Objektplanung Ingenieurbauwerke
Notice number: 00575039-2026
KEY INFORMATION
- Submission deadline
- • Sep 23, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Landeshauptstadt München, Baureferat
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 19, 2026
TENDER DESCRIPTION
This tender seeks comprehensive structural engineering planning services ("Objektplanung") for the renovation of 12 accessible masonry channels (NE 600/900 to NE 900/1350) in the Maxvorstadt university district, utilizing GFK-Schlauchliner (UV-cured) and SF Schlauchliner (hot-water cured) methods. Services encompass HOAI performance phases 1-3 and 5-9, including basic evaluation, preliminary planning, draft planning, execution planning, assistance in awarding, construction supervision, and object support, with a strong emphasis on digital documentation (GAEB-90, DWG/DXF) and adherence to standards like RAL-GZ 961 and ZTV-Kanal Mü. The contract is scheduled to commence on December 1, 2026, and conclude by May 12, 2028, with phased commissioning and construction completion expected by calendar week 19/2028. Bidders must demonstrate adequate financial standing, including professional liability insurance with minimum coverage of EUR 2.0 million for personal injuries and EUR 1.5 million for other damages, maintained throughout the contract period and maximized at twice the coverage sums annually.
TENDER BRIEF
The contract timeline is as follows:
- Contract start date: December 1, 2026.
- Contract end date: May 12, 2028.
- Total duration: Approximately 1 year and 5 months.
- Key milestones and phases:
- Planning start: From the date of order placement, but no earlier than December 1, 2026.
- Completion of commissioning stage 1: By calendar week 1/2027 at the latest. This stage covers HOAI service phases 1 to 2.
- Start of commissioning stage 2: From calendar week 2/2027 at the earliest. This stage covers HOAI service phase 3.
- Start of commissioning stage 3: From calendar week 12/2027 at the earliest. This stage covers HOAI service phases 5 to 9, including construction supervision.
- Commissioning of the construction company: By calendar week 35/2027 at the latest.
- Completion of construction work, including defect rectification: By calendar week 19/2028 at the latest.
- Internal approval periods of 4-6 weeks are also noted.
Sources
- 1260813_Vertrag_Maxvorstadt_Univiertel.pdf — “beauftragten Leistungen folgende maximalen Ausführungszeiträume vom Zeitpunkt der Beauftragung der jeweiligen Stufe verbindlich einzuhalten: Planungsbeginn: ab Auftragserteilung, frühestens jedoch ab 01.12.2026 Seite 9 v…”
- 2eForm_16_24394.pdf — “Renovierung von 12 begehbaren Mauerwerkskanälen NE 600/900 bis NE $900/1350$ mittels Schlauchliner. Die Sanierungsstrecken befinden sich hauptsächlich im Stadtgebiet Maxvorstadt und weisen neben den teils schwierigen Ver…”
The core scope of work and statement of work summary for this tender encompass a comprehensive "Objektplanung" (object planning) project, primarily focused on canal rehabilitation. The work is structured across multiple service phases (Leistungsphasen):
Leistungsphase 1 - Grundlagenermittlung (Basic Evaluation): This involves clarifying the task, determining the scope of preliminary work (e.g., structural investigation, nominal width determination), identifying planning conditions, advising on overall service needs, collecting information from various departments, formulating decision aids for selecting other involved parties, conducting site inspections, and documenting all findings in a status report. The status report must include a comprehensive overview of project basics, hydraulic conditions, site visit results, photo documentation, and a recommendation for further action.
Leistungsphase 2 - Vorplanung (Preliminary Planning): Key activities include analyzing existing conditions, performing condition and damage analyses, aligning objectives with public-law requirements and third-party plans, investigating solution options with a multi-criteria analysis (considering market situation, hydraulic loss, execution duration, traffic impact, disposal, soil conditions, costs), procuring and evaluating official maps, developing a planning concept with alternative solutions, clarifying technical contexts, coordinating with authorities for approval, and revising the concept based on feedback. Deliverables include a status report detailing damage causes, selection of rehabilitation methods, object-related cost framework, and a comparison of alternative solutions.
Leistungsphase 3 - Entwurfsplanung (Draft Planning): This phase entails detailed presentation of the chosen rehabilitation variant, specialized calculations, graphic representation of the measure, presentation of utility line locations, and creation of construction schedules and cost plans. Special services include developing flow control/flood protection concepts (including pump and discharge line dimensioning for all affected lines), conducting on-site building inspections for wastewater diversion planning, developing quality assurance and emergency/clearance concepts, monitoring water levels, and defining alarm concepts. Consideration of potential unexploded ordnance contamination and integration of occupational health and safety requirements are also crucial.
Leistungsphase 5 - Ausführungsplanung (Execution Planning): This involves checking and correcting planning details in the construction area, creating graphic representations, explanations, and calculations with necessary individual details and detailed drawings. The planning documents require contractor marking for release and client final approval. The contractor must integrate contributions from other technically involved parties and update the execution planning during the project. Status reports are required, detailing all necessary individual installations and plans, textual explanations of rehabilitation specifications, quality assurance measures, detailed planning for liner connections, preliminary work, flood protection, wastewater management, and rehabilitation of intermediate structures. Special services include updating the flow control, quality assurance, and emergency/clearance concepts.
Leistungsphase 7 - Mitwirkung bei der Vergabe (Assistance in Awarding): This phase requires the preparation of a detailed service description, including the completion and detailing of quantity determinations (documented digitally in GAEB-90 format), incorporation of safety and flood protection concepts, integration of occupational health and safety requirements, and coordination of contract-relevant content with the client. It also includes describing construction site setup and maintenance, detailing various positions for temporary construction site equipment, and compiling a list of object documentation for acceptance. Deviations from ZTV-Kanal Mü must be coordinated. Basic services for this phase may be performed by the client or waived.
The tender also includes Leistungsphase 6 - Vorbereiten der Vergabe (Preparation for Awarding), Leistungsphase 8 - Bauoberleitung (Construction Supervision), and Leistungsphase 9 - Objektbetreuung (Object Support), as indicated in the fee proposal.
Throughout all phases, the contractor is required to consider the condition of the existing structure and the hydraulic flow situation. All provided basic services, including supplementary services, must be rendered. The contractor is responsible for reviewing and verifying existing information provided by the client. The client will provide environmental information, expert opinions, monitoring reports, groundwater data, and static calculations for the canal's residual stability and required liner wall thickness. The client will also undertake specific tasks such as obtaining public-law permits (with contractor support), applying for permits, procuring cadastral maps, surveying the construction site, obtaining land use consents, conducting the awarding process (with contractor contributions), managing security shutdowns for canal inspections, and awarding geotechnical and SiGeKo services (with contractor contributions).
Sources
- 102_Anlage_Vertragliche Leistungen (Leistungsbeschreibung).pdf — “später vorzulegende Baustellendokumentation. Berücksichtigen des Zustandes des vorhandenen Bauwerkes für alle Leistungen Berücksichtigen der hydraulischen Abflusssituation für alle Leistungen - Hinweis: Es sind die volls…”
- 212_Anlage_III-16-2a_Honorarangebot.xlsx — “,Bieter (Firmierung + Adresse):,,,,,, ,,,,,,, ,Honorarangebot,,,,,, ,,,,,,, ,,,,,,, ,Ich/Wir biete(n) die Ausführung der beschriebenen Leistungen wie folgt an:,,,,,, ,(ALLE gelben Felder sind vom Bieter auszufüllen.),,,,…”
- 3260813_Vertrag_Maxvorstadt_Univiertel.pdf — “hin, dass die Bestandsinformationen von dem AN nicht ungeprüft übernommen und berücksichtigt werden können, sondern jeweils vorab auf ihre Verwendbarkeit geprüft werden müssen. 1.4. Umweltrelevante Informationen, wie etw…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 35 FILES
- Arcisstr.pdf283 KBPDF
- Augustenstr.pdf621 KBPDF
- 013014-2024-11-12.pdf201 KBPDF
and 28 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.