PV Stare Brynki o mocy przyłączeniowej do 9,03872 MW i mocy zainstalowanej do 9,03872 MW
Notice number: 00716588-2026
KEY INFORMATION
- Submission deadline
- • Nov 20, 2026
- Location
- 🇵🇱 Poland
- Contracting authority
- ENEA Nowa Energia sp. z o.o.
- Accepted Languages
- Polish
- Tender type
- Works
- Contract Value
- Published date
- Oct 16, 2026
TENDER DESCRIPTION
This tender seeks comprehensive turnkey execution of construction, electrical, and necessary design works for the PV Stare Brynki photovoltaic installation, targeting a connection and installed capacity of up to 9.03872 MW. The scope includes site preparation, development of complete low and medium voltage energy and telecommunications infrastructure, and the arrangement and installation of investor-supplied photovoltaic panels and inverters, all leading to the full commissioning and handover for commercial operation with an expected exploitation period of at least 25 years. Bidders must demonstrate financial resources or creditworthiness of at least 7,000,000.00 PLN and hold civil liability insurance for the same amount, alongside meeting specific technical requirements for communication systems and network infrastructure. The contract has a strict timeline of 17 months from the start date, within which the contractor must obtain the Final Operational Notification (FON).
TENDER BRIEF
The contract timeline is as follows:
- Contract Start Date: The day the agreement is concluded.
- Contract End Date: 17 months from the contract start date.
- Total Duration: 17 months.
- Key Milestones/Phases:
- The contractor must obtain FON (Final Operational Notification) within 17 months from the contract start date.
- A detailed Implementation Schedule, presented in MS Project and Gantt chart format, must be submitted to the Employer within 21 days from the contract start date. This schedule will further detail the Financial and Material Schedule.
- The Implementation Schedule is expected to include a chronological layout with start and end dates, along with the scope of various milestones.
- The Financial and Material Schedule (Appendix No. 6 to the Agreement) specifies the scope and deadlines for individual milestones.
Sources
- 1SWZ cz. III_ Projekt_ umowa_Stare Brynki umowa_PV_29092026.pdf — “pkt 11.4.1.-11.4.3. Umowy, przed jej udzieleniem Wykonawca przekaże Zamawiającemu Zabezpieczenie Zwrotu Zaliczki. 9.17. Zabezpieczenie Zwrotu Zaliczki będzie opiewać na kwotę Zaliczki wyrażoną w walucie polskiej. Zabezpi…”
The core scope of work for this tender is the comprehensive "turnkey" execution of construction and electrical works for the PV Stare Brynki photovoltaic installation, with a connection capacity and installed capacity of up to 9.03872 MW. This includes all necessary design works, with the exception of the supply of photovoltaic panels and inverters, which are provided by the investor; however, their placement and installation are the responsibility of the contractor. The project encompasses all tasks and obligations required to launch the Photovoltaic Installation, including conducting all necessary inspections and tests, obtaining all permits (including the Use Permit), and handing over the installation for commercial operation.
A high-level summary of the Statement of Work and core deliverables includes:
- Documentation and Design: Preparation of executive documentation, verification of the client's construction project, development of a replacement project and obtaining a replacement building permit if necessary, pre-design analyses and geotechnical documentation, BIOZ plan, road traffic organization project for the construction period, and waste management documentation. Design solutions must be adapted to the parameters of investor-supplied PV modules and inverters.
- Construction and Installation: Providing a construction site, performing geotechnical tests and pull-out tests for support structures, constructing access road networks, building support structures for PV panels, executing the connection to the power grid, and implementing complete low and medium voltage energy infrastructure as well as telecommunications infrastructure for the PV installation. This also involves the delivery, assembly, and commissioning of devices with a remote supervision and control system, as well as the assembly and commissioning of photovoltaic panels and inverters (provided by the investor). Further, it includes site preparation (e.g., land leveling, shrub removal), reconstruction of conflicting existing infrastructure, internal road systems, delivery and assembly of nN/SN transformer stations, and containers for spare PV modules, along with mechanical and alarm systems and monitoring.
- Commissioning and Handover: Acceptance of the photovoltaic installation, technical acceptance, preparation of post-startup documentation, obtaining the permission for use, and final acceptance of the project.
Sources
- 12026-OJS201-00716588-pl-ts.pdf — “zamówienia. 5. Część zamówienia 5.1. Część zamówienia: LOT-0001 Tytuł: PV Stare Brynki o mocy przyłączeniowej do 9,03872 MW i mocy zainstalowanej do 9,03872 MW Opis: Przedmiotem zamówienia jest kompleksowa realizacja zad…”
- 2SWZ cz. III_ Projekt_ umowa_Stare Brynki umowa_PV_29092026.pdf — “Program Funkcjonalno-Użytkowy wraz Z Harmonogramami Rzeczowo- Finansowymi, stanowiącymi załączniki do Specyfikacji Warunków Zamówienia i Umowy. 4.2.2. przedmiot Umowy nie obejmuje dostawy Paneli Fotowoltaicznych i Falown…”
- 3Zał. nr 1-26 do Umowy PV Stare Brynki_29.09.2026.pdf — “Instalacji Fotowoltaicznej zgodnie z Warunkami Przyłączenia, projekt zagospodarowania terenu, projekt wykonawczy obwodów pierwotnych $nN/SN$ . projekt wykonawczy obwodów wtórnych $nN/SN,$ projekt wykonawczy powiązania ka…”
- 4SWZ cz. II_PFU - PV Stare Brynki - 29092026.pdf — “oceny Wykonawcy w zakresie zgodnym z własnymi uwarunkowaniami technicznymi Wykonawcy z uwzględnieniem Wymagań Zamawiającego w tym uzyskanie niezbędnych, brakujących pozwoleń, zezwoleń, decyzji, uzgodnień, postanowień, zg…”
- 5Zał nr 6 do Umowy_HRF_PV Stare Brynki 9.0 MW 16.10.2026.pdf — “OZNACZENIA: ORK AG 211192005 ZAKRES PRACZADANIA NRETAPU | NH KAMIENIA EGO | DATA CAREONCZENIA | WYNAGRODA | ZALICZKA | SPOSEM ODBI PODPISANIE NEw | | | | | POEMOENIE NA BUDUWE ZAMIENNE | | | | | PACIERT WYKONAWCZY UFGOUN…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 24 FILES
- 2026-05-26_Zas_brak sprzeciwu._7843.1.223._Przyłącze_elektr._Wełtyń.oc.pdf546 KBPDF
- Zmiana WP.pdf370 KBPDF
- Zal nr 1_do_SWZ_Formularz Oferta_Stare Brynki.docx110 KBDOCX
and 17 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.