Published

    VV 025-26

    Notice number: 00556503-2026

    🇩🇪 GermanyKFE Klinik Facility-Management Eppendorf GmbHServices

    KEY INFORMATION

    Submission deadline
    Sep 10, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    KFE Klinik Facility-Management Eppendorf GmbH
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 11, 2026

    TENDER DESCRIPTION

    This tender seeks object planning (architectural services) in accordance with HOAI § 34 Abs. 4, encompassing all service phases (Lph. 1-9) for renovations and conversions of existing buildings at the University Medical Center Hamburg-Eppendorf, with potential phased commissioning that may commence from later stages (Lph 5-8). The framework contract is for a fixed term of two years, extendable by an additional two years, for a maximum total duration of four years, with individual contract values ranging from a minimum of €5,000.00 net to a maximum cumulative value of €1,500,000 net. Key technical requirements include the use of digital models (BIM) following the BIM-Leitfaden für die FHH and BAP, supporting IFC4 and IFC2x3 & 4, and delivering documentation in specified formats like searchable PDFs and Excel for measurement results. Bidders must demonstrate financial standing through declarations of annual turnover, provide professional liability insurance with a minimum coverage of €2 million per claim for property damage, personal injury, and financial losses (with a €4 million annual maximum), and submit bank information. Adherence to project timelines is critical, with…

    TENDER BRIEF

    The framework contract has a fixed term of 2 years from the contract start date, with an option for the contracting authority to extend it once by an additional 2 years through a written declaration, making a potential total duration of 4 years.

    Key milestones and phases for individual orders include:

    • Cost Estimation (Lph 2): Maximum 6 weeks after commissioning for calculable costs under 1 million €, or maximum 8 weeks for costs from 1 million €.
    • Drafting and Approval Planning (Lph 3 & 4) - Stage II: For calculable costs under 1 million €, drafting planning is due maximum 6 weeks after commissioning Stage II, with an additional 2 weeks for approval planning. For costs from 1 million €, drafting planning is due maximum 8 weeks after commissioning Stage II, plus 2 more weeks for approval planning.
    • Execution Planning (Lph 5), Preparation for Award (Lph 6), and Participation in Award (Lph 7) - Stage III:
    • Completion of execution planning (excluding specific HOAI services) is due maximum 10 weeks after commissioning Stage III for calculable costs under 1 million €, or maximum 12 weeks for costs from 1 million €.
    • Completion of tender documents is due an additional maximum of 6 weeks.
    • Documentation Phases:
    • Phase A "Project Realization": Ongoing documentation of planning and implementation (LPH 2-8 HOAI), to be completed immediately after each commissioned service phase.
    • Phase B "Project Completion": Final documentation after acceptance by the project leader and successful commissioning (LPH 8 HOAI).
    • The final revision of hand-revised workshop and assembly planning is due no later than four weeks after acceptance.

    In case of exceeding contract deadlines, a penalty of 0.2% of the proportional net billing sum for the affected deadline is incurred for each working day of delay, up to a maximum of 5% of that sum.

    The contract start date and a definitive overall contract end date are not explicitly stated, beyond the fixed and optional extension durations of the framework contract.

    Sources

    • 1260804_Rahmenvertrag Objektplanung kl. 1.5 Mio._final.docx — “auf Kosten des AN durch Dritte ausführen lassen (Selbstvornahme vor Fälligkeit). 9.3 Der AN ist auch vor der Abnahme während des gesamten Zeitraums der Leistungserbringung verpflichtet, gerügte Mängel an seinen Leistunge…
    • 2260804_Muster_Einzelvertrag Objektplanungunter 1.5 Mio EUR.docx — “Kostenschätzung (Lph 2): Unter 1. Mio. € anrechenbare Kosten maximal 6 Wochen nach Beauftragung ab 1 Mio. € anrechenbare Kosten maximal 8 Wochen nach Beauftragung Im Falle der Beauftragung des AN mit der Entwurfsplanung…
    • 32026_06_15 Anlage Dokumentation.pdf — “Anlage Dokumentation Während der gesamten Planungs- und Bauphase sowie der Vertragslaufzeit ist der AN für die Dokumentation der gesamten Leistungen und den Datenaustausch verantwortlich. Dabei hat er eine für den [AG] g…

    The core scope of work for this tender involves Object Planning (Architektenleistungen), which includes architectural services structured across multiple phases (Stufen) according to the German Fee Schedule for Architects and Engineers (HOAI), specifically § 34 Abs. 4.

