    Procedura aperta, sopra soglia, per l’affidamento del servizio di di Progettazione (fattibilità tecnico-economica ed esecutiva), Direzione Lavori e Coordinamento della Sicurezza dei “Lavori di restauro e risanamento del prospetto posteriore del Palazzo Regio a Cagliari”.

    Notice number: 00524309-2026

    🇮🇹 ItalyCitta' Metropolitana di CagliariServices

    KEY INFORMATION

    Submission deadline
    Sep 14, 2026
    Location
    🇮🇹 Italy
    Contracting authority
    Citta' Metropolitana di Cagliari
    Accepted Languages
    Italian
    Tender type
    Services
    Contract Value
    Published date
    Jul 29, 2026

    TENDER DESCRIPTION

    The provided research answers describe planning and engineering services for the new construction of a control room and changing rooms in Solingen, encompassing nine phases (LPH 1-9) of HOAI services, including variant studies, design planning, approval, execution, and construction supervision through December 2029. This scope involves comprehensive technical requirements such as integration into existing fire alarm and access control systems, VdS/VDE conformity, specific KVM system infrastructure with secure user login via RFID/biometrics, advanced HVAC concepts with heat/cold recovery, and detailed lighting design adhering to DIN standards for 24/7 operation with LED technology. Financial standing requires professional liability insurance with minimum coverage of 750,000 EUR for both personal injury and property/other damages, along with a declaration of no provisional insolvency administrator. However, this description of work and associated technical requirements appears to be inconsistent with the stated tender title, "Restoration and rehabilitation works of the rear facade of the Palazzo Regio in Cagliari," suggesting the research answers may pertain to a different…

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract start date: Immediately after contract award.
    • Contract end date: December 31, 2029.
    • Total duration: The estimated duration is stated as unknown.

    Key milestones and phases include:

    • LPH 1 Planned Project Start: Immediately after contract award.
    • LPH 2 Completion (Preliminary planning including variants, workshops, and cost estimation): January 30, 2026.
    • LPH 3 Completion (Draft planning): May 30, 2027.
    • LPH 4 Submission of Approval Documents: June 30, 2027.
    • LPH 4 Presence of Building Permit: December 31, 2027.
    • LPH 5 Completion of Execution Planning: March 31, 2028.
    • LPH 6–7 Completion of Award: June 30, 2028.
    • Planned Construction Start: August 1, 2028.
    • Planned Completion / Commissioning: December 31, 2029.

    Sources

    • 1Unterlagen\Vergabeunterlagen.pdf — “KVM-Nutzbarkeit 7.3 Vergabeempfehlung Der AN wirkt bei Bieterfragen, Angebotswertung (fachtechnisch/ergonomisc h) und Vergabeempfehlung mit; beim KVM-Los werden Nutzungs-Kriterien (Umschaltzeiten, Geräusch-/Wärmelast, Be…
    • 2B_315435C7-53C3-4212-A03B-91AF04EEC8D3.PDF — “Objektbetreuung Interne Kennung: 86066cd1-8653-4cbe-b877-47a258dfd3ef 5.1.1 Zweck Art des Auftrags: Dienstleistungen Hauptklassifizierungscode (cpv): 71240000 Dienstleistungen von Architektur�und Ingenieurbüros sowie pla…
    • 3Bekanntmachung\Auftragsbekanntmachung.pdf — “Vergabe - 8 Objektüberwachung - Bauüberwachung und Dokumentation - 9 Objektbetreuung Interne Kennung: 86066cd1-8653-4cbe-b877-47a258dfd3ef 5.1.1 Zweck Art des Auftrags: Dienstleistungen Hauptklassifizierungscode (cpv): 7…

    The core scope of work for this tender involves planning and engineering services for the new construction of a control room ("Schaltwarte") and changing rooms ("Umkleide") in Solingen. These services are structured across nine phases (LPH 1-9) according to the HOAI (German Fee Schedule for Architects and Engineers).

    The key deliverables and responsibilities include:

    • LPH 1 - Grundlagenermittlung (Basic Evaluation): Clarifying the task, defining functional and technical requirements for two building variants, site inspection, regulatory analysis, and documenting an objective paper along with a workshop roadmap. This phase also includes designing changing and shower areas for 40 people, with potential expansion for 15 additional workstations.
    • LPH 2 - Vorplanung (Preliminary Planning): Conducting variant studies, including room structure (Schwarz/Weiß zoning), and developing a ventilation and air conditioning concept that considers relevant workplace regulations (ASR A3.6, ASR A3.5) and hygiene guidelines (VDI 6022), specifically addressing heat loads from IT/KVM in the control room and humidity from the shower areas.
    • LPH 3 - Entwurfsplanung (Design Planning): Creating scaled design plans, focusing on ergonomics and KVM integration for the control room workstations, and preparing a design report that details lighting, materials, color concepts, and glare/reflection avoidance. This also involves updating cost estimates and timelines, and integrating functional areas, contamination-reduced pathways, furniture, and KVM topology.
    • LPH 4 - Genehmigungsplanung (Approval Planning): Developing and submitting approval-ready documents, including plans for sanitary facilities, daylight, escape routes, and hygiene measures, in coordination with the relevant authorities. Compliance with ASR A4.1 and BImSchG is required.
    • LPH 5 - Ausführungsplanung (Execution Planning): Producing detailed execution plans for the changing rooms, showers, control room, and KVM integration, along with technical specifications for Schwarz/Weiß zoning, monitor/operating equipment, and KVM. Structural considerations for future building expansion must also be incorporated.
    • LPH 6 - Vorbereitung der Vergabe (Preparation for Award): Preparing billable service items for interior work, sanitary installations, electrical/IT, and KVM systems, calculating quantities, drafting tender texts (bill of quantities), and coordinating deadlines and costs with specialist planners.
    • LPH 7 - Mitwirkung bei der Vergabe (Assistance in Awarding): Assisting with bid solicitation, technical review of offers, comparing bids with emphasis on ergonomics, daylight, and KVM usability, and providing a recommendation for contract award.
    • LPH 8 - Objektüberwachung (Construction Supervision): Supervising construction to ensure adherence to planning, specifically for Schwarz/Weiß separation, daylight control, control room ergonomics, and KVM installation. This includes conducting site meetings, maintaining protocols, supporting acceptance procedures, managing defects, and documenting progress.
    • LPH 9 - Objektbetreuung (Property Support): Providing support during the warranty period, including collecting user feedback and making fine adjustments to lighting and KVM operations if necessary, and preparing final documentation and handover protocols.

    Additional key aspects include:

    • The development, analysis, and comparative evaluation of different building variants, presenting their advantages and disadvantages, and providing separate cost calculations, area analyses, and timelines for each variant.
    • Moderation of up to seven workshops covering kickoff, processes, lighting, ergonomics, color/material concepts, and final discussions.
    • Simulation of the lighting concept, including daylight and artificial lighting for 24/7 operation, with glare and reflection analysis (ASR A3.4).
    • Specification of the KVM system, encompassing infrastructure, switching times, and thermal/acoustic decoupling.
    • Documentation of Schwarz/Weiß zoning, outlining usage paths and hygiene guidelines in accordance with ASR A4.1.
    • Ensuring all necessary documentation, concepts, and approvals (e.g., fire protection, structural stability, thermal insulation, sound insulation, workplace safety, ergonomics, technical systems, general safety, accessibility) are considered as an integral part of the planning services.
    • Integrating the new building into the existing access control system.
    • Taking into account the future KRITIS status (critical infrastructure as per BSI-Kritisverordnung) and equipping rooms according to the client's protection zone concept, which necessitates a confidentiality agreement.
    • All planning services must be delivered in specific electronic formats, including Word®, Excel®, Access®, ACAD®, and Eplan®.

    Sources

    • 1Unterlagen\Vergabeunterlagen.pdf — “unterliegt. Die Freigabe für Leistungsphase 8 erfolgt nach Auftragserteilung für den Neubau durch die TBS, die Freigabe für Leistungsphase 9 nach Abnahme. 5. Leistungsphasen (LPH 1–9) LPH 1 – Grundlagenermittlung 1.1 Klä…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 25 FILES

    • Unterlagen\Weitere Dokumente\Anlage Schlagworte Wasserlabor.pdf
    • Unterlagen\Weitere Dokumente\Anlage 8_ Muster Verpflichtungserklärung.pdf
    • Unterlagen\Weitere Dokumente\Referenzauskunft UVgO_VgV.doc

    and 18 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders