Published
Objektplanung
Notice number: 00566958-2026
KEY INFORMATION
- Submission deadline
- • Sep 16, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Landeshauptstadt München, Baureferat
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 17, 2026
TENDER DESCRIPTION
This tender invites proposals for Object Planning services, encompassing Leistungsphasen (LPH) 1-5 according to § 34 HOAI, for the comprehensive general refurbishment and extension of the historic Hirschbergstr. 33 primary school in Munich. The project aims to transform the 1901-1903 listed building into a full-day, 5-stream primary school, integrating a double sports hall, cafeteria, THV apartment, a house for children, outdoor play areas, and parking, while addressing existing structural challenges, water damage, pollutant loads, and fire protection deficiencies. This scope specifically excludes the planning of a temporary timber module pavilion and the organization of the relocation of the "Haus für Kinder". The project demands adherence to Zusätzliche Technische Vertragsbedingungen (ZTV), DIN standards, municipal building guidelines, and robust sustainability methodologies, including intensified timber and hybrid construction, circular economy principles, use of recycled materials, achieving Effizienzgebäude EG 40 (new build) and EG 55 (renovation) standards, hybrid ventilation, and renewable energies. All project communication, submissions, and invoicing must be conducted…
TENDER BRIEF
The contract timeline includes both a specific estimated duration for a planning phase and an overall project timeline with various milestones.
For Leistungsphase 5 (Lph. 5), the estimated contract duration is from December 15, 2026, to December 31, 2029.
The overall project, referred to as "Gesamtprojekt," spans from the 1st quarter of 2026 to the 4th quarter of 2034.
Key milestones and phases explicitly mentioned in the timeline include:
- VgV Objektplanung LPH 1-5
- Auftragsvergabe Objektplanung (Award of contract for object planning)
- Planung, LPH 2-5 (Planning, Phase 2-5)
- Vorentwurf mit Kostenschätzung (Preliminary design with cost estimate)
- Projektauftrag (Project order)
- Entwurf mit Kostenberechnung (Design with cost calculation)
- Projektgenehmigung (Project approval)
- Bauantrag (Building application)
- Baugenehmigung (Building permit)
- Werkplanung und Ausschreibung (Execution planning and tendering)
- Werkplanung (Execution planning)
- Ausschreibung 60% Paket (Tendering 60% package)
- Ausführungsgenehmigung (Execution approval)
- Bauphase (Construction phase)
- Bauphase BA I mit vorbereitenden Maßnahmen (Construction phase BA I with preparatory measures)
- Bauphase BA II mit vorbereitenden Maßnahmen (Construction phase BA II with preparatory measures)
- Inbetriebnahme (Commissioning)
Sources
- 1eForm_16_22238.pdf — “Lph. 5 Ein Rechtsanspruch auf Gesamtbeauftragung besteht nicht. Siehe Vergabe-/Auftragsunterlagen 5.1.2 Erfüllungsort Stadt: München Postleitzahl: 80634 Land, Gliederung (NUTS): München, Kreisfreie Stadt (DE212) Land: De…”
- 2HBG_Grobterminplan.pdf — “Vorgang 1.Q | 2026 2.0 3.0 4.0 1.0 | 2027 2.0 3.0 4.0 | 2028 1.0 2.0 3.0 4.Q | 2029 1.Q 2.Q 3.Q4.Q | 2030 1.Q 2.0 3.0 | 4.0 | 2031 1.0 2.0 3.0 | 4.0 1.0 | 2032 2.0 3.0 | 4.0 1.0 | 2033 2.0 3.0 4.0 1.0 2.0 | 2034 3.0 4.Q…”
The core scope of work for this tender is the "Objektplanung" (object planning) according to § 34 HOAI (German Fee Schedule for Architects and Engineers) for Leistungsphasen (LPH) 1-5. This involves the general refurbishment and expansion of the Hirschbergstr. 33 elementary school in Munich into a full-day, 5-stream elementary school, including a double sports hall, cafeteria, THV apartment, a house for children (2-4-0), outdoor play areas, and outdoor parking spaces.
The statement of work summary outlines services across all nine Leistungsphasen:
- Leistungsphase 1 - Grundlagenermittlung (Basic Evaluation): This includes summarizing, explaining, and documenting results, creating an explanatory report with all work results, and proposing a reasoned recommendation for further action. Special services in this phase include existing building surveys, creation of existing documentation (covering geological, ground, and building-related data, and producing existing plans with quality features like fire protection and technical building equipment), and potentially a feasibility study.
- Leistungsphase 2 - Vorplanung (Preliminary Planning): Project and planning preparation.
- Leistungsphase 3 - Entwurfsplanung (Design Planning)
- Leistungsphase 4 - Genehmigungsplanung (Approval Planning)
- Leistungsphase 5 - Ausführungsplanung (Implementation Planning)
- Leistungsphase 6 - Vorbereitung der Vergabe (Preparation for Awarding): Key tasks involve setting up and updating a trade-oriented tender schedule, preparing service descriptions with bills of quantities based on performance areas, determining and compiling quantities, coordinating and defining interfaces and performance boundaries, creating planning documents for quantity determination, and ensuring high accuracy in quantity determination. It also includes taking over information for client-side preliminary services, agreeing on the division of trades into award units, defining units for execution approval and EU-wide tendering, and preparing service descriptions by trade lots, titles, and building components according to the Standard Performance Book, delivered in XHL or XAL data exchange format. Furthermore, compiling tender documents, suggesting suitable companies for restricted tenders, and executing preliminary publications are part of this phase. A special service is the creation of an execution schedule.
- Leistungsphase 7 - Mitwirkung bei der Vergabe (Assistance in Awarding)
- Leistungsphase 8 - Objektüberwachung Bauüberwachung und Dokumentation (Object Supervision, Construction Supervision, and Documentation)
- Leistungsphase 9 - Objektbetreuung (Object Support)
The project specifically addresses a listed school building from 1901-1903, considering reconstruction measures, water damage, numerous alterations, pollutant loads, and fire protection deficiencies. The construction of a 3-story timber module pavilion is excluded from this contract, as is the organization of the relocation of the "Haus für Kinder". The estimated costs are approximately 38,000,000 EUR for the existing building's general refurbishment and 16,700,000 EUR for the new extension.
Sources
- 1eForm_16_22238.pdf — “Deutschland: Dienstleistungen von Architektur- und Ingenieurbüros sowie planungsbezogene Leistungen Objektplanung Auftrags- oder Konzessionsbekanntmachung - Standardregelung 1 Beschaffer 1.1 Beschaffer Offizielle Bezeich…”
- 203_HBG_Leistungsheft_Objektplanung_20260629.pdf — “der Fachplaner hinsichtlich: des jeweils zu beauftragenden Leistungsumfangs, der Leistungsabgrenzung (Schnittstellen zwischen den Leistungsbildern des Auftragnehmers und der Fachplaner sowie der Fachplaner untereinander)…”
- 3VU_BauR H-40111-2026.pdf — “ihrer Novellierung auf die alte DIN-Fassung ab. Sofern eine Vergütung nach HOAI vereinbart wird, ist für die Ho- norarermittlung weiterhin die DIN 276-1:2008-12 zu Grunde zu le- gen. Bitte beachten Sie dies bei Ihrer Ang…”
- 4HBG_Honorarangebot_HOAI_Objektplanung_eVergabe_FB.xlsx — “,,,,,, ,Honorarangebot zum Vertrag,,,Generalinstandsetzung und Erweiterung der ,, ,,,,Grundschule Hirschbergstr. 33,, ,Objektplanung,,,Vergabenummer: BauR H-40111-2026,, ,, ,,,, ,"§1, Ziff. 2.1",,,Generalinstandsetzung B…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 52 FILES
- Gundriss EG.pdf441 KBPDF
- 127_L127_III-27_Erklaerung_Bezug_Russland-1222.pdf156 KBPDF
- eForm_16_22238.pdf2.0 MBPDF
and 45 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.