Published
Refonte d’architecture avec migration de données des outils de gestion et de suivi des aides de l’ONaCVG au profit de ses bénéficiaires, destiné à remplacer les applications existantes.
Notice number: 00566052-2026
KEY INFORMATION
- Submission deadline
- • Sep 15, 2026
- Location
- 🇫🇷 France
- Contracting authority
- Onacvg
- Accepted Languages
- French
- Tender type
- Services
- Contract Value
- Published date
- Aug 14, 2026
TENDER DESCRIPTION
This tender invites proposals for custom development services encompassing the architectural redesign and data migration of ONaCVG's aid management and monitoring tools, intended to replace existing applications. The comprehensive scope of work includes project initiation, system development, integration, and commissioning, data analysis and migration, ongoing support and training, and reversibility services. The solution must adhere to specified technical requirements, utilizing technologies such as TypeScript, React, Node.js with NestJS, PostgreSQL 16+, Keycloak for SSO, OCI (Docker) containerization, GitLab for CI/CD, and conform to RGAA 4.1 accessibility standards, targeting a modular monolith architecture. The framework agreement has an initial duration of one year, renewable up to a maximum of 48 months, with a provisional contract start in Q4 2026 and a 6-month application deployment phase from January 1 to June 30, 2027, aiming for full system functionality by October 1, 2027. Candidates are required to provide a declaration of their last known global turnover as proof of financial standing.
TENDER BRIEF
The contract timeline is structured as follows:
The framework agreement has an initial duration of one year starting from its notification date. It can be tacitly renewed three times, each for one year, leading to a maximum total duration of 48 months (4 years). The provisional start date for the execution of the contract is set for the last quarter of 2026.
Key milestones and phases include:
- Application Deployment/Development Phase: This phase is scheduled for a 6-month period, from January 1, 2027, to June 30, 2027. The application must be fully deployed and functional by October 1, 2027.
- Step 1: This initial phase involves a project launch meeting, defining the technical requirements, documenting decisions, establishing the system architecture, creating a project plan, outlining the migration strategy, and listing functionalities to be configured. Deliverables include a detailed project schedule, a document describing functionalities and circuits, and the implementation strategy.
- Step 2: This step focuses on the implementation of the system functionalities and circuits. Following this, a preliminary version of the application will be made available for a two-month evaluation period, from July to August 2027.
- Step 3: This phase includes an initial presentation and training provided by the contractor to designated trainers. A final data migration is to be performed just before the system goes into production, with a maximum duration of 2 working weeks (14 calendar days).
- Step 4: This final step involves the production launch of the new tool. The contractor has 30 days to issue a "procès-verbal de mise en ordre de marche" (statement of readiness), which ONaCVG will validate upon verification of implemented requirements, workflows, and functionalities. Following the production launch, ONaCVG will conduct a suitability verification.
Sources
- 101 RC Refonte Architecture 26012.pdf — “à marchés subséquents. Les prestations à bons de commandes et marchés subséquents sont exécutés : − soit par l’émission de bons de commande, selon les dispositions des articles R. 2162-13 et R. 2162-14 du Code de la comm…”
- 205 CCAP Refonte Archi 26012.pdf — “publique ; − soit par la conclusion de machés subséquents, selon les dispositions des articles R. 2162-7 à R. 2162-12 du Code de la commande publique. Montant minimum Montant maximum Sans minimum 180 000 € HT Le montant…”
- 306 CCTP Refonte Archi 26012.pdf — “une période de 6 mois, du 1er janvier 2027 au 30 juin 2027 et devra être entièrement déployée et fonctionnelle pour le 1 er octobre 2027. Etape 1 : Le projet démarre par une réunion de lancement avec l’ensemble des équip…”
The core scope of work for this tender involves the architectural redesign and data migration of ONaCVG's management and aid monitoring tools.
The key activities include:
- Project Initiation and Planning: Launch meeting, defining technical requirements, documenting decisions, establishing system architecture, project planning, and migration strategy.
- System Development and Implementation: Conception, parameterization, development, integration, and commissioning of modules; managing profiles, roles, and authorizations; providing consultation, control, and validation screens; managing digitized documents; implementing security and RGPD compliance; and supporting production deployment.
- Data Management: Analysis of ONaCVG data, proposing mappings, tools, and procedures for data conversion and integration.
- Support and Training: Providing a training program and technical support (levels 2 and 3) during the warranty period.
- Reversibility Services: Organizing a reversibility launch meeting and providing all necessary documentation and assets for the transfer of the system.
Core deliverables include:
- A detailed and definitive project schedule.
- Documents outlining implemented functionalities, circuits, and their staggered implementation.
- Technical, functional, and operational deliverables.
- Application and documentary repositories (including configuration status, test data, and maintained follow-up documents).
- Training documents, developed procedures, scripts, and a knowledge base.
- All maintained software, source codes, components, executables, and necessary batches.
- Comprehensive technical documentation, including the Technical Architecture Dossier (DAT), installation, operation, administration, and usage procedures.
- Design and user documentation (manuals, online help).
- A reversibility report and a formal certification of data destruction.
The project timeline specifies a 6-month period from January 1, 2027, to June 30, 2027, with the system expected to be fully deployed and functional by October 1, 2027. The platform implementation is planned for September 2027.
Sources
- 104 MJO Refonte Archi 26012.docx — “Département des Achats | | MÉMOIRE JUSTIFICATIF DE L’OFFRE Consultation № 26012 : refonte d’achitecture avec migration de données des outils de gestion et de suivi des aides de l’ONaCVG Entreprise : ……………………………………………… №…”
- 206 CCTP Refonte Archi 26012.pdf — “une période de 6 mois, du 1er janvier 2027 au 30 juin 2027 et devra être entièrement déployée et fonctionnelle pour le 1 er octobre 2027. Etape 1 : Le projet démarre par une réunion de lancement avec l’ensemble des équip…”
- 305 CCAP Refonte Archi 26012.pdf — “; − de transmettre l’état de configuration de tous livrables et documents produits dans le cadre du projet ; − de fournir tous les documents de suivi relatifs à l’ensemble des actions de maintenance ; − de restituer les…”
Login to view all answers and insights
Unlock tender brief for freeTENDER DOCUMENTS
DIRECTORY • 8 FILES
- 02 AE Refonte Architecture 26012.docx76 KBDOCX
- 03 BPU-SDC Refonte Archi 26012.xls1.3 MBXLS
- 01 RC Refonte Architecture 26012.pdf456 KBPDF
and 1 other document
Login to view and download all tender documents
Unlock documents for freeASK AI ABOUT THIS TENDER
Can a foreign company apply?
Yes, foreign companies can apply as long as they meet all the requirements set out in the procurement documents.
Login to ask more questions.
Unlock AI tender chat for freeUnlock your tender workflow
Run your first search, evaluate the results, save a daily monitor and start building a pipeline of tenders worth pursuing.