Published
Architektur
Notice number: 00527948-2026
KEY INFORMATION
- Submission deadline
- • Sep 9, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Stadt Bergisch Gladbach - Projekt Zanders-Areal
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Jul 30, 2026
TENDER DESCRIPTION
This tender seeks comprehensive architectural services for the conversion of a central workshop into a socio-cultural center, funded under the STEP 2024 measure. The scope encompasses all basic services across Leistungsphasen 1-9 (HOAI 2021, Part 3, Section 1 Buildings and Interiors), along with necessary special and consulting services, including concept development, rigorous cost and schedule control, and integration of funding management processes. Key technical requirements involve the creation of service specifications according to Standardleistungsbuch (StLB) and Standardleistungskatalog (StLK), with all planning and cost determinations, specifically cost calculation and finalization by LPh 8, adhering to DIN 276 and relevant compliance standards. The project timeline includes an award phase concluding by November 2026, a planning period from November 2026 to August 2027, and an execution period from September 2027 to approximately December 2028, with specific deadlines for initial LPhs. Bidders must demonstrate a minimum average annual turnover of €750,000 net over the last three completed years.
TENDER BRIEF
The contract timeline includes a planning period from November 2026 to approximately August 2027, followed by an execution period from September 2027 to approximately December 2028. The award phase is scheduled to conclude by November 2026.
Key milestones and phases for architectural services (Lph) are also detailed:
- Lph 1-2 (Development of Planning Concept/Preliminary Design) is to be completed within 3 weeks after commissioning.
- Lph 3-4 (Draft Planning/Approval Planning) is to be completed within 3 weeks after the conclusion of Lph 2.
- Lph 5-6 (Execution Planning) is to be completed within 6 weeks after the conclusion of Lph 3/4.
- The progression of Lph 7 (Development of award-ready solution), Lph 8 (Object Supervision), and Lph 9 (Object Support) is to be outlined in a separate construction schedule.
The earliest mentioned start for a project phase is November 2026 for planning, and the latest end date mentioned for project execution is approximately December 2028.
Sources
- 1Anlage_8_Rahmenterminplan.xlsx — “Zentralwerkstatt Zanders Rahmenterminplan,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,, Jahr,,2026,,,,,,,,,,2027,,,,,,,,,,,,,,,, Monat,,August,,September,,Oktober,,November,,Dezember,,Januar,,Februar,,März,,Ap…”
- 2Anlage_9_Muster Architektenvertrag.pdf — “3 Fachlich Beteiligte Folgende Leistungen werden von den nachstehend genannten fachlich Beteiligten erbracht und sind vom Auftragnehmer zeitlich und fachlich zu koordinieren, mit seinen Leistungen abzustimmen und in dies…”
The core scope of work for this tender primarily involves the conversion of a central workshop into a socio-cultural center, as part of a funded measure (STEP 2024). The project requires comprehensive architectural planning and supervision across multiple service phases, from initial groundwork to object care and documentation.
Key aspects of the Statement of Work and core deliverables include:
- Concept for Contract Execution: This involves presenting the organizational structure, the general working methods of the bidder's office, and detailing the integration of other planning participants, including information exchange between specialist planners, users, and the client, as well as monitoring content and deadlines.
- Cost and Schedule Planning and Control: Ensuring project costs, managing supplementary claims, coordinating costs with other specialist planners, and ensuring the project schedule, including strategies for handling potential scheduling risks.
- Architectural Services (Leistungsphasen 1-9): The contractor is responsible for providing all basic services within these phases, as well as any special and consulting services necessary to achieve the project's objectives. These phases encompass:
- LPh 1: Grundlagenermittlung (Basic Evaluation): Identifying and compiling necessary planning bases, client requirements, and clarifying service needs.
- LPh 2: Vorplanung (Preliminary Planning): Developing a concrete planning concept, including pre-dimensioning systems and key plant components, establishing functional diagrams, and creating a cost estimate according to DIN 276.
- LPh 3: Entwurfsplanung (Draft Planning): Defining all systems and components, calculating and dimensioning technical systems, providing calculation results to other planners, and preparing a cost calculation according to DIN 276.
- LPh 4: Genehmigungsplanung (Approval Planning): Preparing and compiling documents and evidence for public-law approvals or consents.
- LPh 5: Ausführungsplanung (Execution Planning): Developing detailed execution plans with graphical representations of systems, updating calculations and dimensions, and preparing plans for openings and penetrations.
- LPh 6: Vorbereitung der Vergabe (Preparation for Award).
- LPh 7: Mitwirkung bei der Vergabe (Assistance in Awarding): Full basic services.
- LPh 8: Objektüberwachung (Bauüberwachung) und Dokumentation (Object Supervision (Construction Supervision) and Documentation): Full basic services, including updating execution plans to reflect the as-built condition.
- LPh 9: Objektbetreuung (Object Care): Full basic services, including monitoring defect rectification within the limitation period.
- Integration of Funding Management: All special services across all architectural phases must integrate invoicing management with the requirements and processes of funding management, as the project is funded by STEP 2024.
- Compliance and Standards: Planning must adhere to recognized technical rules, federal and state legal provisions, and the guidelines of North Rhine-Westphalia. Planning documents must clearly present all essential processing bases, steps, and results.
- Cost Estimation: Cost determination (cost calculation by the end of LPh 6 and cost finalization by the end of LPh 8) must be prepared in accordance with DIN 276 and include cost sources such as current offers, nationwide construction prices, and construction price index.
- Supporting Documentation: The project involves comprehensive documentation, including cost planning, building physics, statics, building services, hazardous materials, fire protection, draft planning, a usage and operator concept, economic feasibility study, and statements related to the STEP 2024 funding application for the conversion of the central workshop.
Sources
- 1Angebotsaufforderung VgV 210728.pdf — “1-3) Eigenerklärung Sanktion NRW Liste vorgesehener Nachunternehmerleistungen Sonstige Anlagen: Erklärung zur Haftpflichtversicherung, Referenzen (+ 3x Los 1-3), Honorarangebot (+ 3x Los 1-3), Ausschlusskriterien (+ 3x L…”
- 2260609_Leistungsprofil_Zentralwerkstatt.pdf — “| Vorbereitung der Vergabe | Vollständige Grundleistungen von a) - f): LPH 7 | Mitwirkung bei der Vergabe | Vollständige Grundleistungen von a) - f): LPH 8 | Objektüberwachung (Bauüberwachung) und Dokumentation | Vollstä…”
- 3Anlage_4_Wertungsmatrix_Los1_Architektur.xlsx — “nur oberflächlich beschrieben 30P = Schlüssige Organisationsstruktur; nachvollziehbare Schnittstellen 40P = sehr klare Organisationsstruktur; sehr durchdachte Schnittstellen 50P = hervorragende Organisationsstruktur; pro…”
- 4Anlage_9_Muster Architektenvertrag.pdf — “Landes Nordrhein Westfalen zur Einhaltung des Tariftreue- und Vergabegesetzes Nordrhein-Westfalen (BVB Tariftreue- und Vergabegesetz Nordrhein Westfalen). 1.3 Leistungen des Auftragnehmers Der Auftragnehmer erbringt die…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 80 FILES
- 18_1_5_ZW_Elektroins_UG.pdf626 KBPDF
- 18_1_4_ZW_Decke_OG_DG.pdf305 KBPDF
- 18_1_2_ZW_Schnitte_AA_BB.pdf621 KBPDF
and 73 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.