Published

    Prestations de maintenance, conception, realisation et support d’applications en technologie .Net

    Notice number: 26-71946

    🇫🇷 FranceAMFServices

    KEY INFORMATION

    Submission deadline
    Sep 16, 2026
    Location
    🇫🇷 France
    Contracting authority
    AMF
    Accepted Languages
    FRA
    Tender type
    Services
    Contract Value
    Published date
    Jul 21, 2026

    TENDER DESCRIPTION

    This tender seeks comprehensive maintenance, design, development, and support services for applications utilizing .NET technologies, encompassing custom development, corrective and operational maintenance, and a range of unitary services including project management, functional and technical design, implementation, testing, and deployment. Key technical requirements mandate expertise in .NET, Webmethods Integration Server 10.5, SSIS 2014 SP2, Kafka 1.1.0, and adherence to Object-Oriented Programming principles, code refactoring, layered architecture, and the use of services, microservices, or APIs. The architecture must be adaptable for server-mode deployment and compatible with future containerization, with AMF validation required for architectural designs and component usage. Financial standing requirements include declarations of global and relevant annual turnover for the past three years, along with appropriate bank declarations or professional risk insurance. The contract is established for a firm duration of two years, with the possibility of two one-year tacit renewals, extending the maximum term to four years, segmented into Initialization, Nominal, and Reversibility…

    TENDER BRIEF

    The contract is concluded for a firm duration of 2 years, starting from its notification date to the holder. It can be tacitly renewed twice, each for a period of 1 year, making the total maximum duration of the framework agreement 4 years.

    The contract timeline includes three main phases:

    • Phase d’initialisation (Initialization Phase): This phase begins at T0, which is the start date of services, and concludes at T1 (T0 plus a duration to be specified).
    • Phase nominale (Nominal Phase): This phase starts at T1 and continues until the trigger date of the reversibility phase or the end date of the framework agreement.
    • Phase de réversibilité (Reversibility Phase): This phase is triggered by the AMF at T2 and ends at T2 plus a duration to be specified.

    Sources

    • 12026_025_AMF_RC.pdf — “article ne sont pas rédigés en langue française, ces documents devront être accompagnés d'une traduction en français. 4. DUREE DE L'ACCORD-CADRE 4.1 DUREE DE L'ACCORD-CADRE L'accord-cadre est conclu pour une durée ferme…
    • 22026_025_AMF_CCAP.pdf — “à l'issue de la phase d'initialisation (cf. BP << forfaitaire »). Les autres unités d'œuvre feront l'objet de bon(s) de commande (complexité/durée) (Cf. BP unitaire). 4.3. ELEMENTS FINANCIERS Le présent accord-cadre est…
    • 32026_025_AMF_CR_Nom de l'entreprise ou du groupement.docx — “permettre au candidat de mettre en avant son expertise sur les technologies cibles du présent accord-cadre: Macro planning Le candidat présentera une synthèse des principaux jalons clés du macro planning de l’accord-cadr…

    The core scope of work for this tender involves maintenance, design, development, and support services for applications utilizing .NET technologies.

    The statement of work summary and core deliverables include:

    • Maintenance Services:
    • Corrective and operational maintenance over six-month periods, with varying capacities.
    • Initialisation and reversibility services for maintenance operations.
    • Assistance during the Validation of Regular Service (VSR) phase, including incident resolution, anomaly correction, re-deliveries, and installation support.
    • Specific deliverables during VSR, such as inventory, tests, and monitoring of anomaly and incident resolution.
    • A reversibility service to transition to a new team over a one-month period.
    • Unitary Services (UO):
    • Project Management: Project steering and management tools (UO1).
    • Design: Functional and technical design at simple, medium, and complex levels (UO2-1, UO2-2, UO2-3).
    • Development/Implementation: Realization at simple, medium, and complex levels (UO3-1, UO3-2, UO3-3).
    • Testing: Test execution services (UO4-1).
    • Support: VSR support services (UO4-2), and assistance and support during working and non-working hours (UO5-1-2, UO5-1-3).
    • Consulting: Audit or expertise services (UO5-1-1).
    • Deployment: Deployment and preparation for production cutover services (UO5-2).
    • Documentation and Deliverables:
    • All documentary deliverables must be provided in electronic format, adhere to AMF's graphic charter and templates, be written in French, and be in Microsoft Office XML formats (.docx, .pptx, .xlsx, etc.).
    • The contractor is responsible for the update, version management, storage, and archiving of all documentation, which becomes the property of AMF upon receipt.
    • Depending on the contract context, specific documents required include: a description of the service's context and challenges, a list of functional components, external functional elements, logical functional diagrams, technical architecture diagrams, environment descriptions, base descriptions (if not AMF-hosted), lists of machines (if developed for AMF), URLs, privilege levels, exploited data, and functions manipulating data.
    • The final delivery modalities for the initialisation service, including a list of provided deliverables, are also expected.

    Sources

    • 12026_025_AMF_BP_DQE_Nom de l'entreprise ou du groupement.xlsx — “ouvré (8h à 19h)",Unitaire,,0 ,UO5-1-3,"Assistance et support, en jour non ouvré ou hors de la plage horaire [8h - 19h]",Unitaire,,0 ,UO5-2,Prestation de déploiement et de préparation de la bascule en production,Unitaire…
    • 22026_025_AMF_CCAP.pdf — “d'assurer un service régulier dans les conditions normales d'exploitation. Elle débute à compter de la prononciation de la VABF positive. En l'absence d'indication dans le bon de commande, le délai est fixé à deux (2) mo…
    • 32026_025-AMF_CCCS.docx — “disponibles avant l’entrée en VABF ou avant la première livraison. Le titulaire s’appuie sur les guides de l’ANSSI relatif à la cartographie des SI. Voici la liste des documents à fournir (selon le contexte du Contrat) à…
    • 42026_025_AMF_CR_Nom de l'entreprise ou du groupement.docx — “gestion du passage en phase nominale, avec continuité du dispositif et stabilité des équipes A renseigner Dans un cadre agile Scrum, gestion du risque d’un sprint non conforme aux attentes, dispositif de résolution et im…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 11 FILES

    • 2026_025_AMF_RC.pdf
    • 2026_025_AMF_CR_Nom de l'entreprise ou du groupement.docx
    • 2026_025_AMF_Formulaire_Declaration_CAs.docx

    and 4 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders