Notice number: 00578962-2026
KEY INFORMATION
- Submission deadline
- • Sep 7, 2026
- Location
- 🇷🇴 Romania
- Contracting authority
- Compania nationala de administrare a infrastructurii rutiere s.A.
- Accepted Languages
- Romanian
- Tender type
- Works
- Contract Value
- Published date
- Aug 21, 2026
TENDER DESCRIPTION
This tender invites proposals for the comprehensive design and execution of the Road Node located on the A1 Motorway (km 326+155) – DJ 704 (Cugir), encompassing all necessary road works, extensive site preparation including utility relocation and archaeological investigations, and cadastral documentation services. The scope further mandates robust environmental protection and restoration activities, such as landscaping, waste recycling, and detailed environmental monitoring throughout the project lifecycle. Bidders must adhere to the "Do No Significant Harm" (DNSH) principle and implement methodologies for ecological transport, on-site recycling of construction and demolition waste, and utilize low-emission, electric, or hybrid road transport vehicles for specified operations. Financially, a minimum annual turnover of 30,000,000 Lei is required for each of the financial years 2022, 2023, and 2024. The contract will have a minimum duration of 78 months, including a 6-month design period, a 12-month execution period, and a minimum 60-month warranty period, with design activities anticipated to commence by September 1, 2026.
TENDER BRIEF
The contract has a minimum duration of 78 months and a maximum duration of 138 months, depending on the evaluation factor "Works Guarantee Period".
The 78-month contract duration is broken down as follows:
- Design period: 6 months
- Execution period: 12 months
- Minimum warranty period: 60 months
The contracting authority anticipates securing the necessary funding for contract signing in the second half of 2026. For the purpose of preparing the work program, the design activity start date is to be considered as September 1, 2026. However, the actual start date will be communicated to the Contractor via an Administrative Commencement Order.
Key milestones within the design phase include:
- Submission of the Technical Documentation for Construction Authorization (DTAC) to the Supervisor: 90 days from the Design Activity Start Date.
- Approval of DTAC by the Beneficiary: 15 days after the Supervisor's approval of DTAC.
- Submission of the Technical Execution Project (PTE) and Execution Details (DDE) to the Supervisor and Beneficiary: 150 days from the Design Activity Start Date.
- Approval of PTE and DDE by the Supervisor: 15 days after submission by the Contractor to the Supervisor.
- Approval of PTE and DDE by the Beneficiary: 15 days after the Supervisor's approval of PTE and DDE.
Sources
- 1Anexa 1 la Documentatia de atribuire_semnat.pdf — “alterate intr-o masura care sa conduca fie la nerealizarea obiectivului de investitie in preturile ofertate fie sa nu asigure realizarea si finalizarea corespunzatoare a contractului. Autoritatea Contractanta estimeaza c…”
- 2Instructiuni_ofertanti_FisaDate_DF1269285.pdf — “al fondurilor care implica mai multe institutii ale statului. 3. Durata minima a contractului este de 78 de luni iar durata maxima este de 138 de luni, in functie de factorul de evaluare Perioada de garantie a lucrarilor…”
- 3Cerintele Beneficiarului Nod Cugir_semnat.pdf — “de schite, documente si date din care sa rezulte locatia, dotarile si suprafetele avute in vedere. Totodata, daca ofertantii propun utilizarea altui amplasament pentru organizarea de santier decat cea indicata prin docum…”
- 4Formulare_semnat.pdf — “respectarea punctelor de referinta. Programul de lucrari (Graficul Gantt) trebuie fie in concordanta cu succesiunea normala a activitatilor de proiectare si de executie a lucrarilor. In vederea asigurarii tratamentului e…”
The core scope of work and statement of work summary for this tender include:
1. Design Activities: Realization of design works according to current regulations, encompassing field studies, as-built drawings, the Construction Book, and obtaining approvals for PAC/DTAC, PTE, and Quantity Lists. This also includes technical assistance during the execution phase of the works.
2. Environmental Protection and Restoration: Implementing measures such as fencing, landscape arrangements (grassing, shrub planting), installing separators for grease/hydrocarbons, various basins (dispersion, retention, sedimentation, decantation), phyto-purification systems, and monitoring environmental factors (biodiversity, air, water, soil quality, noise). It also covers the installation of noise protection panels and any other activities required for environmental protection and returning the site to its initial state. Methodologies for ecological transport and recycling/reuse of construction and demolition waste are also included.
3. Site Preparation: This involves the relocation, deviation, or protection of various utilities, including natural gas distribution/transport, telecommunication/fiber optic installations, and water-sewage networks. It also covers archaeological investigations (research, discharge, and supervision), identification of unexploded ordnance, and geotechnical monitoring throughout the design and execution periods, along with any other necessary site arrangement activities.
4. Road Works - Road Interchange: Construction activities for a road interchange, specifically including earthworks and subgrade improvement, and systems for water drainage, collection, and evacuation. Specific structures like passages over highways (e.g., Highway A1) are also part of this category.
5. Cadastral Documentation Services: Preparation and approval of the work's location plan by relevant authorities (OCPI/ANCPI), obtaining information from land registries and notary offices, verifying property owner identification, and notifying affected property holders. This also involves the expropriation corridor overlapping affected parcel plans.
6. Ancillary Activities: Conducting technological probes and tests, and undertaking activities necessary for the implementation of a contract promotion plan.
Sources
- 1Formulare_semnat.pdf — “legal Ofertant asociat n (denumirea operatorului economic si a reprezentantului legal) 16 (semnatura) Ref. | Activitate/Categorie de lucrari 1 | Activitate: Proiectare 1.1 | Realizarea proiectarii lucrarilor conform norm…”
- 2Anexa 1 la Documentatia de atribuire_semnat.pdf — “TUTUROR sub-activitatilor care compun activitatile de proiectare si executie prevazute in Cerintele Beneficiarului, in succesiunea normala a acestora, si in corelare INTEGRALA cu resursele tehnice si umane necesare proie…”
- 3Cerintele Beneficiarului Nod Cugir_semnat.pdf — “prevederile legii si ale contractului, daca Beneficiarul sesiseaza Antreprenorul despre neregulile constatate, se returneaza livrabilele in original in vederea corectarii/completarii. 3.B.2. Servicii în vederea realizări…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 14 FILES
- Model contract_semnat.rar.p7s900 KBP7S
- Documentele Beneficiarului.part04_semnat.rar.p7s99.0 MBP7S
- Documentele Beneficiarului.part05_semnat.rar.p7s99.0 MBP7S
and 7 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.