Published
Projet AxLR « Highly stable pervoskite solar cells »
Notice number: 00553756-2026
KEY INFORMATION
- Submission deadline
- • Sep 7, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Satt axlr
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Aug 10, 2026
TENDER DESCRIPTION
The innovation developed within the IEM laboratory in Montpellier consists of stabilizing perovskite materials. The researcher behind this discovery demonstrated that a stable perovskite ink formulation could be implemented for the production of photovoltaic panels. The advantage of perovskites in photovoltaics is that the material allows absorbing additional wavelengths beyond what silicon materials can achieve. However, a major drawback limits the deployment of perovskites in solar energy today; the materials are very sensitive to light, humidity, and heat. The innovative formulation offers a promising solution as preliminary results estimate stability beyond 25 years. If these results were demonstrated by measurements according to current standards, the perovskite photovoltaic market could finally develop and compete with silicon photovoltaics. The AxLR maturation proposes a technology development program to demonstrate performance on representative photovoltaic modules. The contract aims: - On the one hand, the production of small-area photovoltaic cells on glass substrate, with the objective of high power conversion efficiency according to solution-processing techniques…
TENDER BRIEF
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 2 FILES
- non-restricted-documentLINK
- TED PortalLINK
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.