Präqualifikationsverfahren für Großbatteriespeicher
Notice number: 00597259-2026
KEY INFORMATION
- Submission deadline
- • Sep 24, 2026
- Location
- 🇩🇪 Germany
- Contracting authority
- Thüga Aktiengesellschaft
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Aug 31, 2026
TENDER DESCRIPTION
This prequalification procedure seeks qualified contractors for the comprehensive execution of utility-scale battery storage projects, encompassing full project development to a ready-to-build stage, Engineering, Procurement, and Construction (EPC) for turnkey implementation, and subsequent operation and maintenance with specified performance guarantees. Key technical requirements include adherence to state-of-the-art technology, valid technical guidelines (DIN, VDE/VDI, EEG standards), and secure software development methodologies with market-standard communication protocols (e.g., IEC 60870-5-104, IEC 61850, OpenADR) for seamless grid and market integration. Financial standing requirements mandate a minimum average annual turnover exceeding 1 million Euros in the BESS sector, along with a satisfactory creditworthiness report (Creditreform-Bonitätsindex of ≤332 or equivalent) no older than six months. While the qualification system has an unlimited validity period, the initial deadline for submitting pre-qualification applications is September 24, 2026, 12:00 PM, with further applications accepted on an ongoing basis.
TENDER BRIEF
The documents provide a timeline for the pre-qualification process, but not for a specific contract. The validity of the qualification system is unlimited.
Pre-qualification process timeline:
- August 28, 2026: Dispatch of the EU announcement regarding the qualification system.
- September 14, 2026: End of the deadline for applicant questions (first round of admissions).
- September 24, 2026, 12:00 PM: End of the deadline for submitting pre-qualification applications (first round of admissions).
- Approximately October 09, 2026: Examination and evaluation of pre-qualification applications.
- Approximately October 09, 2026: Notification of admission to the qualification system.
- Ongoing: Further applications can be submitted at any time (continuous qualification during the system's runtime).
- From announcement: The qualification system has an unlimited validity period.
The documents do not explicitly state the contract start date, end date, total duration, or any key milestones/phases for the specific EPC contract.
Sources
- 1Verfahrensbrief_PQ_BESS_Thuega.pdf — “Zeitplan für das Präqualifikationsverfahren vor. Die Fristen für die Bewerber entsprechen den gesetzlichen Vorgaben der SektVO. Anträge auf Aufnahme in das Qualifizierungssystem können auch nach der ersten Aufnahmerunde…”
The core scope of work for this tender involves the comprehensive development, construction, and ongoing operation and maintenance of Battery Energy Storage Systems (BESS).
The Statement of Work (SOW) summary and core deliverables can be broken down into three main phases:
1. Project Development (Ready-to-Build):
- Concept Development: Developing the overall concept for establishing a BESS, which can be stand-alone or co-located with photovoltaic or wind energy systems.
- Permits and Rights Acquisition: Obtaining all necessary permits, contracts, expert opinions, other required documents, and services, as well as securing all rights for the construction and operation of the BESS. The contractor is responsible for all associated costs.
- Land Identification and Securing: Identifying and securing suitable land for the project.
- Stakeholder Engagement: Contacting municipalities and authorities, and concluding usage, permission, and lease agreements for essential infrastructure such as access roads, cable routes, substations, and compensation areas.
- Building Rights and Applications: Obtaining building rights through preliminary building applications, reviewing privileging under § 35 BauGB, or establishing/amending a development plan. This includes obtaining all necessary permits and expert opinions, and the complete submission of the building application with detailed documentation (e.g., building description, plans, static proof, fire protection, noise protection, handling of hazardous substances, soil reports, and proof of land security).
- Network Connection: Initiating and securing a network connection reservation.
- Component Selection (Partial): The contractor selects all components and manufacturers, though purchase contracts for the main battery storage system manufacturers are negotiated by the contractor but finalized between the manufacturer and the client.
2. EPC Services (Engineering, Procurement, Construction):
- Turnkey Implementation: Planning, delivery, construction, testing, and commissioning of the BESS on a turnkey basis.
- Project Management: Comprehensive project management, including regular reporting, coordination of project participants, and creation of a Project Management Plan (PMP) encompassing personnel, planning, execution, commissioning, testing, procurement, HSE, transport, storage, assembly, and interface management.
- Detailed Planning: Execution and revision planning, and site planning (preparation, access, security, utility connections, working hours, safety, and communication with local authorities).
- Site Works: Site setup, civil engineering, site clearing, and disposal of construction debris. Restoration of damaged off-site roads and infrastructure, and landscaping of affected areas.
- Component Delivery and Assembly: Delivery and assembly of all main components, including battery containers, inverters, transformers/MV skids, and transfer stations.
- Infrastructure Installation: Installation of park-internal low and medium voltage lines, lightning and surge protection, grounding, and potential equalization.
- Control and Monitoring: Implementation of remote monitoring and control technology.
- Market Integration: Ensuring the BESS can be marketed in relevant energy and control power markets (e.g., EPEXSPOT for Day-Ahead, Intraday auctions, Intraday continuous; FCR; aFRR), fulfilling all technical requirements, and providing a control interface.
- Grid Services: Enabling the BESS for grid-serving purposes such as peak shaving and ensuring reactive power provision for voltage stabilization.
- Optional Functions: Offering optional functions like black start capability and synthetic inertia ("Inertia-ready").
- Documentation: Providing complete project documentation.
3. Operation and Maintenance (O&M):
- Maintenance Services: Performing preventive and corrective maintenance of the storage system.
- System Operation: Operating the remote monitoring and control technology.
- On-site and Remote Support: Conducting all other necessary on-site and remote work for smooth operation.
- Performance Guarantees: Guaranteeing a minimum storage availability of 97% and adherence to defined reaction and troubleshooting times.
Sources
- 1LB_Projektentwicklung_PQ_BESS_Thuega.pdf — “der Auftragnehmer lediglich bis zum Mittelspannungsanschluss an die Photovoltaik- oder Windenergieanlage. Seite 2 von 10 Anlage X - Leistungsbeschreibung - Projektentwicklung BESS Dokumentenversion: v1.0 Datum: XXXX-XX-X…”
- 2Verfahrensbrief_PQ_BESS_Thuega.pdf — “der Technik sowie den geltenden gesetzlichen und behördlichen Vorgaben zu planen und auszuführen. Projektentwicklung (Ready-to-Build): Umfasst die Entwicklung von Stand-Alone- und Co-Location- Projekten bis zum Status „R…”
- 3LB_EPC_PQ_BESS_Thuega.pdf — “koordiniert das Projektteam und erstattet dem Auftraggeber regelmäßig Bericht. Der Projektleiter bildet die Schnittstelle zwischen Auftraggeber und Auftragnehmer. Der Projektleiter muss die deutsche Sprache mündlich und…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 8 FILES
- Eigenerklärung_Russland-Sanktionen_de.pdf159 KBPDF
- Thüga - IS-Richtlinie.pdf132 KBPDF
- LB_O&M_PQ_BESS_Thuega.pdf351 KBPDF
and 1 other document
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.