Published
Ramavtal Årskonsulter Byggnadskonstruktion
Notice number: 00554970-2026
KEY INFORMATION
- Submission deadline
- • Sep 17, 2026
- Location
- 🇸🇪 Sweden
- Contracting authority
- Region Västmanland
- Accepted Languages
- Swedish
- Tender type
- Services
- Contract Value
- Published date
- Aug 11, 2026
TENDER DESCRIPTION
This Framework Agreement for Annual Consultants in Building Construction encompasses comprehensive information coordination and the delivery of diverse technical documents and models, ranging from investigative tasks to extensive design assignments including contract document preparation. Key technical requirements mandate adherence to standards such as IFC-format, FI2xml, coordinated object-oriented models, and area measurement according to SS 21054:2009, alongside specific documentation for operating systems and software, and electronic invoicing via PEPPOL BIS Billing 3. Proposers must demonstrate a stable economic position with a minimum Creditsafe AB rating of 50, or provide an equivalent declaration supported by group guarantees if applicable, excluding issues related to tax or fee payments. The contract begins January 1, 2027, for an initial term ending December 31, 2027, with options for annual extensions until December 31, 2030, contingent on client non-termination, while individual assignment timelines require client approval and strict adherence to avoid penalties.
TENDER BRIEF
The contract starts on January 1, 2027, and is initially set to end on December 31, 2027.
The agreement includes options for extension:
- If the client does not terminate the agreement by September 30, 2027, it will be extended until December 31, 2028.
- If the client does not terminate the agreement by September 30, 2028, it will be extended until December 31, 2029.
- If the client does not terminate the agreement by September 30, 2029, it will be extended until December 31, 2030.
Key milestones and phases include:
- Before the assignment starts, the consultant, along with other consultants, must develop a detailed timetable for the assignment, which needs to be approved by the client.
- The assignment begins once the order document (assignment contract) is signed.
- The agreed completion time as specified in the order document must be adhered to.
- The consultant's assignment is deemed complete after the warranty inspection of the construction project.
- The client determines the start and end dates for each individual assignment.
- There are specific delivery times for documents (e.g., review, inquiry, construction, and as-built documents), and delays may incur penalties.
Sources
- 1AF Ramavtal Årskonsulter Byggkonstruktion, dat 2026-05-15.pdf — “7 § Arbetsmiljölagen och AFS 2023:13 kap 5. Konsulten ska bl.a. särskilt uppmärksamma och samordna förebyggande åtgärder avseende sådana arbetsmiljörisker som anges i AFS 2023:3 kap 11 § 12. Region | Dokumentnamn ADMINIS…”
The core scope of work and statement of work for this tender primarily involve comprehensive information coordination and the delivery of various technical documents and models. Key aspects include:
- Information Coordination: Appointing a main coordinator and responsible parties, defining decision-making areas, establishing project networks and storage locations, and implementing routines for instructing and training participants. It also covers defining access rights, specifying equipment responsibilities, creating delivery plans and contact lists, and scheduling coordination meetings. The scope includes agreeing on the distribution of coordination tasks and determining the structure for information storage.
- Documentation and Deliverables: Adherence to requirements outlined in Attachments 1-5, with consideration for an existing starter package. Specific deliverables include specifying file formats, ensuring application compatibility, and adhering to structuring requirements for models and documents.
- Delivery Management: Establishing clear routines for deliveries, testing conversions between formats, and determining communication methods and conversion strategies. The SOW also requires defining structuring requirements for models and documents, along with establishing procedures for storing and backing up models, work materials, and final documents.
- Archiving: Determining what information is to be archived, including associated metadata for searchability. A critical aspect is securing finished documents against unintentional alterations, especially in model-oriented environments where approved documents need to be "frozen."
- Quality and Specification: Defining quality standards for models and documents as per Annex 5, managing file versions, and clearly defining all deliverables included in the collaboration in accordance with Annexes 3-5.
- Specific Deliverables: The tender explicitly requires deliverables such as Operation and Maintenance Instructions, Address and Telephone directories, Overview descriptions, Site plans, Orientation plans, Total flow schemes, Marking and signage, Functional overviews, Technical specifications, Drawing lists, and 3D models (e.g., Object models for various disciplines like G-model and VS-model).
Sources
- 11_D014_-_001_--_Region_Västmanland_Checklista_Informationssamordning_TA.xlsx — “och tillägg till standard,0.3,Skall dokumenteras t ex anpassningar till befintliga strukturer x,x,x,x,,x,x,x,,Ange eventuella tillägg och egna tolkningar i samarbetet,1,Skall dokumenteras t ex anpassningar till befintlig…”
- 25_D014_-_001_--_Region_Västmanland_bilaga 5b_DU.xlsx — “Rullistor: Detaljeringsgrad: A B C D Namn: Region Västmanland Bilaga 5b tillämpningsanvisning:förvaltning version 2014,,,,,,, Innehåll: MALL för Leveransspecifikation med leveransmeddelande DU-instruktioner,,,,,,, ID: 5_…”
- 34_D014_G_001_--_Region_Västmanland_Bilaga_5e4e_G.xlsx — “Rullistor: Detaljeringsgrad: A B C D Förvaltningsmodell Projekteringsmodell Bilaga 4 Förfrågningsunderlag Bilaga 4 Förvaltningshandling Bilaga 4 Projekteringshandling Namn: Region Västmanland Bilaga 4e5e tillämpningsanvi…”
- 44_D014_VS_001_--_Region_Västmanland_Bilaga_5e4e_VS.xlsx — “Rullistor: Detaljeringsgrad: A B C D Förvaltningsmodell Projekteringsmodell Bilaga 4 Förfrågningsunderlag Bilaga 4 Förvaltningshandling Bilaga 4 Projekteringshandling Namn: Region Västmanland Bilaga 4e5e tillämpningsanvi…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 21 FILES
- 4_D014_E_001_--_Region_Västmanland_Bilaga_5e4e_E.xlsx52 KBXLSX
- 2_D014_001_--_Region_Västmanland_bilaga 2_dokumentklasser.pdf243 KBPDF
- 3_D014_001_--_Region_Västmanland_Bilaga 03.pdf158 KBPDF
and 14 other documents
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.