Notice number: 00534518-2026
KEY INFORMATION
- Submission deadline
- • Sep 7, 2026
- Location
- 🇷🇴 Romania
- Contracting authority
- Municipiul oradea
- Accepted Languages
- Romanian
- Tender type
- Works
- Contract Value
- Published date
- Aug 3, 2026
TENDER DESCRIPTION
This tender seeks a contractor for the design and execution of rehabilitation works for secondary district heating networks at Pumping Stations PT 108, PT 209, PT 210, PT 215, PT 521, PT 523, and PT 868 in Oradea, aiming to enhance energy efficiency, reduce network losses, and improve system reliability and public health. The scope encompasses comprehensive design documentation, including obtaining all necessary approvals, preparing DTAC, Technical Project with Execution Details, a site health and safety plan, and AS-BUILT documentation. Key requirements also include technical assistance from the designer, procurement of materials and equipment, execution of works, commissioning (PIF) of installations, and a parallel training program for operator personnel. The contract has an estimated value of 49,899,504.96 lei excluding VAT, with a total duration of 24 months, including a 6-month period dedicated to the design phase.
TENDER BRIEF
The total duration of the contract is 24 months, which includes a 6-month period for design.
Sources
- 1Instructiuni_ofertanti_FisaDate_DF1276884.pdf — “282 625,00 lei fără TVA -Pregătire personal, probe tehnologice şi teste - 52 239,64 lei fără TVA -Execuţie lucrări - 47 762 658,98 lei fără TVA Sistemul Electronic de Achizitii Publice, 29.07.2026 14:16 Pagina 2 e Licita…”
- Obtaining all necessary approvals and authorizations for all phases of the contract.
- Preparing DTAC (Documentation for obtaining Construction Permit).
- Preparing a Technical Project with Execution Details.
- Verification of the technical project and execution details by authorized verifiers.
- Preparing a Health and Safety Plan for the construction site.
- Preparing AS-BUILT documentation, including technical books for constructions/installations.
- Obtaining approval for control and verification plans, including decisive phases of the works, from the State Inspectorate in Construction (where applicable).
- Technical assistance from the designer during the investment period.
- Acquisition of materials.
- Acquisition of equipment.
- Execution of works and commissioning of installations.
- Testing and commissioning (PIF) starting from the completion of execution works.
- Conducting a training program for the operator's personnel during the commissioning period.
Sources
- 1Instructiuni_ofertanti_FisaDate_DF1276884.pdf — “art 221 din Legea $98/2016$ va fi aplicat pe parcursul executarii contractului. Prezenta prevedere rerezinta un amendament care permite cresterea valorii contractului astfel ca in cazul in care vor fi necesare modificari…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 10 FILES
- DUAE_CERERE_380080.xml227 KBXML
- 1.4 Conditii specifice.doc.p7s1.1 MBP7S
- Caiet de sarcini 7 PT rev 4.doc.p7s2.0 MBP7S
and 3 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.