    PO_PK 2x 32 MWt, Poříčí

    Notice number: 00532528-2026

    🇨🇿 CzechiaČEZ Teplárenská, a.s.Works

    KEY INFORMATION

    Submission deadline
    Sep 8, 2026
    Location
    🇨🇿 Czechia
    Contracting authority
    ČEZ Teplárenská, a.s.
    Accepted Languages
    Czech
    Tender type
    Works
    Contract Value
    Published date
    Jul 31, 2026

    TENDER DESCRIPTION

    This tender seeks a comprehensive solution for the PO_PK 2x 32 MWt Poříčí project, encompassing the full lifecycle from the preparation of detailed project documentation, including Basic and Realization Designs, specialized studies (HAZOP, SIL), and 3D models, through to the execution of all construction works, assembly, and commissioning of a new 2x32MWt steam gas boiler source. The scope further includes specific construction objects such as a chimney, relocation of existing networks, a gas metering station, and an industrial gas pipeline, along with site management, quality assurance, coordination, testing, and post-completion tasks, all while adhering to stringent technical requirements like secure software development practices, vibration standards for rotating machinery, and specific environmental conditions for equipment placement. The project timeline is milestone-driven, starting with contract conclusion and progressing through detailed design submissions and site handover to final acceptance, with suppliers required to demonstrate an annual turnover of at least CZK 100,000,000 for each of the last three closed accounting periods.

    TENDER BRIEF

    Question: What is the contract timeline?

    Context: Contract start date, end date, total duration, and any key milestones or phases mentioned. Return null if not stated.

    The contract start date is defined by Milestone M0, which is the "Uzavření této Smlouvy" (Conclusion of this Agreement), with the deadline stated as "Dle skutečnosti" (According to reality), implying the actual signing date.

    The contract end is marked by "Konečné převzetí Díla (FAC)" (Final Acceptance of the Work), which is scheduled for "+1 den od splnění milníku M29" (+1 day from the fulfillment of milestone M29).

    The total duration of the contract is not explicitly stated as a fixed number of days, months, or years. However, the Detailed Time Schedule of the Work (Příloha 5) must cover the period from the signing of the Contract (M0) to the Final Acceptance of the Work (FAC).

    Key milestones and their relative deadlines are as follows:

    • M0: Uzavření této Smlouvy (Conclusion of this Agreement) - Dle skutečnosti (According to reality).
    • M1: Předání dokladu pro pojištění a Dozor projektanta - +30 dnů od splnění milníku M0.
    • M2: Zpracování a předání Plánu kvality - This milestone must be fulfilled after M1 and before M3.
    • M3: Zpracování a předání Projektové dokumentace pro provádění stavby - +140 dnů od splnění milníku M0.
    • M4: Zpracování a předání Realizační dokumentace (Detail Design), schváleného plánu kontrol a zkoušek, a schváleného podrobného časového harmonogramu provedení Díla - +140 dnů od splnění milníku M0.
    • M5: Zpracování a předání schválené studie HAZOP - This milestone must be fulfilled after M3 and M4, and within +60 days of M3 and M4.
    • M6: Zpracování a předání schválené studie SIL - This milestone must be fulfilled after M3 and M4, and within +60 days of M3 and M4.
    • M7: Neobsazeno (Not occupied).
    • M8: Předání a převzetí Staveniště (Site handover) - +10 dnů od splnění milníku M4.
    • M9: Dodávka a usazení plynových parních kotlů na pozici - This milestone must be fulfilled after M8.
    • M10: Zpracování a předání schválené dokumentace programů zkoušek a uvádění do provozu - +270 dnů od splnění milníku M8.
    • M11: Zpracování a předání schváleného Předpisu pro provoz zařízení - +270 dnů od splnění milníku M8.
    • M12: Zpracování a předání schváleného Předpisu pro údržbu zařízení - +270 dnů od splnění milníku M8.
    • M13: Ukončení stavebních prací, dodávek a montážních prací a úspěšné provedení individuálních zkoušek - +300 dnů od splnění milníku M8.
    • M14: Zpracování a předání kompletní dokumentace pro seznámení personálu Objednatele s obsluhou.
    • M29: This milestone precedes the Final Acceptance of the Work.
    • Konečné převzetí Díla (FAC): Final Acceptance of the Work - +1 den od splnění milníku M29.

    Some milestones (M2, M5, M6, M9) require the participant to fill in the specific date, while ensuring they are met after certain preceding milestones and within certain timeframes. The milestones M14 to M17 and M23 to M26 can be fulfilled in a different order within their respective groups.

