Published

    Un lot unique

    Notice number: 00539961-2026

    🇫🇷 FranceCMAR Auvergne Rhône AlpesServices

    KEY INFORMATION

    Submission deadline
    Sep 18, 2026
    Location
    🇫🇷 France
    Contracting authority
    CMAR Auvergne Rhône Alpes
    Accepted Languages
    French
    Tender type
    Services
    Contract Value
    Published date
    Aug 4, 2026

    TENDER DESCRIPTION

    This tender seeks a comprehensive professional travel management solution for CMAR AURA, encompassing the provision and setup of an Online Booking Platform (OBT) and mobile application, extensive 24/7 traveler assistance, customer service, and ongoing support for travel within France, Europe, and beyond the EU. The required solution must be a SaaS platform, accessible via modern web browsers, compatible with Windows 11 and Microsoft Edge, with data hosted exclusively within the European Union, justified by ISO 27001 or equivalent security certification, and maintaining a minimum service availability of 99.5%. Technical specifications include SSO (SAML compatible), REST APIs, JSON/XML/CSV data formats, integration with Microsoft 365 tools, and compliance with RGAA/WCAG accessibility rules. The contract has an initial duration of twelve months, tacitly renewable up to three times for additional twelve-month periods, with the overall booking portal deployment, including configuration and training, not exceeding two months from the contract notification date. Bidders must provide declarations concerning global turnover and turnover related to the services for the last three financial…

    TENDER BRIEF

    The contract is concluded for an initial duration of twelve (12) months, effective from its date of notification. It is tacitly renewable a maximum of three (03) times for additional periods of twelve (12) months each. The provisional start date for the execution of services is scheduled at the time of contract notification.

    Key milestones include:

    • The overall deployment of the booking portal, encompassing the launch meeting, configuration workshops, implementation, testing, and staff training, must not exceed two (2) months for the online tool configuration, starting from the contract notification date.
    • Within ten (10) working days, the contractor is required to provide all necessary information for collecting, structuring, and preparing the data essential for the configuration and implementation of the booking portal.
    • A progress plan will be jointly established on the anniversary date of the contract notification, with the contractor initiating the process by presenting improvement proposals based on feedback from the first year of service execution.

    Sources

    • 1Acte d'engagement.docx — “date de notification du marché. Le présent contrat est conclu pour une durée de 12 mois à compter de sa date de notification. Le contrat est ensuite reconductible tacitement trois (03) fois maximum par période de 12 mois…
    • 2Règlement de consultation.pdf — “effet de mettre fin à l'accord-cadre. 1.4. Durée Le contrat est conclu pour une durée de douze (12) mois à compter de la date de notification. Le contrat est ensuite reconductible tacitement trois (03) fois maximum par p…
    • 3CCAP.pdf — “service de messagerie de l'expéditeur suffira à prouver la date d'envoi. Par dérogation à l'article 3.1.2. du CCAG, concernant la notification effectuée par le biais du profil d'acheteur, les parties sont réputées avoir…
    • 4CCTP_Dossier technique opérationnel.pdf — “de la politique voyage et leurs impacts sur les circuits de validation, notamment en termes de seuils, de règles conditionnelles et de niveaux de validation. À titre de bonne pratique, il est apprécié que la solution int…

    The core scope of work and statement of work for this tender primarily revolve around professional travel management and related services for CMAR AURA. Key deliverables and activities include:

    1. Professional Travel Management: This involves various interventions for travel, including night, weekend, or holiday services, and comprehensive traveler assistance such as 24/7 access to assistance, VIP service, reorganization of interrupted or delayed trips, and support during cancellations (transport, accommodation), strikes, or exceptional crisis events.

    2. Online Booking Platform (OBT): Provision and setup of an online booking platform and a mobile application (if applicable). This includes licensing, initial parameterization of profiles, creation, modification, and deletion of traveler profiles, configuration of validation circuits and travel policies, and ongoing corrective and evolutionary maintenance.

    3. Customer Service and User Support: Management of user calls and contacts, including inbound traveler calls, outbound advisor calls, processing requests via email and the online platform, and providing assistance for the online platform. The contractor must describe their organization for processing user requests, including opening hours, contact channels, response times, quality of service commitments (SLA), and 24/7 assistance. They also need to detail procedures for managing exceptional situations like last-minute cancellations and delays.

    4. Technical Integration, Interoperability, and Security:

    • Single Sign-On (SSO): Implementation of standard SSO, including configuration of SAML 2.0 and Oauth 2.0/OpenID Connect protocols, parameterization of user access rules, automatic management of account creation, updates, and deactivation, and synchronization with enterprise directories (e.g., Microsoft Entra ID).
    • API Implementation: Provision of existing standard APIs, parameterization of standard APIs, specific API development, and evolutionary maintenance and adaptation of APIs due to regulatory or technical changes.
    • Multi-Factor Authentication (MFA): Implementation of MFA mechanisms for external accounts (e.g., elected officials), management of available MFA methods (mobile application, SMS, physical key), configuration of MFA security policies, user assistance, and access reset.

    5. Reversibility and Migration: This includes the export of data at the end of the contract and complete reversibility, which may encompass migration to another service provider. Supplementary hosting may also be a component.

    6. Project Deployment and Change Management: Description of project phases, a provisional deployment calendar, platform parameterization operations, technical prerequisites, and data recovery modalities. Additionally, actions for user adoption, such as training (for managers and travelers), support materials, online tutorials or resources, and post-deployment support, are required.

    7. Pilotage, Reporting, and Continuous Improvement: Provision of monitoring tools, detailing the frequency of follow-up meetings, proposed indicators, available dashboards, and communication modalities with the buyer. The contractor is also expected to present observed results for quality indicators (e.g., 80% user satisfaction rate) during semi-annual account reviews and propose improvement plans if quality levels are not met. There is a commitment to continuous improvement with a progress plan developed jointly at the contract anniversary.

    The services are to be provided for all CMAR AURA sites in the Auvergne-Rhône-Alpes region, covering travel destinations within France, Europe, and outside the EU, with the contractor having an obligation of result.

    Sources

    • 1BPU_Marché déplacements professionnels V2.xlsx — “nuit,Intervention,,,,,, 4.4,Intervention week-end ou jour férié,Intervention,,,,,, ,,,,,,,, ,,,5. Assistance voyageurs,,,,, N°,Désignation,Unité,Prix unitaire HT (en €),TVA,Prix unitaire TTC (en €),,, 5.1,Accès au servic…
    • 2CADRE DE MEMOIRE TECHNIQUE OPERATIONNEL MARCHE DEPLACEMENT PRO.docx — “de votre solution auprès de l'acheteur. Précisez notamment : les différentes phases du projet ; le calendrier prévisionnel de déploiement ; les opérations de paramétrage de la plateforme ; les prérequis techniques éventu…
    • 3CCTP_Dossier technique opérationnel.pdf — “ou vouchers | Demande classique: 5 h Demande multi prestation: 12 h ouvrés Demande urgente: 1 h Taux de satisfaction des utilisateurs / Enquête qualité | 80% Lors de chaque revue de compte semestrielle, le titulaire prés…
    • 4CCAP.pdf — “15 EXECUTION DES PRESTATIONS 15.1-ССТР Toutes les mesures seront prises par le titulaire de l'accord cadre pour répondre à la réglementation et aux normes en vigueur dans l'exécution des prestations notamment en matière…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 11 FILES

    • CADRE DE MEMOIRE TECHNIQUE SECURITE INFORMATIQUEV2.docx
    • Questions réponses.pdf
    • Acte d'engagement.docx

    and 4 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders