    Notice number: 00590017-2026

    🇷🇴 RomaniaMunicipiul IasiWorks

    KEY INFORMATION

    Submission deadline
    Oct 2, 2026
    Location
    🇷🇴 Romania
    Contracting authority
    Municipiul Iasi
    Accepted Languages
    Romanian
    Tender type
    Works
    Contract Value
    Published date
    Aug 26, 2026

    TENDER DESCRIPTION

    This tender seeks a comprehensive solution for the conversion of CET II Holboca from coal to natural gas, involving the design, procurement, and installation of new H2 Ready Cogeneration (CHP) units. The scope encompasses drafting all necessary technical documentation and securing approvals, manufacturing and delivering equipment, executing extensive construction and installation works, including utility and technological connections, conducting tests, training operating personnel, and commissioning the facility while ensuring guaranteed performance and defect remediation during the warranty period. Key technical specifications include a minimum energy production capacity of 18 MWe and 28 MWt, with a minimum thermal efficiency of 45% for the natural gas-fueled CHP units, and specific district heating water temperature requirements. The contract duration is 26 months, with 4 months allocated for design and 22 months for execution, and bidders must demonstrate a minimum average global annual turnover of 120,000,000.00 RON for the last three financial years.

    TENDER BRIEF

    The contract becomes effective on the date of its signing by the last party. The latest signature date observed in the document is July 10, 2026.

    The total duration for the execution of works is 26 months, starting from the date the Beneficiary issues the order to commence the contract. This commencement is conditional upon the establishment of the good performance guarantee as per Clause 15 of the General Conditions.

    Key milestones and phases include:

    • Project design: 4 months.
    • Execution of works: 22 months.
    • Term for drafting the technical project and transmitting it to the Supervisor: 4 months.
    • Term for obtaining the building permit: 30 days.

    An explicit contract end date is not specified, as it depends on the issuance date of the Beneficiary's order to start the contract, which is not provided in the documents.

    Sources

    • 1Acord_contractual.pdf — “de acest els oficial şi asupra legalitățin 0707-2026 Şef Serviciu Achiziții Publice Gabriela BĂDĂRĂU Îmi asum responsabilitatea pentru corectitudinea și legalitatea acestui înscris oficial Verificat, Compartiment Monitor…

    The core scope of work for this tender involves the "CONVERSION OF CET II HOLBOCA FROM COAL TO NATURAL GAS BY INSTALLING NEW H2 READY COGENERATION (CHP) UNITS".

    The Statement of Work (SOW) summary includes:

    • Design and Technical Assistance: This encompasses the elaboration of technical documentation required for obtaining all necessary permits, approvals, and authorizations for the investment objective's realization and operation. It also includes the development of the technical project (including documentation for obtaining the building permit) and execution details. Furthermore, it covers technical assistance provided by specialized designers in the relevant fields throughout the execution of works and reception phases, and the delivery of "as-built" documentation and the technical book of the construction.
    • Execution: This phase involves:
    • Manufacturing and delivery (procurement) of technological equipment and machinery.
    • Execution of construction and installation works, including utility connections (natural gas, electricity, potable water, sewage).
    • Installation of technological equipment and machinery, including technological connections (electricity, natural gas, treated water, heating water, sewage).
    • Conducting technological tests and trials.
    • Training the operating personnel.
    • Commissioning the investment objective, including demonstrating guaranteed performance.
    • Remedying any defects that appear during the warranty period.

    The overall duration of the contract is 26 months, with 4 months allocated for design and 22 months for the execution of works. The contractor is responsible for designing, executing, and finalizing these works, as well as remedying any defects during the warranty period.

    Sources

    • 1Instructiuni_ofertanti_FisaDate_DF1275926.pdf — “fara TVA: 203240966,65; Moneda: RON Alte valori: Valoarea garantiei de participare: 2000000 RON (0,98%) II.1.6) Impartire in loturi: Nu II.2 Descriere II.2.3 Locul de executare Cod NUTS: RO213 laşi Locul principal de exe…
    • 2Acord_contractual.pdf — “şi 22 luni executia lucrărilor. vv) | Sector | Prezentul contract nu este împărțit pe Sectoare de lucrări bbb) | Numele şi adresa Supervizorului | (urmeaza a se organiza procedura de atribuire a Contractului de Superviza…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 23 FILES

    • DUAE_CERERE_377631.xml
    • HCL 379 din 19.12.2024.pdf.p7m
    • HCL 48 Pr Tf CET 2 Is.pdf.p7m

    and 16 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders