    Notice number: 00565555-2026

    🇩🇪 GermanyLandeshauptstadt München, BaureferatServices

    KEY INFORMATION

    Submission deadline
    Sep 8, 2026
    Location
    🇩🇪 Germany
    Contracting authority
    Landeshauptstadt München, Baureferat
    Accepted Languages
    German
    Tender type
    Services
    Contract Value
    Published date
    Aug 14, 2026

    TENDER DESCRIPTION

    This tender seeks comprehensive planning services, encompassing HOAI service phases 1-8, for the expansion of the central warehouse at Klärwerk Gut Großlappen in Munich. The core scope includes the design and construction of a warehouse building with a high-bay warehouse and the enclosure of an open area for shelving systems, covering buildings, structural engineering, and technical equipment (excluding electrical engineering). Technical requirements mandate integration into existing VMware vSphere environments, adherence to Windows Server and Linux Debian operating systems, domain integration, stringent IT security protocols including Trendmicro and Greenbone scanning, and the use of client-provided project planning tools, with a general prohibition on remote access and new hardware-based computer systems. The contract is anticipated to run from January 27, 2027, to September 2, 2030, with planning commencing within two weeks of contract conclusion, construction by June 1, 2029, and commissioning 14 months thereafter, incorporating an expected 90-working-day interruption for client internal project approval. Initial commissioning may cover LPH 3-4, with an option for subsequent…

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract Start Date: January 27, 2027
    • Contract End Date: September 2, 2030
    • Total Duration: The period from January 27, 2027, to September 2, 2030, which is approximately 3 years and 7 months.
    • Key Milestones/Phases:
    • Planning start: No later than 2 weeks after contract conclusion.
    • Construction start: June 1, 2029.
    • Commissioning: 14 months after the actual construction start.
    • An interruption of approximately 90 working days for internal project approval by the client is expected after Service Phase 3, if the contractor is commissioned for the second stage.
    • The framework schedule dated June 8, 2026, is applicable.
    • The project involves the following service phases (Leistungsphasen - LPH):
    • LPH 1: Grundlagenermittlung (Basic evaluation)
    • LPH 2: Vorplanung (Preliminary planning)
    • LPH 3: Entwurfsplanung (Draft planning)
    • LPH 4: Genehmigungsplanung (Approval planning)
    • LPH 5: Ausführungsplanung (Implementation planning)
    • LPH 6/7: Ausschreibungen und Vergaben (Tendering and award)
    • LPH 8: Bauausführung inkl. Inbetriebnahme (Construction execution including commissioning)
    • Specific internal approval milestones include:
    • MSE interne Vorprojektgenehmigung (MSE internal pre-project approval) after LPH 2.
    • MSE interne Projektgenehmigung (MSE internal project approval) after LPH 3.

    Sources

    • 1hinweise_1.pdf — “Terminänderung Guten Tag, An der vorliegenden Vergabe wurden Änderungen an den Terminen vorgenommen. aktuelle Termine nach dieser Änderung: • Beginn der Liefer- bzw. Ausführungsfrist: 27.01.2027 • Ende der Liefer- bzw. A…
    • 2eForm_16_24851.pdf — “Beauftragung der LPH 3-4. Dritte Stufe: Beauftragung der LPH 5-8. Ein Rechtsanspruch auf Gesamtbeauftragung besteht nicht. Siehe Vergabe-/Auftragsunterlagen. 5.1.2 Erfüllungsort Stadt: München Postleitzahl: 80939 Land, G…
    • 3eForm_16_24723.pdf — “Beauftragung der LPH 3-4. Dritte Stufe: Beauftragung der LPH 5-8. Ein Rechtsanspruch auf Gesamtbeauftragung besteht nicht. Siehe Vergabe-/Auftragsunterlagen. 5.1.2 Erfüllungsort Stadt: München Postleitzahl: 80939 Land, G…
    • 4eForm_16_23606.pdf — “LPH 3-4. Dritte Stufe: Beauftragung der LPH 5-8. Ein Rechtsanspruch auf Gesamtbeauftragung besteht nicht. Siehe Vergabe-/Auftragsunterlagen. 5.1.2 Erfüllungsort Stadt: München Postleitzahl: 80939 Land, Gliederung (NUTS):…
    • 5HOAI_Vertrag.docx — “Fällen kann die AG den Austausch verlangen. Die/der neue Projektbevollmächtigte ist im Einvernehmen mit der AG zu bestimmen. Die Prüfung des/der neuen Projektbevollmächtigten erfolgt analog zu den im bisherigen Verlauf h…
    • 6Anlage_15_Rahmenterminplan_260608.pdf — “Rahmenterminplan Erweiterung des Zentralagers Stand 08.06.2026 Nr. | Vorgangsname | Q4 2026 Q1 2027 | Q3 2029 Q4 2029 Q1 2030 Q2 2030 Q3 2030 Q2 2027 Q3 2027 Q4 2027 Q1 2028 Q2 2028 Q3 2028 Q4 2028 Q1 2029 Q2 2029 LPH 1…

    The core scope of work for this tender involves planning services for the "Klärwerk Gut Großlappen, Erweiterung des Zentrallagers" (Wastewater Treatment Plant Gut Großlappen, Expansion of the Central Warehouse) in Munich. The project specifically focuses on "Objekt 1 Lagergebäude mit Hochregallager" (Object 1 Warehouse building with high-bay warehouse) and the "Einhausung der Freifläche zw. dem bestehenden Lagergebäude und der Geräteeinstellhalle, inkl Anordnung der Regallager" (enclosure of the open space between the existing warehouse building and the equipment shed, including the arrangement of the shelving systems).

    The Statement of Work (SOW) summarizes the basic services ("Grundleistungen") across various planning phases (Leistungsphasen - LPH) as per HOAI (German fee schedule for architects and engineers), covering both "Gebäude und Innenräume" (buildings and interiors) and "Technische Ausrüstung" (technical equipment).

    Key deliverables and activities include:

    • LPH 1 Grundlagenermittlung (Basic Evaluation): Clarifying the task, conducting site inspections, advising on the overall scope of services, formulating decision aids for other planning participants, and summarizing/documenting results, including coordinating the purpose of the new warehouse building and incorporating concerns from the wastewater treatment plant operations and planning department MSE through a workshop/kick-off meeting, and preparing a risk matrix.
    • LPH 2 Vorplanung (Preliminary Planning): Analyzing basic conditions, coordinating objectives, developing and evaluating three variants for the enclosure of the open space with shelving systems (including drawings at an appropriate scale), clarifying essential connections and conditions, providing work results for other planners, conducting preliminary negotiations for approval, and providing a cost estimate according to DIN 276. For technical equipment, this also includes developing a planning concept with system pre-dimensioning, examining alternative solutions, preparing functional diagrams, clarifying interfaces, and planning the schedule.
    • LPH 3 Entwurfsplanung (Draft Planning): Developing the design, incorporating feedback into an approvable digital design (including overview plans, site plans, views, and sections at specified scales), providing work results for other planners, negotiating approval feasibility, performing cost calculation according to DIN 276 (to at least 3rd level), updating the schedule, and documenting results.
    • LPH 4 Genehmigungsplanung (Approval Planning).
    • LPH 5 Ausführungsplanung (Execution Planning).
    • LPH 6 Vorbereitung der Vergabe (Preparation for Procurement): Determining quantities for service specifications, preparing procurement documents (including service specifications by service area and maintenance services), coordinating interfaces, determining costs based on priced service specifications, cost control, and compiling procurement documents.

    The tender might initially commission LPH 3-4, with an option for LPH 5-8.

    Sources

    • 1Angebotsdokument.xlsx — “,,,,, ,,,,, ,Angebotsdokument zum VgV-F Verfahren,,,, ,,,,, ,"Projekt: Klärwerk Gut Großlappen, Erweiterung des Zentrallagers",Vergabenummer:,MSE-2-40183-2026,, ,,,,, ,Honorarangebot zum Vertrag (die gelb markierten Feld…
    • 2eForm_16_24851.pdf — “Beauftragung der LPH 3-4. Dritte Stufe: Beauftragung der LPH 5-8. Ein Rechtsanspruch auf Gesamtbeauftragung besteht nicht. Siehe Vergabe-/Auftragsunterlagen. 5.1.2 Erfüllungsort Stadt: München Postleitzahl: 80939 Land, G…
    • 3eForm_16_24723.pdf — “Beauftragung der LPH 3-4. Dritte Stufe: Beauftragung der LPH 5-8. Ein Rechtsanspruch auf Gesamtbeauftragung besteht nicht. Siehe Vergabe-/Auftragsunterlagen. 5.1.2 Erfüllungsort Stadt: München Postleitzahl: 80939 Land, G…
    • 4Anlage_2_Leistungsbild_Gebäude und Innenräume_Grundleistungen_Objekt 1.pdf — “der Zielvorstellungen, Hinweisen auf Zielkonflikte c) Erarbeiten der Vorplanung, Untersuchen, Darstellen und Bewerten von Varianten nach gleichen Anforderungen, Zeichnungen im Maßstab nach Art und Größe des Objekts Erläu…
    • 5Anlage_4_Leistungsbild_Technische_Ausruestung_Grundleistungen.pdf — “genehmigungsfähig sein. zu c) Zusammenstellung aller relevanten Unterlagen und schriftliche Zusammenfassung der Ergebnisse mit ausführlichen Begründungen zu den Ergebnissen. Hilfreich sind Musterschreiben und Erläuterung…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 60 FILES

    • Anlage_20_Lageplan_KLW1.pdf
    • Anlage_5_Leistungsbild_Ingenieurbauwerke_Grundleistungen_Objekt 2.pdf
    • TS_HLK_6_Redundanzen.pdf

    and 53 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders