorplanung).
    • Further Services: Dates and deadlines for additional services will be set in consultation with the contractor in writing. These further services may include Leistungsphase 7, Leistungsphase 8, and Leistungsphase 9.
    • Other Deadlines:
    • Offer deadline: September 9, 2026, at 11:00.
    • Opening date: September 9, 2026, at 11:00.
    • Deadline for written inquiries: September 3, 2026, at 11:00.
    • Binding period ends: November 9, 2026, at 23:59.

    Sources

    • 1hinweise_1.pdf — “Terminänderung Guten Tag, An der vorliegenden Vergabe wurden Änderungen an den Terminen vorgenommen. aktuelle Termine nach dieser Änderung: Beginn der Liefer- bzw. Ausführungsfrist: 01.10.2026 Ende der Liefer- bzw. Ausfü…
    • 2VGV_FFW Allach Neubau Feianlagen_Vertrag.pdf — “1 – fach auf Datenträger Leistungsphase 7 3 - fach in Papier 1 – fach auf Datenträger Leistungsphase 8 3 - fach in Papier 1 – fach auf Datenträger Leistungsphase 9 3 - fach in Papier 1 – fach auf Datenträger zu übergeben…

    The core scope of work for this tender is the Objektplanung Freianlagen (Object Planning for Outdoor Facilities) according to § 39 in conjunction with Anlage 11 of the HOAI (Fee Schedule for Architects and Engineers).

    The statement of work summary outlines services across several Leistungsphasen (Service Phases):

    • Leistungsphase 1 - Grundlagenermittlung (Basic Evaluation): This phase involves clarifying the overall task, concretizing the client's ideas regarding the type and size of the object, its usage, relevant legal and technical possibilities, and building standards. It also includes coordinating all technically involved parties and summarizing, explaining, and documenting the results. Certain specific tasks such as defining the object's type, size, and usage, building standards, cost framework, and establishing communication structures are explicitly performed by the client.
    • Leistungsphase 2 - Vorplanung (Preliminary Design): This includes developing a planning concept, creating a preliminary design, and integrating other planning services. A qualified cost estimation can be a special service within this phase.
    • Leistungsphase 3 - Entwurfsplanung (Draft Design): All basic services as defined in the HOAI are to be performed.
    • Leistungsphase 4 - Genehmigungsplanung (Approval Planning): All basic services are included, which entails preparing approval documents and applications.
    • Leistungsphase 5 - Ausführungsplanung (Execution Planning): This phase focuses on developing the execution planning based on the approved draft and approval plans, ensuring a solution ready for execution. It also involves coordinating with other technical planning parties and submitting the execution-ready plans to the client.

    The contractor is responsible for coordinating and reviewing the work of all technical specialists to ensure the absence of fundamental defects or contradictions and compliance with the client's approved program. The contractor is also required to minute the contents and results of planning and construction meetings. Progress to a subsequent service phase is contingent upon the client's confirmation of the completed phase and/or their approval to continue.

    Core deliverables across these phases typically include various working results, information, planning documents (such as drawings, calculations, and descriptions), explanatory reports, and potentially specific documents for cost estimations and funding applications. Digital and paper versions of the required documents must be submitted.

    Sources

    • 1VGV_FFW Allach Neubau Feianlagen_Vertrag.pdf — “weiteren Leistungen zu erbringen, wenn sie an ihn innerhalb von 24 Monaten nach Fertigstellung der jeweils zuletzt übertragenen Leistungen vergeben werden. Der Auftraggeber behält sich vor, die Übertragung weiterer Leist…
    • 2Anlage_2_Leistungsheft_Stand_0726.pdf — “Arbeitsergeb�nissen, Informationen, Planunterlagen, etc.) sind bei der Leistungsbewertung berücksichtigt und werden über die vereinbarten Nebenkosten abgegolten. Der AN hat die Leistungen aller an der beauftragten Planun…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 19 FILES

    • hinweise_1.pdf
    • eForm_16_24072.pdf
    • Anlage_7__Erklaerung_Masernschutzgesetz_Stand_1221.pdf

    and 12 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders