(ProVia-ID 142628) Golling-Abtenau - Sulzau; Linienverbesserung Bereich Pass Lueg (Phase 2), Planung; Geologie und Hydrogeologie Tunnel; Einreichplanung & Optional Ausschreibungs- & Ausführungsplanung
Notice number: 00525808-2026
KEY INFORMATION
- Submission deadline
- • Sep 7, 2026
- Location
- 🇦🇹 Austria
- Contracting authority
- ÖBB-Infrastruktur AG
- Accepted Languages
- German
- Tender type
- Services
- Contract Value
- Published date
- Jul 29, 2026
TENDER DESCRIPTION
This tender invites proposals for comprehensive geological, geotechnical, and hydrogeological planning and consulting services for the "Golling-Abtenau - Sulzau; Line Improvement Pass Lueg Area (Phase 2)" project, specifically for the new Ofenauer and Hiefler tunnel sections. The core scope involves Submission Planning, with optional phases for Tendering and Execution Planning, encompassing detailed data collection, subsoil exploration, water management evidence preservation, official procedures, and specialist coordination to secure all necessary approvals. Proposers are required to adhere to the "Stand der Technik," sustainable project planning principles, and specific methodologies for tunnel shell dimensioning, while utilizing current GIS formats, Building Information Modeling (BIM), and complying with guidelines from FSV, ÖBB-Infrastruktur AG, and TSI. Financially, applicants must hold a liability insurance of at least €750,000, which must increase to €2,000,000 upon contract award, with services anticipated to commence in Q2/2027 and extend through an estimated project completion in 2040, including dismantling of the existing line.
TENDER BRIEF
The contract timeline includes the following key milestones and phases:
- Issuance of tender documents: Expected on October 12, 2026.
- Hearing: Expected on December 14 and 15, 2026.
- Start of services: After contract award, anticipated in Q2/2027.
- UVE-Konzept: Q1/2028.
- Preliminary Submission Plans: Q4/2028.
- Completion of Submission Documents: Q1/2029.
- Planned Submission of EIA/Railway Approval: Q2/2029.
- EIA Negotiation, Approval Decision: 2030 - 2031.
- Detailed Planning: Starting from 2031.
- Estimated Construction Start: 2033.
- Estimated Commissioning of Line Improvement: 2039.
- Dismantling of Existing Line and Estimated Completion: 2040.
The services for Planning Phase I (Submission Phase) are to commence immediately upon contract conclusion and continue until the positive decision under the EisbG is obtained. Tender planning services will begin immediately after the order is placed (option call-off). Execution planning will proceed in parallel with the construction work throughout the entire construction period, with an appropriate lead time. The project's implementation is structured into 5 main construction sections. The basic order covers all services necessary for the submission planning, while services for detailed planning (tender and execution planning) are offered as an option.
Sources
- 1G30147_GHT_01_Grundlagen des Vergabeverfahrens.pdf — “– Tunnelabschnitte Teil 01 - Grundlagen des Vergabeverfahrens 03.03.2026 Juli/2026 ©ÖBB-Infrastruktur AG Seite 6/45 12.1.2 Bewerberauswahl Die eingegangenen Teilnahmeanträge werden unter Ausschluss der Bewerber von einer…”
- 2G30147_GHT_03_Aufgabenstellung.pdf — “Wissensstand zum Zeitpunkt der Ausschreibungsveröffentlichung dar und sind von dem tatsächlichen Verlauf des Planungsprozesses und der Bauausführung abhängig. Leistungsbeginn: nach Auftragserteilung, Q2/2027 UVE-Konzept…”
The core scope of work for this tender involves providing all geological/geotechnical and hydrogeological planning and consulting services for new tunnel sections within the "Golling-Abtenau - Sulzau; Linienverbesserung Bereich Pass Lueg" project (km 31.000 – km 37.032 of railway line 10103 Salzburg Hbf - Wörgl Hbf). The primary objective is to complete the "Einreichplanung" (Submission Planning), with optional phases for "Ausschreibungsplanung" (Tendering Planning) and "Ausführungsplanung" (Execution Planning).
The statement of work summary includes the following key deliverables and services across different phases:
Phase I: UVP-Planung und Eisenbahnrechtliche Einreichplanung (EIA Planning and Railway Law Submission Planning)
- Grundlagenerhebung (Data collection).
- Kartierungen (Mapping).
- Baugrunderkundung (Subsoil exploration), including planning, supervision, and evaluation.
- Geologisch/geotechnische und hydrogeologische Fachleistungen (Geological/geotechnical and hydrogeological specialist services).
- Wasserwirtschaftliche Beweissicherung (Water management evidence preservation).
- Behördenverfahren (Official procedures).
- Fachkoordination und Beratung (Specialist coordination and consulting).
- Stellungnahmen (Statements/Opinions).
- Ensuring all necessary official approvals and the railway law decision for the construction project are obtained.
Phase II (optional): Ausschreibungsplanung (Tendering Planning)
- Ergänzende Kartierungen (Supplementary mapping).
- Ergänzende Baugrunderkundung (Supplementary subsoil exploration).
- Geologisch/geotechnische und hydrogeologische Fachleistungen (Geological/geotechnical and hydrogeological specialist services).
- Erstellung des Ausschreibungsgutachtens (Preparation of the tender report).
- Wasserwirtschaftliche Beweissicherung (Water management evidence preservation).
- Fachkoordination und Beratung (Specialist coordination and consulting).
- Stellungnahmen (Statements/Opinions).
- Incorporation of official requirements from approval procedures into the construction tender.
- Approval of technical tender documents in coordination with the planner.
Phase III (optional): Ausführungsplanung (Execution Planning)
- Geologisch/geotechnische und hydrogeologische Fachleistungen (Geological/geotechnical and hydrogeological specialist services).
- Steuerung der wasserwirtschaftlichen Beweissicherung - Gesamttrasse (Management of water management evidence preservation - entire route).
- Fachkoordination und Beratung (Specialist coordination and consulting).
- Stellungnahmen (Statements/Opinions).
- Ensuring professional and state-of-the-art execution of construction works.
- Commissioning and handover of facilities to the operator.
- Creation of necessary specialized documents for operational approval/inspections and obtaining official approvals.
- Submission of agreed-upon as-built documentation.
General/Cross-Phase Services include:
- Building Information Modeling (BIM).
- Digital document processing.
- Use of a specific coordinate system.
- Preparation of drawing headers and report cover sheets.
- Use of the c.des plan review platform and project data platform.
- Updating of planning documents and integration of third-party planning.
- Use of a Geographic Information System (GIS).
- Defining calculation values.
- Client controlling activities.
- Requirements for personnel and availability.
- Framework services, incidental costs, and direct services (Regieleistungen).
- Meetings and site inspections.
- Coordination with the client and project team members.
- Continuous updating and transfer of working documents.
- Organization and leadership of meetings, including minute-taking.
- Procurement of necessary supplies and documents.
- Preparation of invoices and documentation.
- Coverage of incidental costs, including those related to the plan review platform and data exchange.
Sources
- 1G30147_GHT_03_Aufgabenstellung.pdf — “ÖBB-Infrastruktur AG Geschäftsbereich Projekte Neu-/Ausbau ÖBB Strecke 10103 Salzburg Hbf - Wörgl Hbf Golling-Abtenau - Sulzau; Linienverbesserung Bereich Pass Lueg km 31,000 – km 37,032 Fachplaner Baugrund Tunnelabschni…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 11 FILES
- G30147_GHT_03_Aufgabenstellung.pdf462 KBPDF
- OEO025-OIE-0000GG-05-0066-F00.pdf382 KBPDF
- G30147_GHT_01A_Teilnahmeantrag.docx138 KBDOCX
and 4 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.