    The Statement of Work (SOW) summary and core deliverables are organized into sequential stages:

    • Stufe I (Lph. 1-2): Grundlagenermittlung (Basic Evaluation) and Vorplanung (Preliminary Planning).
    • Lph. 1 (Grundlagenermittlung): Includes summarizing client requirements, defining tasks, documenting boundary conditions (e.g., building law, existing investigations), and recommending specialist planners.
    • Lph. 2 (Vorplanung): Involves clarifying objectives, handling conflicts, documenting the planning concept, compiling coordinated work results (including specialist planner services), area and room calculations, preparing a room book, documenting preliminary permit approvals, cost estimation (DIN 276), and a schedule. Optional services include creating a room book and integrating digital models (BIM) into preliminary planning.
    • Stufe II (Lph. 3-4): Entwurfsplanung (Design Planning) and Genehmigungsplanung (Approval Planning).
    • Lph. 3 (Entwurfsplanung): Core deliverables include compiling coordinated work results (including specialist planner services), providing necessary verifications and calculations for design planning, object description, updated area and room calculations, updated room book, door list, preliminary approval documentation, cost calculation (DIN 276), an updated schedule, and an explanatory report. This phase also requires the creation of the HU-Bau (Haushaltsunterlage Bau). Optional services include design-ready room book updates, life cycle cost calculation, detailed operating cost calculation, and integrating design planning into a digital object model (BIM) at a 1:100 scale.
    • Lph. 4 (Genehmigungsplanung): Focuses on compiling approval documents (for public-law permits, exceptions, exemptions) and documenting supplemented/adjusted planning documents and calculations.
    • Stufe III (Lph. 5-7): Ausführungsplanung (Execution Planning), Vorbereitung der Vergabe (Preparation for Award), and Mitwirkung bei der Vergabe (Assistance in Awarding).
    • Lph. 5 (Ausführungsplanung): Encompasses the compilation of coordinated execution planning work results, including all necessary execution, detail, and construction drawings (e.g., floor plans, sections, ceiling plans, standard details) and textual descriptions. It also includes reviewing general contractor's execution plans for compliance with functional specifications and permits. Optional services involve integrating execution planning into the digital object model (BIM) and updating the room book.
    • Lph. 6 (Vorbereitung der Vergabe): For individual awards, this includes basic services according to HOAI and creating the AU-Bau (Ausführungsunterlage Bau). For a General Contractor (GÜ) award, it involves creating a functional specification (FLB) based on design and approval planning, including maintenance services, and coordinating/integrating other planners' performance descriptions into the FLB.
    • Lph. 7 (Mitwirkung bei der Vergabe): Assistance in awarding.
    • Stufe IV (Lph. 8): Objektüberwachung (Object Supervision).
    • Stufe V (Lph. 9): Objektbetreuung (Object Support).

    Throughout these phases, documentation according to "Anlage 9" is a recurring requirement. The use of digital models (BIM) is a significant optional component, particularly for preliminary planning, design planning, and execution planning, with specific requirements for model creation and attribution.

    Sources

    • 1260804_Muster_Einzelvertrag Objektplanungunter 1.5 Mio EUR.docx — “darzulegen. § 4 Leistungen der bzw. des AN 4.1 Die Auftraggeberin (AG) überträgt der bzw. dem AN mit dem vorliegenden Einzelauftrag die Grundleistungen gemäß Stufe I (Lph. 1-2) für die Objektplanung (Architektenleistunge…
    • 22026_06_15 Anlage Dokumentation.pdf — “2] A - Projektrealisierung LPH 1 LPH 2 LPH 3 LPH 4 LPH 5 LPH 6 LPH 7 LPH 8.1 A1-Dokumentationspaket Grundlagenermittlung Zusammenfassen der Vorgaben, Bedarfe des Auftraggebers Zusammenfassung der Aufgabenstellung, Dokume…
    • 320260804_Formblatt Honoraraufstellung Architekten Rahmenvertrag kl.1,5Mio_final.xlsx — “Name des Bieters/der Bietergemeinschaft:,, Namen bitte hier eintragen,, ,, ,,Honorarangebotssummen ,, GRUNDLEISTUNGEN,,[Der nachfolgende Betrag zu den anrechenbaren Kosten ist eine fiktive Kostenannahme für das Rahmenang…
    • 4Anlage AIA_Vorlage_KFE_2600701.pdf — “Grundlage der Aufgabenbeschreibung in Vorplanungstiefe gemäß Leistungsphase 2 der HOAI. Alle geforderten Lösungsmöglichkeiten sind als 3D-Konzept-Modelle zu erstellen und anschließend mit dem Bestand und der Umgebung zu…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 10 FILES

    • 2026_06_15 Anlage Dokumentation.pdf
    • 20260804_Formblatt Honoraraufstellung Architekten Rahmenvertrag kl.1,5Mio_final.xlsx
    • 2 3 5 Anlage 05 Teilnahmeantrag_Verhandlungsverfahren_VV 025-26.docx

    and 3 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders