Optimierung TGA Anlagen
Notice number: 00580453-2026
KEY INFORMATION
- Submission deadline
- • Sep 24, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Amt für Recht, Vergabe und Versicherungen
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 21, 2026
TENDER DESCRIPTION
This tender seeks a qualified contractor for the comprehensive analysis and energetic optimization of Technical Building Equipment (TGA) systems across 30 schools in the City of Cologne over a three-year period, commencing December 1, 2026. The scope includes detailed inventory, visual and functional inspections of TGA systems (KG 410, 420, 430, 480) leveraging existing building automation systems and trend data, analysis and optimization of control loops, and the independent implementation of approved non-investment measures. Further responsibilities involve assessing LoRaWAN sensor retrofits, developing and evaluating optimization strategies for energy savings and payback, soliciting offers for investment measures, and providing thorough evaluation and documentation of implemented measures through regular progress meetings and annual reports. Key technical requirements mandate experience with BACnet Multi-Vendor systems, AMEV Testat AS-B certified BACnet-Automationseinrichtungen (ASE), compatibility with client IT systems, and proficiency in LoRaWAN sensor technology. Bidders must also meet financial standing requirements, including professional/business liability insurance…
TENDER BRIEF
The contract is expected to start on December 1, 2026, and conclude by December 31, 2029. This results in a total duration of three years. The project involves the analysis and energetic optimization of TGA systems in 30 properties, with the work divided into annual phases where 10 schools are analyzed and optimized each year. The initial contract covers properties 1-10 in the first year. The client has the option to request further services for properties 11-20 in the second year and properties 21-30 in the third year. There are specific timeframes for follow-up contract requests, with the cumulative duration of these call-up periods not exceeding 18 months.
Sources
- 1Aufforderung_zum_Teilnahmewettbewerb_Interessensbestaetigung.pdf — “der Leistung: voraussichtlich 01.12.2026 6.2 Vollendung der Leistung: voraussichtlich 31.12.2029 7. Vergabeunterlagen: Vergabeunterlagen können heruntergeladen werden: Vergabeplattform der Stadt Köln 8. Sprache für Teiln…”
- 2260720_AnalyseTGA_10176_HV_VgV.pdf — “und Abwicklung dieses Vertrages Meinungsver- schiedenheiten zwischen den Parteien, so werden sie zunächst versuchen, den Streit auf gütlichem Wege beizulegen. Streitfragen berechtigen die Parteien nur insoweit, ihre Mitw…”
- 3AVB_Anlage 1_und_2_Maerz 2026.pdf — “einer mit einer Nachfristsetzung von mindestens zwei Wochen verbundenen Aufforderung des Auftragnehmers in Textform zur Erklärung über die Anschlussbeauftragung, die dem Auftraggeber nicht früher als zwei Wochen vor Abla…”
The core scope of work for this tender involves the analysis and optimization of Technical Building Equipment (TGA) systems to reduce energy costs in 30 properties over three years, with 10 schools analyzed and optimized each year using existing building automation systems.
The Statement of Work (SOW) is summarized by the following core deliverables and services for each property:
1. Inventory/Condition Assessment (Bestandsaufnahme): Conducting an inventory of the TGA in properties, including the structure and condition of TGA systems within specific cost groups (410, 420, 430, and 480). This includes on-site inspections, coordination with facility staff, and submitting a report with photo documentation to the client.
2. Visual and Functional Inspection (Sicht- und Funktionsprüfung - Analyse TGA): Performing visual and functional checks of all TGA systems in cost groups 410, 420, 430, and 480. This involves using trend data from automation systems for functional testing, creating missing trend data, analyzing trend data for plausibility, and documenting findings in a report.
3. Testing of Automation and Optimization Functions (Prüfung von Automations- und Optimierungsfunktionen - Analyse GA): Reviewing existing automation systems (ASE) to ensure compliance with the City of Cologne's energy guidelines and building automation requirements. This includes verifying the presence and functionality of specified control, regulation strategies, and optimization programs.
4. Short-term Implementation of Non-Investment Measures (Kurzfristige Umsetzung nicht-investiver Maßnahmen): Implementing measures that do not require significant capital investment.
5. Development of Optimization Measures (Erarbeitung von Optimierungsmaßnahmen): Developing optimization measures, evaluating each for energy-saving potential, amortization period, and priority, and documenting these in a report for presentation to the client.
6. Obtaining Offers for Implementation of Proposed Measures (Einholen von Angeboten zur Umsetzung der vorgeschlagenen Maßnahmen): Independently soliciting and reviewing offers for the factual, mathematical, and economic aspects of proposed investment measures.
7. Evaluation and Documentation (Evaluierung und Dokumentation): Evaluating and documenting the success of implemented measures in an annual final report for each property. Regular project progress updates must be provided to the client through in-person meetings at least every two months.
Additionally, a Fee Offer/Contract Draft/Fee Sheet (Stage II) is a required deliverable, which includes a completed contract draft, a priced service description, and a fee summary.
Sources
- 1260720_AnalyseTGA_Anlage 1.pdf — “eigenständig umgesetzt. Zusätzlich prüft der AN die Nachrüstmöglichkeit von LoRaWAN-Temperatursensoren in Heizkreisen ohne Referenzraumtemperaturfühler. Alle Maßnahmen werden je Liegenschaft hinsichtlich Energieeinsparpo…”
- 210176 _Analyse TGA_Honorarblatt.pdf — “Vertragsnummer: Vergabenummer: Projekt: Indikative Honorarermittlung 10176 Analyse und Optimierung von TGA-Anlagen zur Energiekostenreduzierung in 30 Liegenschaften Bieter: Berechnungsgrundlage: Vertragsentwurf, Anlage z…”
- 3260720_AnalyseTGA_10176_HV_VgV.pdf — “Terminen mit den Hausmeister*innen und Objektmanager*innen der jeweiligen Liegenschaft. Die Ergebnisse der Vor-Ort-Begehungen sind der Auftraggeberin in einem Bericht inklusive Fotodokumentation zu übergeben. 2. Sicht- u…”
- 4Leistungsverzeichnis Analyse und Optimierung von TGA Anlagen.pdf — “| Bezeichnung | Mengen- und Preisangaben | Gesamtbetrag netto inkl. | | | Pos.- | | | Nachlass (EUR) 1 | Honorarangebot/ Vertragsentwurf/Honorarblatt (II. Stufe) | Menge: 1 pauschal | | Die Einreichung des Honorarangebot…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 15 FILES
- Leistungsverzeichnis Analyse und Optimierung von TGA Anlagen.pdf10 KBPDF
- AVB_Anlage 1_und_2_Maerz 2026.pdf259 KBPDF
- Auflistung_der_geforderten_Nachweise_und_Erklaerungen_fuer_die_Vergabe_von.rtf88 KBRTF
and 8 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.