Podpora KVET SZT Ostrava – KGJ OZO
Notice number: 00523475-2026
KEY INFORMATION
- Submission deadline
- • Sep 7, 2026
- Location
- 🇨🇿 Czechia
- Contracting authority
- Veolia Průmyslové služby ČR, a.s.
- Accepted Languages
- Czech
- Tender type
- Works
- Contract Value
- Published date
- Jul 29, 2026
TENDER DESCRIPTION
This tender, operating under a design and build model for "Support for CHP SZT Ostrava – KGJ OZO," encompasses the comprehensive execution of work including technical specifications, project documentation, construction planning, site equipment provision, and a geodetic survey, alongside adherence to strict quality requirements for welding and Non-Destructive Testing. The scope further mandates ongoing maintenance services, specifically planned maintenance and urgent KGJ repairs to be completed within 48 hours. Key technical requirements include the prohibition of native RDP, software blocking of USB mass storage devices, specific Windows OS versions for stations and servers, preference for open-source database systems, and PLC-based control systems compatible with existing Profibus DP and Profinet standards. Suppliers must demonstrate a minimum annual turnover of 95,000,000 CZK for each of the three preceding accounting periods, with the entire project to be completed no later than 360 calendar days from the contract's effective date, including milestones such as construction documentation within 90 days.
TENDER BRIEF
The contract timeline specifies a total duration for the work to be completed no later than 360 calendar days from the effective date of the contract.
Key milestones with associated deadlines from the effective date of the contract include:
- Milestone 1: Documentation for construction is due within 90 days.
- Milestone 2: Delivery of 2 KGJ units to the construction site, with the specific term to be provided by the supplier (indicated as "xx days").
- Milestone 3: Completion of assembly and start of testing, with the specific term to be provided by the supplier (indicated as "xx days").
- A final milestone for the completion of work and handover to the client is also mentioned in the payment schedule.
The expected date for signing the contract with the selected supplier is between August and September 2026, though this date may be subject to change depending on the course of the tender procedure.
The stated terms for completion, including milestones, can be extended under certain conditions, such as obstacles caused by the client, additional work, legislative changes, or unfavorable climatic conditions.
Sources
- 1Návrh SoD_KGJ_OZO.docx — “produktů faktoringové společnosti/banky, zejména pak úhradu závazků Zhotoviteli formou Směnky. Tento postup úhrady nebude mít vliv na termíny splatnosti faktur Zhotovitele dle Harmonogramu plateb ani na další aspekty dod…”
- 2P04_HMG plateb_KGJ.xlsx — “"„Podpora KVET SZT Ostrava – KGJ OZO“, SoD č. 2623-0002-09A",,,,,,,,,, Příloha č. 4 - Harmonogram plateb (v Kč),,,,,,,,,, ,,,,,,,,,, P.č.,"Způsob platby",Předmět dílčího plnění,Termín dokončení dílčí části díla,Fakturova…”
- 3Zadavaci dokumentace.pdf — “dokumentaci). Časový plán výstavby včetně jednotlivých milníků bude přílohou č.3 Návrhu smlouvy o dílo. Předpokládaný termín podpisu smlouvy s vybraným dodavatelem je 08-09/2026 (termín podpisu smlouvy může být posunut v…”
- Prohibition of native RDP (Remote Desktop Protocol).
- Software blocking of USB ports in "mass storage device" mode for "normal users".
- All stations will use OS Windows 11.
- For technological devices, Windows 10 Enterprise 2021 LTSC is preferred.
- For technological devices, Windows 11 Enterprise 2024 LTSC is preferred.
- Server OS Windows Server 2022.
- Server OS Windows Server 2025.
- Open source database systems are preferred.
- MS SQL and Oracle database systems are not preferred due to licensing reasons.
- Updates for Windows OS and other Microsoft software will be performed via WSUS.
- Control system based on PLC, compatible with existing control systems at Veolia Průmyslové služby ČR.
- Communication between controllers must be compatible with existing systems on Profibus DP standard.
- Communication between controllers must be compatible with existing systems on Profinet standard.
Sources
- 1TZ_P04_Požadavky na KyB - 2026_v2.pdf — “stanici (Workstation), je požadováno zakázání nativního RDP V podmínkách terminálů Veolia je požadováno zejména SW blokování portů USB v režimu „mass storage device“ pro „běžné uživatele“ – tj. v závislosti na úrovni při…”
- 2Pravidla chování třetích stran - kybernetická bezpečnost ICS systémů - 2026_v2_Veolia.pdf — “stanici (Workstation), je požadováno zakázání nativního RDP V podmínkách terminálů Veolia je požadováno zejména SW blokování portů USB v režimu „mass storage device“ pro „běžné uživatele“ – tj. v závislosti na úrovni při…”
- 3TZ_P02_Základní standardy MaR ve společnosti VPS r04.pdf — “místem odkud a kam kabel vede. • Při montáži žlabů pro kabelové trasy bude montáž provedena dle montážních postupů uvádějícím výrobcem, použito originální dílů a příslušenství jak je uvedeno v daném katalogu daného typu.…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 147 FILES
- zapis k PMP_01-07-2026_profil.pdf326 KBPDF
- 60-24C-1B_r2_260323.pdf698 KBPDF
- 2480-OZO-02-KOO.pdf1.6 MBPDF
and 140 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.