    Sources

    • 1ZD_část 4_Návrh Smlouvy.docx — “plnění Díla je elektrárna Poříčí, Kladská 466, 541 03 Trutnov (dále jen jako EPO). Zhotovitel se zavazuje Dílo plnit postupně po jednotlivých milnících ve lhůtách uvedených níže, které počínají plynout od milníku M0, kte…
    • 2ZD_část 4_Příloha_05_Podrobný časový harmonogram provedení Díla.docx — “ZADÁVACÍ DOKUMENTACE JEDNACÍ ŘÍZENÍ S UVEŘEJNĚNÍM „PO_PK 2x 32 MWt, Poříčí“ ČÁST 4 návrh smlouvy Příloha 5 Podrobný časový harmonogram provedení Díla Příloha 5 Podrobný časový harmonogram provedení Díla „PO_PK 2x 32 MWt,…

    The core scope of work for this tender involves a comprehensive range of activities, from detailed design and documentation to construction, commissioning, and post-completion tasks.

    High-level Summary of the Statement of Work and Core Deliverables:

    The work primarily entails the processing of extensive documentation, including:

    • Basic Design (BD) documentation: This covers general, electrical, control system, civil, and technological aspects. It focuses on coordinating connections, interface points, and related professions, establishing media flow and parameters, chemical parameters, layout solutions, and defining key equipment and systems, including KKS codes. It also includes a detailed timeline for construction coordination.
    • Realization Documentation (Detail Design - DD): This provides highly detailed information for construction control, covering general, electrical, control system, civil, technological, and taxonomy elements. It serves as the definitive basis for procuring components and for manufacturing and assembly documentation.
    • Specialized Studies and Projects: This includes HAZOP and SIL studies, a project for guarantee tests (PrGT), a project for cleaning operations after assembly (PCO), and a project for pressure, tightness, and strength tests (TPZ).
    • Operational and Regulatory Documentation: This encompasses construction passports, documentation for the removal of structures (DOS), and documentation for changes to the structure before completion (ZSPD).
    • 3D Documentation.

    Beyond documentation, the work includes:

    • Construction and Installation: This involves the execution of the work, its assembly, and commissioning.
    • Specific Construction Objects:
    • SO 02 Komín PK: Architectural and structural design, foundation solutions, and chimney descriptions and drawings.
    • SO 09 Přeložky stávajících sítí: Relocation of existing networks that conflict with the work, ensuring new routes maintain or improve existing network parameters.
    • SO 10 Předávací stanice plynu: Placement of technology for measuring natural gas supplied to the new gas boiler house (SO 01) PK 2x32 MWt.
    • SO 11 Průmyslový plynovod: Realization of a medium-pressure gas pipeline from NB05 to gas boilers, including all necessary equipment, ensuring 100% tightness and minimal leaks, in compliance with relevant norms and regulations.
    • Site Management: This covers the establishment and operation of the construction site and facilities.
    • Quality and Project Management: This includes developing a project management plan (PMP) and comprehensive documentation for ensuring and managing the quality of the work (QA-QC), such as quality plans, inspection and test programs, and revision rules.
    • Coordination and Control: Coordinating the work with its surroundings and other ongoing projects, along with quality control of works and supplies during the project.
    • Testing and Handover: Performing guarantee measurements and familiarizing the client's personnel with the equipment.
    • Post-Completion Tasks: Operation, maintenance, and repairs of the completed work, and documenting its final execution and state.
    • Waste Management: Liquidation of all waste generated during the work in accordance with regulations and client requirements, and cleaning of the construction site.
    • Legal and Intellectual Property: Obtaining necessary intellectual property rights and providing them to the client.
    • Supervision: Performing author's supervision/designer's supervision.

    Sources

    • 1ZD_část 4_Příloha_04_Požadavky na dokumentaci.docx — “kvality a plán kontrol a zkoušek dodávek technických zařízení DOKE, uvedené v Příloze 2.18 Přílohy 1 Smlouvy, seznam požárně bezpečnostních zařízení, protokol o určení vnějších vlivů, geodetické doměření řešeného prostor…
    • 2ZD_část 4_Příloha_02_Technická specifikace Zhotovitele.docx — “splnění požadavků Objednatele | Číslo dokumentu 1. | Výkresy SO Půdorysy včetně osazené technologie Základní řez pro daný půdorys včetně návaznosti na okolní terén nebo objekt(y) | | | 2. | Grafické znázornění (dispozičn…
    • 3ZD_část 4_Příloha_01_Technická specifikace Objednatele.docx — “vody, NB32-PV připojovací místo parovodu a nové rozvodny elektro na blocích BM. SO 09 Přeložky stávajících sítí Řešení veškerých přeložek stávajících sítí, musí být zhotovitelem před jejich realizací projednána s Objedna…
    • 4ZD_část 4_Návrh Smlouvy.docx — “v rozsahu stanoveném v této Smlouvě, odstranění vad Díla, provedení případných změn Díla vyplývajících z pravomocných rozhodnutí orgánů státní správy ve veřejnoprávních řízeních, včetně kolaudace, v souladu s právními př…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 33 FILES

    • ZD_část 3_Příloha 4_ČP mezinárodní sankce vůči Rusku a Bělorusku.docx
    • ZD_část 4_Příloha_11_Vzor záruky za provedení Díla.docx
    • ZD_část 4_Příloha_16_Seznam zkratek.docx

    and 26 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders