Published

    VV 025-26

    Notice number: ocds-mnwr74-e33a10f9-0ff7-401a-837f-c023710839cc

    🇩🇪 GermanyKFE Klinik Facility-Management Eppendorf GmbHServices

    KEY INFORMATION

    Submission deadline
    Sep 10, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    KFE Klinik Facility-Management Eppendorf GmbH
    Accepted Languages
    DEU
    Tender type
    Services
    Contract Value
    Published date
    Aug 9, 2026

    TENDER DESCRIPTION

    This tender seeks architectural object planning services for renovations and conversions of existing buildings at the University Medical Center Hamburg-Eppendorf (UKE) under a framework agreement with a potential total duration of up to four years, comprising a fixed 2-year term and an optional 2-year extension. The scope encompasses all nine HOAI service phases, from initial basic evaluation (Lph 1) through post-completion support (Lph 9), with an initial focus on Lph 1 and 2, and subsequent phases commissioned as optional call-offs, all subject to an approval procedure per § 64 HBauO. Key technical requirements mandate the use of IFC4 for master models, IFC2x3 & 4 for export, BIM Collaboration Format (BCF) for communication, and compliance with the BIM-Leitfaden für die FHH, with all documentation provided in searchable PDF and Excel formats. Individual project timelines for phases like cost estimation, design, and execution planning are strictly defined, while financial requirements include a minimum professional indemnity insurance coverage of €2 million per claim for property/personal damages and €2 million for financial losses, alongside declarations of company turnover and…

    TENDER BRIEF

    The framework agreement has a fixed term of 2 years from the contract start, with the option for the client to extend it once by an additional 2 years, resulting in a potential total duration of 4 years.

    Key milestones and phases for individual orders include:

    • Cost Estimation (Lph 2): A maximum of 6 weeks for costs under €1 million and a maximum of 8 weeks for costs from €1 million, both after commissioning.
    • Draft and Approval Planning (Lph 3 & 4) within Stage II:
    • Draft Planning: A maximum of 6 weeks for costs under €1 million and a maximum of 8 weeks for costs from €1 million, both after commissioning for Stage II.
    • Approval Planning: An additional 2 weeks following the completion of the draft planning.
    • Execution Planning (Lph 5), Preparation for Award (Lph 6), and Participation in Award (Lph 7) within Stage III:
    • Execution Planning: A maximum of 10 weeks for costs under €1 million and a maximum of 12 weeks for costs from €1 million, both after commissioning for Stage III.
    • Completion of Award Documents: A maximum of an additional 6 weeks.

    Documentation services are categorized into two phases:

    • Phase A – Project Realization: This involves ongoing documentation of planning and implementation in accordance with LPH 2-8 HOAI, to be completed immediately after each commissioned performance phase.
    • Phase B – Project Completion: This phase includes the final documentation after acceptance by the Project Leader and successful commissioning (LPH 8 HOAI). Hand-revised workshop and assembly planning (final revision) must be submitted no later than four weeks after this.

    No specific contract start or end dates are explicitly stated in the provided documents, only the duration relative to the "contract start".

    Sources

    • 1260804_Rahmenvertrag Objektplanung kl. 1.5 Mio._final.docx — “auf Kosten des AN durch Dritte ausführen lassen (Selbstvornahme vor Fälligkeit). 9.3 Der AN ist auch vor der Abnahme während des gesamten Zeitraums der Leistungserbringung verpflichtet, gerügte Mängel an seinen Leistunge…
    • 2260804_Muster_Einzelvertrag Objektplanungunter 1.5 Mio EUR.docx — “Kostenschätzung (Lph 2): Unter 1. Mio. € anrechenbare Kosten maximal 6 Wochen nach Beauftragung ab 1 Mio. € anrechenbare Kosten maximal 8 Wochen nach Beauftragung Im Falle der Beauftragung des AN mit der Entwurfsplanung…
    • 32026_06_15 Anlage Dokumentation.pdf — “Anlage Dokumentation Während der gesamten Planungs- und Bauphase sowie der Vertragslaufzeit ist der AN für die Dokumentation der gesamten Leistungen und den Datenaustausch verantwortlich. Dabei hat er eine für den [AG] g…

    The core scope of work for this tender involves object planning (architectural services) for construction projects, encompassing basic services across all nine phases (Leistungsphasen - Lph.) of the HOAI (German Fee Schedule for Architects and Engineers), with an initial focus on Lph. 1 and 2. Subsequent phases (Lph. 3 to 9) are optional and subject to separate call-offs by the client.

    The primary objectives include adherence to specified cost ceilings for construction (Kostengruppe 300 according to DIN 276 [2018-12]) for both construction and execution documents, and comprehensive documentation for all planning and execution stages.

    Key deliverables and activities across the different planning stages include:

    • Stufe I (Lph. 1 - Grundlagenermittlung & Lph. 2 - Vorplanung): Gathering client requirements, defining tasks, documenting existing conditions, preparing cost estimates (DIN 276), developing a schedule, and potentially creating a room book and integrating Building Information Modeling (BIM) into preliminary planning.
    • Stufe II (Lph. 3 - Entwurfsplanung & Lph. 4 - Genehmigungsplanung): Developing the design, creating the HU-Bau (Haushaltsunterlage Bau), preparing documentation for required verifications and calculations, updating room and area calculations, calculating life cycle costs, and compiling all necessary approval documents. Integration of BIM into the design is an optional service.
    • Stufe III (Lph. 5 - Ausführungsplanung, Lph. 6 - Vorbereitung der Vergabe & Lph. 7 - Mitwirkung bei der Vergabe): Developing execution, detail, and construction drawings. For single awards, this includes preparing AU-Bau (Ausführungsunterlage Bau) and tender documents. For general contractor awards, it involves creating a functional performance description (FLB) and coordinating interfaces. Assistance with the tendering process, including evaluation of offers, is also required. BIM integration into execution planning is an optional service.
    • Stufe IV (Lph. 8 - Objektüberwachung): Monitoring the construction process, documenting progress, managing defects, reviewing invoices, and controlling costs.
    • Stufe V (Lph. 9 - Objektbetreuung): Post-completion support for the building.

    Throughout the project, services also encompass coordination of trades, quality control, dimensioning and proofing, management of the approval process, quantity and cost determination, logistical planning, and change management. The entire project is subject to an approval procedure according to § 64 HBauO.

    Sources

    • 1260804_Muster_Einzelvertrag Objektplanungunter 1.5 Mio EUR.docx — “darzulegen. § 4 Leistungen der bzw. des AN 4.1 Die Auftraggeberin (AG) überträgt der bzw. dem AN mit dem vorliegenden Einzelauftrag die Grundleistungen gemäß Stufe I (Lph. 1-2) für die Objektplanung (Architektenleistunge…
    • 220260804_Formblatt Honoraraufstellung Architekten Rahmenvertrag kl.1,5Mio_final.xlsx — “Name des Bieters/der Bietergemeinschaft:,, Namen bitte hier eintragen,, ,, ,,Honorarangebotssummen ,, GRUNDLEISTUNGEN,,[Der nachfolgende Betrag zu den anrechenbaren Kosten ist eine fiktive Kostenannahme für das Rahmenang…
    • 32026_06_15 Anlage Dokumentation.pdf — “2] A - Projektrealisierung LPH 1 LPH 2 LPH 3 LPH 4 LPH 5 LPH 6 LPH 7 LPH 8.1 A1-Dokumentationspaket Grundlagenermittlung Zusammenfassen der Vorgaben, Bedarfe des Auftraggebers Zusammenfassung der Aufgabenstellung, Dokume…
    • 4Anlage AIA_Vorlage_KFE_2600701.pdf — “| X | | | | X | 050 Koordination der Fachgewerke | | | | X X X | | | X | X | | | X | Planungsfortschrittskontrolle und Quali- tätsprüfung 060 | | | | X X | | | | | | | | Bemessung und Nachweisführung 070 | | | | | | | |…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 10 FILES

    • 2 3 5 Anlage 05 Teilnahmeantrag_Verhandlungsverfahren_VV 025-26.docx
    • 2 3 5 Anlage 04 Teilnahmeunterlage_VV_unter1,5Mio. _v09 NEU_final_VV 025-26.docx
    • Anlage AIA_Vorlage_KFE_2600701.pdf

    and 3 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders