Published

    Redacción Plan Especial, Proyecto de Ejecución, Dirección Facultativa y Coordinación de Seguridad y Salud del nuevo centro de salud de Arrigorriaga

    Notice number: 2026/01391

    🇪🇸 SpainOSAKIDETZA - Servicio Vasco de Salud -Director General

    KEY INFORMATION

    Submission deadline
    Sep 14, 2026
    Location
    🇪🇸 Spain
    Contracting authority
    OSAKIDETZA - Servicio Vasco de Salud -Director General
    Accepted Languages
    Spanish
    Tender type
    Contract Value
    Published date
    Jul 27, 2026

    TENDER DESCRIPTION

    This tender seeks technical assistance for the drafting of a Special Plan, Executive Project, Faculty Management, and Coordination of Safety and Health for the new Arrigorriaga health center. The comprehensive scope includes an Acoustic Study (with railway vibration impact), Basic Project for licensing, and a detailed Executive Project encompassing technical reports, plans, specifications, budget, and various studies (geotechnical, safety and health, waste management, quality control, energy certification). Services further extend to Construction Management, Execution Management, and Safety and Health Coordination, including plan approval. Bidders must demonstrate a minimum annual turnover equal to or greater than the tender amount, based on the highest turnover in the last three available financial years, and declare specified financial ratios. The project timeline is structured into distinct phases, including 3 months for the Special Plan, 4 months for the Executive Project following Basic Project approval, and an estimated 24 months for Faculty Management and Safety and Health Coordination, with no contract extensions permitted.

    TENDER BRIEF

    The contract timeline is as follows:

    • Contract start date: From the date of formalization of the contract.
    • Contract end date: Null (not explicitly stated as a fixed date, but tied to phase completion).
    • Total duration: The duration for the "Dirección de Obra, Dirección de Ejecución de Obra y Coordinación de Seguridad y Salud" phase is estimated at 24 months, corresponding to the duration of the works.
    • Key milestones or phases:
    • Plan Especial: 3 months, starting from the formalization of the contract.
    • Estudio de vibraciones: 3 months, starting from the formalization of the contract.
    • Proyecto Básico: 3 months, starting from the formalization of the contract.
    • Proyecto de Ejecución: 4 months, starting from the approval of the Basic Project.
    • Dirección de Obra, Dirección de Ejecución de Obra y Coordinación de Seguridad y Salud: Corresponds to the estimated 24-month duration of the works.
    • Entrega documentación final de obra: 45 days, starting from the date of the work reception act.
    • Contract extension (Prórroga): Not permitted.

    Sources

    • 1Pliego de Cláusulas Administrativas Particulares-2026 01391 02 PCAP.pdf — “CONTRATO: DURACIÓN DEL CONTRATO O PLAZO DE EJECUCIÓN. PRÓRROGA 6.1. Duración Total o Plazo de Ejecución Total o Fecha Límite 7. 8. Se fijan los siguientes plazos para las diferentes fases del contrato: Plan Especial | 3…

    The core scope of work and statement of work summary for this tender involves the technical assistance for the drafting of a Special Plan, the Executive Project, Faculty Management, and the Coordination of Safety and Health for the new Arrigorriaga health center.

    The specific deliverables and activities encompassed by the contract include:

    • Drafting of the Special Plan.
    • Acoustic Study, which must include the impact of vibration from the railway network.
    • Drafting of the Basic Project, providing all necessary documentation for license application.
    • Drafting of the Executive Project, which comprises:
    • A technical Report (Memoria).
    • Plans (Planos).
    • Conditions Specification (Pliego de Condiciones).
    • Measurements and Budget (Mediciones y presupuesto).
    • Geotechnical Study (Estudio Geotécnico).
    • Safety and Health Study (Estudio de Seguridad y Salud).
    • Construction and Demolition Waste Management Study (Estudio de Gestión de Residuos de Construcción y Demolición).
    • Quality Control Plan (Plan de Control de Calidad).
    • Energy certification of the projected building (Certificación energética de edificio proyectado).
    • Faculty Management (Dirección Facultativa), including:
    • Construction Management (Dirección de Obra).
    • Execution Management (Dirección de Ejecución de Obra).
    • Coordination of Safety and Health (Coordinación de Seguridad y Salud).
    • Approval of the Safety and Health Plan (Aprobación Plan de Seguridad y Salud).

    Sources

    • 1Documento anexo-2026 01391 04 DOUEL.pdf — “exclusión puramente nacionales 518003-2026 Page 1/5 5. Lote 5.1. Lote: LOT-0001 Título: Redacción Plan Especial, Proyecto de Ejecución, Dirección Facultativa y Coordinación de Seguridad y Salud del nuevo centro de salud…
    • 2Pliego de Prescripciones Técnicas-2026 01391 PPT Proy. Ejecución C.S. Arrigorriaga.pdf — “46 9.1. Muestras | 46 9.2. Presentación de producto: | 46 9.3. Visita de obra | 46 10. LUGAR Y PLAZOS DE ENTREGA / PLAN DE PUESTA DE MARCHA. | 46 Araba kalea, 45-01006 VITORIA-GASTEIZ Tfnoa. 945006000 www.osakidetza.eusk…
    • 3Pliego de Cláusulas Administrativas Particulares-2026 01391 02 PCAP.pdf — “€ Proyecto Básico | 103.800,00 € Proyecto de ejecución | 77.900,00 € Estudio de Seguridad y Salud | 8.300,00 € Plan de Control de Calidad | 4.400,00 € Dirección de obra | 77.900,00 € Dirección de ejecución de obra | 77.9…

    Login to view all answers and insights

    Unlock tender brief for free

    TENDER DOCUMENTS

    DIRECTORY • 18 FILES

    • Memoria justificativa-2026 01391 Memoria Proy. Ejecución nuevo C.S. Arrigorriaga.pdf
    • README.txt
    • Documento anexo-2026_01391_PlantillaJuicioValor.xlsx

    and 11 other documents

    Login to view and download all tender documents

    Unlock documents for free

    ASK AI ABOUT THIS TENDER

    You

    Can a foreign company apply?

    Riko

    Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.

    Login to ask more questions.

    Unlock AI tender chat for free

    Unlock your tender workflow

    Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.

    First monitor on Day 1All features included in trialNo credit card required

    You may also be interested in

    Similar tenders