Published
OGTS Grundschule Schönau-Lstg. der Tragwerksplanung gem.§§49 ff HOAI-LPH 1-6,8
Notice number: 00572984-2026
KEY INFORMATION
- Submission deadline
- • Sep 22, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Gemeinde Tuntenhausen
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 19, 2026
TENDER DESCRIPTION
This tender seeks structural engineering services (Tragwerksplanung) for the extension of the OGTS Primary School Schönau, encompassing service phases 1 through 6 and 8 as per §§ 49 ff HOAI. The project involves constructing an additional building to provide capacity for full-day childcare for up to 100 pupils in 4 groups and lunch for up to 60 participants, emphasizing a solid construction method (Massivbauweise), energy efficiency, natural ventilation where feasible, and integration of a photovoltaic system and modern media technology, with a focus on low-tech building technology standards, durability, and ease of repair. Bidders must demonstrate professional liability insurance of €3.0 million for personal injury and €1.0 million for other damages, along with a minimum average annual net turnover of €0.4 million over three years. Key project milestones include a planning start in February 2027, construction commencement in April 2028, and overall completion by April 2029.
TENDER BRIEF
The contract timeline for the "Erweiterung OGTS Grundschule Schönau" project includes the following key milestones:
- Planning start: February 2027
- Construction start: April 2028
- Completion: April 2029
The documents do not explicitly state a separate overall contract start date, contract end date, or total duration, but these dates outline the project's timeline.What is the contract timeline?
Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.
The contract timeline includes the following key milestones:
- Planning start: February 2027
- Construction start: April 2028
- Completion: April 2029
No explicit overall contract start date, end date, or total duration is provided beyond these project-specific dates.
Sources
- 1Maßnahmenbeschreibung_OGT_Schönau.pdf — “aber mit Abschluss der Leistungsphase 2 und dem Vorliegen der Kostenschätzung im Sinne der DIN 276 festgelegt. g. Termine Das Vorhaben soll in folgendem Terminrahmen verwirklicht werden: Planungsbeginn: Februar 2027 Baub…”
The core scope of work for this tender involves structural engineering services ("Tragwerksplanung") for the extension of the OGTS Primary School Schönau, encompassing service phases 1 through 6 and 8 as per § 49 ff HOAI.
A high-level summary of the Statement of Work and core deliverables includes:
Leistungsphase 1: Grundlagenermittlung (Basic Evaluation)
- Summarizing, explaining, and documenting the results of the initial evaluation to provide a comprehensive overview of the project's fundamentals.
Leistungsphase 2: Vorplanung (Preliminary Planning / Project and Planning Preparation)
- Participation in developing the planning concept and preliminary cost estimation.
- Analysis and coordination of basic information, structural-static consulting, and involvement in preliminary negotiations for approvals with authorities and specialized experts.
- Contribution to cost estimation according to DIN 276-1:2008-12 and schedule planning.
- Summarizing, explaining, and documenting preliminary planning results in a detailed report.
Leistungsphase 3: Entwurfsplanung (Design Planning / System and Integration Planning)
- Development of an approval-ready, structurally and economically sound structural solution, including graphical representations and definition of essential constructive details and main dimensions.
- Preliminary calculation and dimensioning of the structural solution and preliminary quantity determination.
- Contribution to the object description regarding structural aspects and participation in negotiations with authorities and other planning professionals for approval.
- Involvement in cost calculation (DIN 276-1:2008-12), schedule planning, and cost control.
- Summarizing, explaining, and documenting the design planning results.
Leistungsphase 4: Genehmigungsplanung (Approval Planning)
- Preparation of verifiable static calculations for the structure, adhering to building physics requirements and state building regulations.
- Recording normal construction states for engineering structures.
- Preparation of position plans for the structure or entry of all static positions relevant to stability verification.
Leistungsphasen 5, 6, and 8:
- While these phases are explicitly mentioned as part of the scope, specific detailed deliverables for these phases are not provided in the given documents.
Sources
- 1117-04_VgV_Erweiterung+OGTS+Grundschule+Schönau-+Formblätter+-TWP+LHP+1+-+6,+8.xlsx — “netto),netto €,, ,,,, Verhandlungsverfahren - Erweiterung OGTS Grundschule Schönau,,,, ,,,, "Leistungen der Tragwerksplanung gem. § 49 ff HOAI, Leistungsphasen 1 - 6, 8",,,, ,,,, Büro:,,,, Referenz-Nummer:,,ff,, ,,,, Min…”
- 2Anl_2_ZVB_Trag.pdf — “Zusammenfassen und Erläutern und Dokumentieren der Ergebnisse 1.4.1 Zusammenfassen der Ergebnisse aus der Leistungsphase 1 und Übergeben in übersichtlicher geordneter schriftlicher Form. Die Zusammenfassung soll dem Auft…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 10 FILES
- Anl_2_ZVB_Trag.pdf581 KBPDF
- iii-9_erklaerung_der_bewerber-bieter-arbeitsgemeinschaft_0621+(2).docx23 KBDOCX
- Maßnahmenbeschreibung_OGT_Schönau.pdf81 KBPDF
and 3 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.