Published
Default lot
Notice number: 00520679-2026
KEY INFORMATION
- Submission deadline
- • Sep 11, 2026
- Location
- 🇷🇴 Romania
- Contracting authority
- Comuna burjuc
- Accepted Languages
- Romanian
- Tender type
- Works
- Contract Value
- Published date
- Jul 28, 2026
TENDER DESCRIPTION
This tender seeks comprehensive design and execution services for the extension of water supply networks and the establishment of household sewerage networks across the villages of Petresti, Bradatel, Glodghilesti, Burjuc, Tatarasti, and Tisa within the Burjuc Commune, aiming to enhance the social and economic development of the population. The scope includes the modernization of the existing Ilia wastewater treatment plant to accommodate increased capacities, installation of fire hydrants, and the drilling of boreholes equipped with submersible pumps and control systems to secure water supply to specific villages. Technical specifications mandate the use of PEID PE100 PN10 or PN16 pipes for water supply and PVC-KG SN4 DN200 and DN250mm pipes for sewer collectors, with all works adhering to applicable regulations and standards. The maximum contract duration is 57 months, comprising 3 months for design, up to 18 months for works execution, and a minimum 36-month warranty period, contingent upon the establishment of a performance bond. The estimated value for this engagement is 72,040,486.97 RON, with interested parties required to demonstrate an average annual general turnover of…
TENDER BRIEF
The contract timeline is structured as follows:
- Total Duration: The contract will last for a maximum of 57 months. This duration is broken down into specific phases: 3 months for design, 18 months for the execution of works, and 36 months for the warranty period.
- Start Date: The contract officially begins upon the issuance of the administrative order to commence services, provided that the good execution guarantee has been established.
- Key Milestones/Phases:
- Design Services: This phase has a maximum duration of 3 months. It starts from the date the commencement order is issued by the beneficiary and concludes with the delivery of the final part of the technical project documentation.
- Execution of Works: This phase is stated as a maximum of 18 months within the total contract duration. Additionally, it is noted that the execution of works is a maximum of 12 months, calculated from the work commencement order issued by the beneficiary until the final acceptance of the planned works. This 12-month period excludes any suspension periods due to reasons not attributable to the contractor or time allocated for unforeseen works.
- Warranty Period: A warranty period of at least 36 months is provided for the works.
- Duration of initial contract phases (Design and Execution): Separately, the contract duration in months is specified as 21 months, which likely covers the design and execution phases before the warranty period.
Sources
- 1Instructiuni_ofertanti_FisaDate_DF1276472.pdf — “doua foraje (F1 si F2), echipate cu cate o electropompa submersibila (PF1 si PF2) echipamente hidraulice, cabina foraj, comanda, monitorizare si control. La frontul de captare se va asigura racordul electric corespunzato…”
- technical constraints
- regulations, standards, and norms applicable in the field
- methodology for providing design services
Sources
- 1Instructiuni_ofertanti_FisaDate_DF1276472.pdf — “prezenta in cadrul propunerii tehnice dovezi in acest sens, Lipsa informatiilor duce la respingerea ofertei ca neconforma in baza art. 215 alin. 5 din Legea 98/2016. Ofertanții au obligaţia de a indica sau marca document…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 12 FILES
- Instructiuni_ofertanti_FisaDate_DF1276472.pdf286 KBPDF
- FORMULARE-semnat.pdf.p7s1.2 MBP7S
- STUDIU HIDROLOGIC PETRESTI-semnat-semnat.pdf.p7s2.7 MBP7S
and 5 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.