    PS-26-170 - Proposed Alterations and Extension - 2 Woodbank Road, Crosshouse (PRJ0013295)

    Notice number: ocds-r6ebe6-0000840225

    🇬🇧 United KingdomEast Ayrshire CouncilWorks

    KEY INFORMATION

    Submission deadline
    Sep 10, 2026
    Location
    🇬🇧 United Kingdom
    Contracting authority
    East Ayrshire Council
    Accepted Languages
    English
    Tender type
    Works
    Contract Value
    Published date
    Aug 14, 2026

    TENDER DESCRIPTION

    This tender seeks a Principal Contractor for alterations and an extension at 2 Woodbank Road, Crosshouse, KA2 0ET, to be completed within a 12-week timeframe following commencement. The scope of work includes the construction of a new extension containing a bedroom and wet room with an integrated GoLift 400 ceiling track hoist system, alongside minor internal alterations to the existing building involving demolition, redecoration, and modifications to various installations including electrical, water, heating, and ventilation systems. Key technical specifications include the installation of specific wet floor formers (Tuff Form), wet waste systems (AKW GW90-2), sanitary appliances (MIRA Advance shower, wash basins), Altro Whiterock wall finishes, and plywood floor boarding. All works must adhere to relevant standards such as ISO 10535-6 and BS 6465, with the Principal Contractor required to provide a detailed Construction Phase Plan in compliance with CDM 2015 Regulations. The contract includes a 12-month rectification period from practical completion, with monthly interim valuations commencing four weeks after site possession.

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract Start Date: The works commencement date is anticipated to be three weeks after the issue of formal acceptance, but this will be confirmed after the contract award. The "Site Start" is currently TBC.
    • Total Duration: The Date for Completion is twelve weeks following the commencement date. The duration is also stated as 12 Weeks.
    • Key Milestones or Phases:
    • Mobilisation, Planning and Preparation: A minimum of 2 weeks is required.
    • Proposed Phasing: None.
    • Construction Phase Programme: The Principal Contractor must provide a detailed program as part of their Construction Phase Plan before works begin.
    • Interim Valuation Dates: The first Interim Valuation Date will be 4 weeks after the Date of Possession, and subsequently on the same date each month (adjusted to the nearest working day). It is also described as one month from the date of site possession, with monthly intervals thereafter.
    • Rectification Period: This period is 12 months from the date of practical completion of the Works.
    • Supply of documentation for final certification: This must be provided within 3 months from the date of practical completion of the Works.
    • Base Date: This is 10 calendar days before the date for the return of the Tenders.

    Sources

    • 15. Preliminaries.pdf — “Provision 9 Does not apply. Article 8 - Arbitration Article 8 and Schedule Part 1 (Arbitration) apply. Clause 2.3 - Commencement and Completion • Works commencement date: Anticipated to be three weeks after the issue of…
    • 29. 2 Woodbank Road, Crosshouse - PCI.pdf — “Council Opera House 8 John Finnie St Kilmarnock KA1 1DD Contact: Robert Cooper [email protected] 07717 503562 Structural Engineer: FLN Consulting Engineers Studio 7 19 Marine Crescent Glasgow G51 1HD Con…
    • 33. Conditions of Contract.docx — “three weeks after the issue of formal acceptance but this will be confirmed following contract award. 2.3 | Date for Completion | Twelve weeks following the commencement date. 2.9 | Liquidated Damages | At the rate of £3…

    The core scope of work for this tender involves several key areas, categorized as follows:

    1. Alterations to Existing Building: This includes minor demolition and alteration works, such as removing timber skirtings, existing windows, timber cills and aprons, and single doorsets. It also covers the removal of internal masonry partitions. Additionally, it encompasses alterations to external walls, windows, external doors, internal walls and partitions, internal doors, floor finishes, decoration, fittings, furnishings and equipment, water installations, space heating and air conditioning, ventilation, and electrical installations.

    2. New Extension: Works for a new extension involve substructure elements, specifically excavating and filling, including bulk excavation to reduce levels, foundation excavation for strip foundations, and the disposal of non-hazardous excavated material. It also includes imported granular material for filling and the use of geotextile membranes.

    3. External Works: This category covers site preparation works such as site clearance, which includes uplifting paving slabs and clothes poles. It also specifies excavating and filling activities, including bulk excavation and the disposal of non-hazardous material off-site, as well as imported granular material for landscaping and the installation of geotextile membranes. Furthermore, it includes the construction of roads, paths, and pavings, such as precast concrete step units and the application of pea gravel to margins.

    4. Electrical Installations: This work is mentioned for lighting installations as well as general electrical installations within the existing building alterations and the new extension.

    5. Sanitary Installations: This involves the provision and installation of sanitary appliances and fittings, specifically wash basins and shower units.

    6. Wall Finishes: The scope includes the installation of Altro Whiterock PVCu sheet to walls, complete with trims, corners, sealant, corner protectors, jointing, and fixings.

    7. Floor Finishes: This entails the installation of plywood exterior/marine grade boarding to floors.

    8. Decoration: The decoration work primarily focuses on painting and clear finishes, including preparing timber surfaces and applying two coats of Dulux Trade Diamond Satinwood.

    9. General Joinery: This covers floor, wall, and ceiling boarding, sheeting, paneling, fine linings, and casings, as well as timber architraves and linings.

    Sources

    • 14. B of Q.xlsx — “,,,0,,%, ,,,,,,,,,,,,,,,,,, B,,lighting installations,,Item,0,0,,,41,0508,05,02 01- 01 5083 ,,,0,,%, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,, ,,,,,…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 47 FILES

    • AL(20)101 PROPOSED GROUND FLOOR PLAN.pdf
    • AL(22)100 BUILDERSWORK.pdf
    • AL(20)102 PROPOSED ROOF PLAN.pdf

    and 40 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders